HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India


Reply

 
Thread Tools Display Modes
     
     
  #3141  
Old Posted Jul 22, 2008, 6:36 AM
bhasidali bhasidali is offline
 
Join Date: Aug 2006
Posts: 138
Read some facts about Choice Paradise...

* 126m tall..
* Completes one floor on each 8 days.
* will complete 25 floor on this December.
* 5 Hi speed lifts with 2.5 per sec.
* Reach 40th floor on 1 min.
* Lighting on the top like empire state building.
* can see the radius of 18 miles (upto cherthala)
* spread light of each color on each day of week
etc..etc..

http://www.mathrubhumi.com/2008_customimages/news/PF121283_50bis8.pdf

Last edited by bhasidali; Jul 22, 2008 at 6:56 AM.
Reply With Quote
     
     
  #3142  
Old Posted Jul 23, 2008, 4:46 PM
Mr.kochi Mr.kochi is offline
 
Join Date: Mar 2008
Posts: 2
good to see a lot of developments are taking place in kochi ... have been 2 yrs since i left ...... just went through this forum and was surprising to know a lot of hotels coming up .....

shall we dicuss the current status of all new hotels coming up in kochi... and state the one which are already there, inorder to have a number on how many hotels we will have in the future....

can some one who is currently in kochi or has the informations, list it out along with the name, location, group which is promoting it, its star category, its status wether its ready, under construction, proposed etc ....
Reply With Quote
     
     
  #3143  
Old Posted Jul 26, 2008, 5:13 AM
PLUS PLUS is offline
 
Join Date: Oct 2007
Posts: 765
A few mega projects from environment ministry. Read more at Kochi Now Forums

Sobha Hitech city - asked to resubmit

Quote:
Construction of Sobha HI-tech City at village Maradu, Cochin by M/s. Sobha Developers Ltd (No:21-170/2008-IA.III)

The project involves construction of a township on a plot area of 10,35,995 Sq.m. The total builtup area is 22,65,672.8 Sq.m. The total water requirement is 9236 KLD (fresh water requirement is 6031 KLD). Treated waste water to be used for flushing of toilets 2585 KLD, horticulture 512 KLD, AC cooling 108 KLD and irrigation ? 3000 KLD. Total solid waste generation will be 45 Tons/day. The power requirement is 100 MW. The total parking spaces proposed are for residential 15,000 cars and 3000 two wheelers and for commercial ? 4814 ECS. Total cost of the project is Rs. 5000 Crores.


In view of the foregoing observations, the proposal is not recommended for environmental clearance. The proposal shall be considered afresh after the above observations are addressed and proposal is submitted for reconsideration.
TCS - asked to resubmit

Quote:
Construction of Software Development Complex (IT Park) at Kochi, Kerala by M/s. Tata Consultancy Service (No:21-167/2008-IA.III)



The project involves construction of software complex on a plot area of 63616.53 Sq.m. The total builtup area is 1,16,390.07 Sq.m. It is proposed to develop a complex having of 8000 working employees. The total water requirement is 385 KLD (fresh water requirement is 200 KLD). The capacity of STP proposed is 360 KLD. Treated waste water to be used for flushing of toilets 160 KLD, horticulture 30 KLD, AC cooling 170 KLD. Total solid waste generation will be 2249 Kg/day, STP sludge ? 180 Kg/day. The power requirement is 8000 KVA. The total parking spaces proposed are for 1787 cars (MLCP) and 1500 two wheelers and 10 bus parking spaces. Total cost of the project is Rs. 234.44 Crores.

...

