  #3581  
Old Posted Aug 10, 2008, 10:53 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,041
you'd have to be suicidal to want to ride a bike down no3 road anyway - lol

there are other options for bikers at least in the area

a pic of the bridge - taken by me aug 9

__________________
belowitall
     
     
  #3582  
Old Posted Aug 10, 2008, 11:46 PM
cc85 cc85 is offline
Registered User
 
Join Date: Apr 2006
Location: Island City
Posts: 451
no.3 has put to shame lougheed highway, burnaby did such a poor job in places where the speed limit is reduced. i can undertand the need not to adequately design pedestrian elements in areas of faster speeds, but all across the board there is nothing.

burnaby has no downtown, if anything were to compare to that it would be brentwood and lougheed town centres. Both are sprawl city and will have a hard time converting. richmond is really on track with their downtown. The next challenge will be to integrate bridgepoint with landsdown et al.
     
     
  #3583  
Old Posted Aug 11, 2008, 12:30 AM
WBC WBC is offline
Transit User
 
Join Date: Aug 2007
Location: Metrotown/Downtown
Posts: 810
Well after all the life is better under the sea...under the sea... ;-)
     
     
  #3584  
Old Posted Aug 11, 2008, 12:44 AM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,485
Haha, nice one.
     
     
  #3585  
Old Posted Aug 11, 2008, 3:23 AM
amor de cosmos amor de cosmos is offline
BANNED
 
Join Date: Jun 2005
Location: lodged against an abutment
Posts: 6,750
almost done....

Quote:
According to the latest quarterly report from the Canada Line office, construction on the project is 80 per cent complete.

Though there is still work going on in some areas, much of Cambie Street is getting back to normal.

That's welcome news for businesses that have taken serious financial hits or even been forced to move because construction prompted a drop in customers.

"We know we're dropping quite a bit, but we've been here a long time so we're still surviving finally, but it's passed so what can we do?" said Julie Tsui of Julie's Hair Design.

"We just look forward, what else can we think?" she said.

The Canada Line is the name for a rapid SkyTrain-type project that would take passengers between Richmond, the Vancouver International Airport, and downtown Vancouver.

The $1.9-billion project is expected to begin service in 2009.

With much of the heavy lifting and heavy digging done, the focus is now on the finishing stages such as work on the Canada Line stations.
http://www.ctvbc.ctv.ca/servlet/an/local..._Canada_Line_Nearly_Done_080810/20080810
     
     
  #3586  
Old Posted Aug 12, 2008, 1:26 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,041
End to Cambie commuter chaos in sight

Business association intends to file a class-action suit seeking up to $40 million in damages

The end finally appears within sight for the commuter chaos that has crippled Cambie Street since the summer of 2005.

InTransitBC, the company in charge of the massive $2-billion Canada Line construction project, is lifting many of the traffic restrictions that have made travelling along Cambie, or trying to get across it, a nightmare.

Cut-and-cover construction along much of the rapid transit line linking Richmond and Vancouver International Airport with downtown Vancouver has exacerbated the problems.

Original plans calling for bored tunnel construction were changed to reduce costs.

Steve Crombie, spokesman for InTransitBC, said many of the intersections will be turned over to the City of Vancouver for paving, signal installation and line painting between mid-October and December.

Donny Wong, manager of Vancouver's rapid transit office, said the city will complete its work as quickly as possible after InTransitBC clears out, with the goal of reopening streets to regular traffic within two weeks.

"We all want people to have as much access as possible to the street for Christmas shopping season," Wong said.

Cambie Village Business Association director Leonard Schein remained somewhat skeptical.

"We are certainly looking forward to the end of [construction]," said Schein, who estimated his Park Theatre has lost more than $200,000 due to the construction. However, he is less than optimistic about the city's ability to finish its own work quickly.

InTransitBC finished with Cambie in front of the Park Theatre, between 18th and 19th Avenues, last November, but it still hasn't been put back together completely.

"The sidewalks are not totally finished yet," Schein said.

He said there are still traffic cones keeping traffic to one lane in parts of his neighbourhood.

Schein said he expects merchants in the area to file an application for a class-action lawsuit in B.C. Supreme Court next month. He estimated they could seek damages between $20 million and $40 million if the suit is accepted.

Several Cambie companies have gone out of business since construction began and many remaining merchants have complained they've lost massive amounts of money because customers couldn't get to the area or gave up trying.

When the Canada Line is up and running in November 2009, many bus routes will be changed, TransLink spokesman Ken Hardie has warned travellers.

"When you have a high-capacity rapid transit, it becomes like that backbone and the bus system becomes like the ribs feeding into it."

In an interview, he said many east-west routes will feed into Canada Line stations. Buses serving areas south of the Fraser River will connect with the rapid transit line as well.

He said commuters from places such as Richmond might be disappointed that they will have to transfer from buses that have always taken them straight downtown to the Canada Line. But offsetting that inconvenience is the attraction of having more frequent bus service linking with the line than exists now, Hardie said.

Cambie south of 15th Avenue has been open to limited traffic since last November, but work on the stations at 49th Avenue, 41st Avenue, King Edward and Broadway is still impeding traffic flow.

