Quote:
Originally Posted by Franky
...So, LRT is a big sales job - I suspected as much.
|
Absolutely correct!
But as ‘
kyle_olsen’

has pointed out in his post; “There is method to all this madness.” The City needs to change something. It needs to be seen as making a grand step forward toward the future. It doesn’t think that its image is of that of a ‘World-Class’ city since EVERY ‘World-Class’ city has a subway. There are a number of Councilors who are very ‘gung-ho’ about getting trains in this city. Thus, the City needs to convince the people that there needs to be a huge amount of money spent - but don’t worry about the money - on changing our transit system.
Currently the City needs two different transit systems: One for the suburban commuters which offers a fast and direct route from near their homes in the suburbs to their jobs in the downtown core. The other system is an all-day system which connects major destinations, such as schools and shopping areas. Both of these systems would be supported by local buses.
We do not have a very effective all-day network in this city and that has kept the off-peak ridership lower than it could be. I think it would be wise for the City to start to fill in its transit NETWORK by adding new all day routes where people want to go. I think that this is the point that ‘
lrt’s friend’ keeps trying to hammer home.
We do, however have a great system for moving large numbers of commuters to the downtown core. It involves running Express and semi-line-haul buses along a dedicated route. (Yes, off-peak we already run a semi-line-haul system with the 9x series buses. I say ‘semi’ because I believe that a true line-haul line would only have the two end-point stops, where the 9x buses have multiple stops along the routes.)
Part of the problem with the current commuter system is where it is not completely segregated and must run in mixed traffic. Through the core is an excellent example. If the current buses were run through a tunnel, there would be fewer non-bus related delays. That is, there would be no signals to wait for at cross streets, and no interaction with other traffic to block the buses’s progress. And if the platforms of the tunnel were pre-paid areas, then passengers could rapidly flow onto buses through all of their doors. As for wheelchairs, the platforms of the tunnel could be built to the level of the bus doors (There would be no restriction on the curb height in the tunnel.) so, as long as the bus was close enough, wheelchairs could simply roll straight on, similar to what they would do for a train. [I have yet to figure out why several of the current Transitway stations are not pre-paid zones - as they are for the O-Train - or why their platforms are not already higher so that ‘kneeling’ and the ramp would only be needed off the Transitway route. Maybe there is just a mind-set that the old, ‘tried and true’ ways of transportation construction, technology, and operations must be used.]
Anyway, I am getting carried away again. The short answer is that the politically acceptable way to spend Billions on transit is to declare that a total change of technology is REQUIRED. Ottawa NEEDS to have a 100+ year old technology to be modern.
In reality, a change to rail at this stage, and for the planning time frame (up to 2031) is certainly not a requirement. A bus tunnel solution would save at least $1.5B in estimated construction costs and be far less disruptive to the transit system during construction. The statement that ‘a bus system would be at or above capacity by 2031' is not true based on my interpretation of the projected numbers. (And if a bus based system were to be at its limit, then an LRT system would not be far from its limit either.)
What about the operating savings of the rail based system? Well, there are PROJECTED savings of about $50M per year for rail over buses. So, if buses were not any more efficient than they are now, it would take only 30 years to make up the $1.5B difference.
I guess I should point out that I’m not against trains where they make sense, but I just have a problem with throwing out a mostly working system to re-build it with a different technology but not gain anything for that cost. In fact, there will be substantial loss of functionality.