In view of the foregoing observations, the proposal is not recommended for environmental clearance. The proposal shall be considered afresh after the above observations are addressed and proposal is submitted for reconsideration.
Parsvnath - asked to resubmit

Quote:
4.13 Construction of IT/ ITeS (SEZ) at Nedumbassery village, Chengamanadu village, Alwa Taluka, Enakulam distt, Kerala by M/s. Parsvnath Developers Ltd. (No:21-162/2008-IA.III)

The project involves construction of IT/ITES SEZ on a plot area of 3,07,600 Sq.m. (Processing area ? 2,15,300 sq.m., non-processing area ? 92,300 sq.m.). The total builtup area is 13,37,997.03 Sq.m. The total water requirement is 12,483 KLD (fresh water requirement is 4712 KLD). The capacity of STP proposed is 10,610 KLD. Treated waste water to be used for flushing of toilets 7771 KLD, horticulture 100 KLD, AC cooling 1678 KLD. Total solid waste generation will be 7011 Kg/day. The power requirement is 1,45,139 KVA.


During discussions, the following points emerged:



(i) The project falls under category ?B1? under item 8(b) ? Township and Area Development projects and requires an Environmental Impact Assessment Study, the total built up area of the project is more than 1,50,000 sq.m. and the site is outside municipal limits and development area limits, the site is 4 to 7 m lower than the new road near it and it is also very close to the airport, so the project proponents were advised to submit the ...

In view of the above, the Committee recommends for the submission of draft TOR by the project proponent.
Apple Ice - recommended

Quote:
4.18 Construction of Group Housing ?Apple Ice? at Manjummel, Eloor Village, Parur Taluk, Kochi, Kerala by M/s. Apple-A-Day Properties (P) Ltd. (No:21-198/2008-IA.III)



The project involves construction of housing project on a plot area of 11,210 sq.m. The total builtup area is 57,145 Sq.m. It is proposed to construct 464 flats (1 BR ? 88, 2 BR ? 154, 3 BR ? 220 and Pent house ? 2) in 3 blocks (Basement + Ground Floor + First Floor + 22 floors). The total water requirement is 306.24 KLD (fresh water requirement is 169.88 KLD). The capacity of STP proposed is 375 KLD. Treated waste water to be used for flushing of toilets - 111.36 KLD, horticulture - 15 KLD, washing paved area - 10 KLD. Total solid waste generation will be 928 Kg/day. (Bio-medical waste ? 464 and non-bio medical waste ? 464. The power requirement is 1500 KVA. The total parking spaces proposed are for 471 cars (Basement ? 79, Ground Floor ? 134, First Floor ? 134 and surface ? 124) + 135 two wheelers (Basement ? 11, Ground Floor ? 62 and First Floor ? 62). Total cost of the project is Rs. 65.65 Crores.


Provided the response of the project proponent to the aforesaid observations is to the satisfaction of the Committee, the proposal may be considered for recommendation for environmental clearance.
Reply With Quote
     
     
  #3144  
Old Posted Jul 27, 2008, 2:03 PM
KMC KMC is offline
 
Join Date: Dec 2006
Posts: 473
Reply With Quote
     
     
  #3145  
Old Posted Jul 28, 2008, 4:38 AM
PLUS PLUS is offline
 
Join Date: Oct 2007
Posts: 765
Infosys compliments Kochi again

Infosys states that Kochi is most attractive in Kerala for people in IT
industry to move in as it is the more cosmopolitan. This
is the second time Infosys has appreciated the importance of Kochi.

Quote:
people in the IT industry are very mobile. They can work in any part of India, any part of the world. There are lots of jobs. So we have to go where people want to go. Kochi, for example, is more cosmopolitan. T.V. Mohandas Pai, board member and head of Human Resources Department, Infosys.
http://www.hindu.com/2008/07/28/stories/2008072857810200.htm
Reply With Quote
     
     
  #3146  
Old Posted Jul 28, 2008, 8:04 AM
bhasidali bhasidali is offline
 
Join Date: Aug 2006
Posts: 138
MRG Group is planning to invest 30 crore in Kochi...