Crombie predicted InTransitBC will be ready to turn over the intersection at 49th and Cambie by the end of September, the north-south temporary bridge over 41st and Cambie should be removed by the end of October and the intersections at 29th Avenue, King Edward and Broadway should be filled in and handed over to the city by the end of September.

The area between 11th Avenue and Broadway still requires work on the utilities along the west side, which will continue until mid- or late December.

http://www.canada.com/vancouversun/news/...?id=e366a1da-b5f8-4fee-8cff-9c88b94860a4
__________________
belowitall
     
     
  #3587  
Old Posted Aug 14, 2008, 4:20 AM
Gordon Gordon is online now
Registered User
 
Join Date: Jul 2008
Posts: 1,065
Smile

How do the platform lengths on the CL compare with the current platform lengths on the Expo Line?


I wonder why the service plan for the Canada Line has the same service levels for both Peak periods & mid day?


Gordon
     
     
  #3588  
Old Posted Aug 14, 2008, 4:45 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Wow I better answer ur question before others get mad: 40m C-Line and 80m E-Line & M-Line
     
     
  #3589  
Old Posted Aug 14, 2008, 6:02 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Gordon View Post
How do the platform lengths on the CL compare with the current platform lengths on the Expo Line?


I wonder why the service plan for the Canada Line has the same service levels for both Peak periods & mid day?


Gordon
The Canada Line platforms (40m) are half the length of the Expo Line platforms (50m), with the exception of the Canada Line's high volume stations which are built to 50-metres: Waterfront, City Centre, Yaletown, Broadway, Oakridge, YVR Airport, and Brighouse.

As for frequency, there's a demand for that....note that a 3min45sec wait in Vancouver translates to a 7+ min wait in Richmond/YVR, and that's quite long considering it's peak and mid-day. If they had bought more trains, I'm sure frequency would be higher.
     
     
  #3590  
Old Posted Aug 14, 2008, 3:07 PM
Gordon Gordon is online now
Registered User
 
Join Date: Jul 2008
Posts: 1,065
I wonder why they didn't include a 50m platform @ Bridgeport seeing as that will be the main Park and Ride location & the main commuter bus connection from South of the Fraser?

Hoe much are they planning to expand the Expo Line plat forms by?

I suspect in the fall of 09 when the 1st shipment of new skytrain car arrive we will see the return of the 6 car mark 1 car trains to increase capacity.
     
     
  #3591  
Old Posted Aug 14, 2008, 5:52 PM
randito randito is offline
Registered User
 
Join Date: Aug 2008
Posts: 36
Quote:
Originally Posted by mr.x2 View Post
The Canada Line platforms (40m) are half the length of the Expo Line platforms (50m), with the exception of the Canada Line's high volume stations which are built to 50-metres: Waterfront, City Centre, Yaletown, Broadway, Oakridge, YVR Airport, and Brighouse.

As for frequency, there's a demand for that....note that a 3min45sec wait in Vancouver translates to a 7+ min wait in Richmond/YVR, and that's quite long considering it's peak and mid-day. If they had bought more trains, I'm sure frequency would be higher.
I just moved to montreal and here the metro's platforms / trains are 150 m long. They are driven by humans, so at night the frequency drops to like one ever 12 minutes, but at rush hour they are PACKED at a frequency of one ever 3 minutes. They had to remodel the cars to remove a lot of seats and put more poles for standing people and still there can be a 4-5 train wait at rush hour on the orange line.

If you are interested in comparing the montreal system to what vancouvers is going to be like, check out this site:

http://www.metrodemontreal.com/

especially check out how ingeniously the lionel-groulx station is done, and compare it to broadway/commercial. Shame vancouver! and robson / granville stations? shame again!

but for a little vancouver pride, check out the silly laval extension and see how overbudget and how late this simple 3 station extention went, then look with pride at how all our projects seem to be underbudget and delivered on time in vancouver. in vancouver, we get things DONE!
     
     
  #3592  
Old Posted Aug 14, 2008, 6:26 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by randito View Post
http://www.metrodemontreal.com/

especially check out how ingeniously the lionel-groulx station is done, and compare it to broadway/commercial. Shame vancouver! and robson / granville stations? shame again!
It would be pretty difficult to do the same thing at Broadway/Commercial. Commercial Station would need to be more elevated to allow a "non-stair" transfer. I agree that this transfer could've been better planned, though.
     
     
  #3593  
Old Posted Aug 14, 2008, 6:31 PM
vanlaw vanlaw is offline
Registered User
 
Join Date: Oct 2007
Posts: 667
Quote:
Originally Posted by randito View Post
I just moved to montreal and here the metro's platforms / trains are 150 m long. They are driven by humans, so at night the frequency drops to like one ever 12 minutes, but at rush hour they are PACKED at a frequency of one ever 3 minutes. They had to remodel the cars to remove a lot of seats and put more poles for standing people and still there can be a 4-5 train wait at rush hour on the orange line.

If you are interested in comparing the montreal system to what vancouvers is going to be like, check out this site:

http://www.metrodemontreal.com/

especially check out how ingeniously the lionel-groulx station is done, and compare it to broadway/commercial. Shame vancouver! and robson / granville stations? shame again!

but for a little vancouver pride, check out the silly laval extension and see how overbudget and how late this simple 3 station extention went, then look with pride at how all our projects seem to be underbudget and delivered on time in vancouver. in vancouver, we get things DONE!
Apparently Montreal ended up with a rubber-tire metro system because then-mayor Jean Drapeau was so enamored with Paris generally that he wanted to replicate their metro system (and essentially wanted Montréal to be Paris).

After seeing how long their trains are, and how many tires each requires, I would imagine the annual replacement cost is pretty crazy today.
     
     
  #3594  
Old Posted Aug 14, 2008, 8:00 PM
randito randito is offline
Registered User
 
Join Date: Aug 2008
Posts: 36
Quote:
Originally Posted by vanlaw View Post
Apparently Montreal ended up with a rubber-tire metro system because then-mayor Jean Drapeau was so enamored with Paris generally that he wanted to replicate their metro system (and essentially wanted Montréal to be Paris).

After seeing how long their trains are, and how many tires each requires, I would imagine the annual replacement cost is pretty crazy today.
Paris's justification was noise, but montreal's justification was that rubber tires can handle a much greater grade. But yeah syktrain is cheap to run, the montreal metro requires drivers, just in case, even though the trains are controlled from a central location, and a person to sell tickets at each station entrance. the union goes on strike more often than you can imagine, so a LOT of money is wasted on their salaries. and they are not even nice to you. scary. loving vancouvers no turnstyle system. much more pragmatic.
     
     
  #3595  
Old Posted Aug 14, 2008, 8:42 PM
vanlaw vanlaw is offline
Registered User
 
Join Date: Oct 2007
Posts: 667
Quote:
Originally Posted by randito View Post
and a person to sell tickets at each station entrance.
I've never understood this about Montreal or Toronto - it seems brutally antiquated to have someone sit in a booth and watch you drop you ticket into the little box. Montreal is gradually shifting though. They have automated machines at Outremont station now, but have to have a staff member sit there to show people how to use it!
     
     
  #3596  
Old Posted Aug 14, 2008, 10:03 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,631
Once turnstiles are implemented in Vncaouver, they will have to be staffed - in case someone can't get through, mechanical problem, etc. - that's why it's not cost effective to install them - not the capital costs - but the operational costs...
     
     
  #3597  
Old Posted Aug 14, 2008, 10:28 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,614
Quote:
Originally Posted by officedweller View Post
Once turnstiles are implemented in Vncaouver, they will have to be staffed - in case someone can't get through, mechanical problem, etc. - that's why it's not cost effective to install them - not the capital costs - but the operational costs...
But what is it that brings a peace of mind to travelers? Somebody on site watching passengers, or turnstiles making sure that nobody is riding for free.

I'd argue both are good, but you can't seem to get one without the other.
     
     
  #3598  
Old Posted Aug 14, 2008, 10:56 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,631
The attendant is required because of the equipment safety/malfunction factor (not eyes on the passengers for security) - i.e. since it is a barrier to baby strollers, people with luggage, etc. and a malfunction would effectively bar someone (or many) from the system.
     
     
  #3599  
Old Posted Aug 15, 2008, 2:57 AM
randito randito is offline
Registered User
 
Join Date: Aug 2008
Posts: 36
Quote:
Originally Posted by officedweller View Post
The attendant is required because of the equipment safety/malfunction factor (not eyes on the passengers for security) - i.e. since it is a barrier to baby strollers, people with luggage, etc. and a malfunction would effectively bar someone (or many) from the system.
A little quebec cynicism for you. the attendant is required because the union says the attendant it required.

seriously, the are there so that everyone doesn't just jump the turnstyle, which I admit, during a turnstyle malfunction, i do. turnstyle malfunctions are NOT FUN for male transit riders!!!!

quite frankly, when the new machines they brought in (they are across the system, not just at outremont) , perhaps they won't be required at EVERY entrance. some stations like laurier and jean-talon have automated turnstiles that don't allow people to jump, they have these slidy timed doors. not really cool to watch slower elderly people almost get sliced in 2!

really, it is terribly complicated with the turnstiles, vancouver's system is great for its simplicity and cost-effectivness. say no to turnstyles. please.

SLIDY DOOR HUMAN SLICER:

and while i am posting images, the lionel-groulx station i was talking about where it is EASY to switch lines unlike commercial/broadway:


CAN ANYONE TELL ME WHY THESE IMAGES DON'T SHOW??

Last edited by randito; Aug 16, 2008 at 1:51 PM.
     
     
  #3600  
Old Posted Aug 15, 2008, 4:11 AM
Gordon Gordon is online now
Registered User
 
Join Date: Jul 2008
Posts: 1,065
Smile

The MarkII Cars are designed to have a 3rd car added in the middle of the (with the articulated ends) with the extended platforms it may be possible to insert 1 of those cars in the middle of 1 of the 2 car units too make a 5 car train.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:46 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.