http://mathrubhumi.com/2008_customimages/news/PF121318_51bis3.pdf

Reply With Quote
     
     
  #3147  
Old Posted Jul 28, 2008, 8:06 AM
bhasidali bhasidali is offline
 
Join Date: Aug 2006
Posts: 138
Quote:
Originally Posted by KMC View Post
SRK Lotus Point, Kochi
Reply With Quote
     
     
  #3148  
Old Posted Jul 28, 2008, 10:33 AM
abhilash abhilash is offline
 
Join Date: Jul 2007
Posts: 215
Quote:
Originally Posted by bhasidali View Post
MRG Group is planning to invest 30 crore in Kochi...

http://mathrubhumi.com/2008_customimages/news/PF121318_51bis3.pdf

I think its for a 5 Star Hotel
Somebody kindly confirm
Reply With Quote
     
     
  #3149  
Old Posted Jul 28, 2008, 12:23 PM
Santhosh Santhosh is offline
 
Join Date: Sep 2007
Posts: 107
Parsvnath

What is the meeaning of this?

Is Govt of Kerala forwarded SEZ request of Parsvnath to Central Govt?




Quote:
Originally Posted by PLUS View Post
A few mega projects from environment ministry. Read more at Kochi Now Forums

Sobha Hitech city - asked to resubmit



TCS - asked to resubmit



Parsvnath - asked to resubmit



Apple Ice - recommended
Reply With Quote
     
     
  #3150  
Old Posted Jul 28, 2008, 1:18 PM
KMC KMC is offline
 
Join Date: Dec 2006
Posts: 473
Quote:
Originally Posted by bhasidali View Post
SRK Lotus Point, Kochi
Yes , same one.

Can you imagine 37 Floor twin towers at Cheppanam!!!!! , but its happening.
Reply With Quote
     
     
  #3151  
Old Posted Jul 28, 2008, 1:39 PM
KMC KMC is offline
 
Join Date: Dec 2006
Posts: 473
Reply With Quote
     
     
  #3152  
Old Posted Jul 28, 2008, 2:04 PM
PLUS PLUS is offline
 
Join Date: Oct 2007
Posts: 765
Quote:
Originally Posted by KMC View Post
Yes , same one.

Can you imagine 37 Floor twin towers at Cheppanam!!!!! , but its happening.
There is a better rendering here
http://www.forum.kochinow.com/
Reply With Quote
     
     
  #3153  
Old Posted Jul 28, 2008, 2:49 PM
pramodusnair pramodusnair is offline
 
Join Date: Dec 2006
Posts: 285
List of projects coming up in Ernakulam.
http://www.ibef.org/download/Kerala_21may.htm
Reply With Quote
     
     
  #3154  
Old Posted Jul 29, 2008, 8:23 AM
scorpiogenius scorpiogenius is offline
 
Join Date: May 2007
Posts: 62
Quote:
Originally Posted by KMC View Post
Yes , same one.

Can you imagine 37 Floor twin towers at Cheppanam!!!!! , but its happening.

Is it such a remote place? I checked it on Wikimapia and it appears just off the NH Bypass and adjascent to the Shobha City.
Reply With Quote
     
     
  #3155  
Old Posted Jul 30, 2008, 3:50 AM
abhilash abhilash is offline
 
Join Date: Jul 2007
Posts: 215
Reply With Quote
     
     
  #3156  
Old Posted Jul 30, 2008, 3:52 AM
abhilash abhilash is offline
 
Join Date: Jul 2007
Posts: 215
Does anybody know what happens to HDIL Cybercity
Is the project progressing
or
Have they withdrawn from the project
Reply With Quote
     
     
  #3157  
Old Posted Jul 30, 2008, 4:02 AM
abhilash abhilash is offline
 
Join Date: Jul 2007
Posts: 215
Finishing school to come up in Kochi too

THIRUVANANTHAPURAM: The State government is opening another Model Finishing School (after the first one in the capital city that has just completed training for its inaugural batch) in Kochi next month.

Together, the two finishing schools, being run under the joint auspices of Institute of Human Resources Development and Kerala State Information Technology Mission with the support of IT major Infosys, will have a student intake of 180 for each batch of 45 days’ duration.

Almost all the 25 students in the first batch of the school in Thiruvananthapuram have received lucrative postings in major IT companies in the country, according to the Model Finishing School Director V.A. Arunkumar. These students will have their convocation on Wednesday at a function at the seminar hall of Kerala State Science and Technology Museum here.

The Thiruvananthapuram school has invited applications from those wanting to join its second batch scheduled to commence training on August 8. The last date for submitting applications is August 2. The application form can be downloaded from the website www. modelfinishingschool.org.

Unemployed youth with B.Tech, MCA, or M.Sc. (Computer Science/IT) qualification can apply. They should have obtained 60 per cent marks. B.Tech. students from all streams awaiting final results too can apply.

http://www.hindu.com/2008/07/30/stories/2008073060480500.htm
Reply With Quote
     
     
  #3158  
Old Posted Jul 30, 2008, 4:05 AM
abhilash abhilash is offline
 
Join Date: Jul 2007
Posts: 215
Preparations on for Volvo Ocean Race

KOCHI: The final plan for the Race Village to be built near the BTP Berth of the Kochi Port for the Volvo Ocean Race India Stopover in December here has been finalised by Volvo Event Management U.K. and the Cochin port Trust.

Locations for the finish of the second leg of the Volvo Ocean Race arriving from Cape Town and the Start line for the third leg from Kochi to Singapore have also been finalised.

Preparation reviewed


Race Director Jack Lloyd, Director Planning and Operations Jeremy Troughton, Events Manger Allison Crook and Operations Manager Rosie Julian were in the city to hold discussions with the Stopover Team. They reviewed the ongoing development activities for the Volvo Ocean Race stopover, the first of its kind experience for an Indian port.

The most important of the preparations work is the construction of the Race Village and the Team Area at the Port premises, which among others, will have a state-of-the-art media centre to cater to the needs of hundreds of global and national media persons who are expected to converge on Kochi for the event. The event will be beamed to 200 countries and will feature a live feed on the Internet.

Race village


The Race Village will also have the International Jury Office for the Race, Race Management Office, Events and Operations Office, Logistics Office besides the media and accreditation offices.

A 600 sq.m. exhibition pavilion will function as a major area for public participation in the Ocean Race Stopover. Parking grounds, additional lines for power and water supplies and reconstruction of existing jetties are among the major facilitation activities. Food courts serving multiple global cuisines will be a major feature during the Stopover.

http://www.hindu.com/2008/07/28/stories/2008072856010300.htm
Reply With Quote
     
     
  #3159  
Old Posted Jul 30, 2008, 4:08 AM
abhilash abhilash is offline
 
Join Date: Jul 2007
Posts: 215
Riding high on luxury

Yachts, the ultimate symbol of luxury, sail into the changing lifestyle of Kochiites.

Kochi is fast turning into a hub of the super rich where a young generation that loves to flaunt and enjoy this status has emerged. There is a visible change in lifestyle choices and attitude towards leisure. From diamond jewellery, airplanes, Merced es, branded clothes; you have a society that is seeking new lifestyle statements. And owning a luxury yacht is the ultimate status symbol.

http://www.hindu.com/mp/2008/07/28/stories/2008072850640100.htm
Reply With Quote
     
     
  #3160  
Old Posted Jul 30, 2008, 10:31 AM
pramodusnair pramodusnair is offline
 
Join Date: Dec 2006
Posts: 285
Quote:
Originally Posted by abhilash View Post
Does anybody know what happens to HDIL Cybercity
Is the project progressing
or
Have they withdrawn from the project
The work is going on in full swing. I saw piling and some foundation works being executed when I passed by the HDIL site near HMT. Also, they have applied for environmental clearance, that means the project is still on.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India
Forum Jump



Forum Jump


All times are GMT. The time now is 3:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.