Quote:
Originally Posted by Dado
Ya, that would probably make too much sense, just like using a few empty hopper cars on the mainline beside Bayview Station to take tunnel spoil for removal along the O-Train line at night rather than trucking the stuff up Bronson and/or Preston all day long...
From the Laurier end they can just truck it along the Transitway and dump it at Hurdman - hey, it's not like they haven't done it before...
|
I like the idea of using the track to remove the spoil. Based on a 6m bore, and a daily advance rate of 20m, there would be about 565m³ per day to move. That’s about 1050t, based on 1.85t/m³. I think the average hopper car carries 100t, so 11 cars should do it. Would there be space for 8 cars (the night cars would not need to be stored) between the Bayview spur and the Prince of Wales Bridge? (I’m not keen on the idea of storing 100t cars on the bridge, although it probably wouldn’t be a problem for the bridge.)
(Of course, I’d still prefer to bore one oval tunnel; which would double the amount of muck produced daily - assuming an advance rate of 13m; but the tunnel would be finished in one pass, shortening the tunnelling time by about 40%, provide an infinite number of cross-connections and access points, and excavate half of the stations at the same time.)
Perhaps the first piece of rail built should be between the O-Train head at Bayview and the Bronson Escarpment. (The Transitway buses would be re-routed along Wellington, east of the O-Train.) We will need to build it at some time and I think it would make sense to do it when the major construction of the Lebreton Flats homes is being done. That way, the new residents are not subjected to the mess of the Lebreton trench construction later. Also, it would allow the backup train and muck removal to run directly into/from the new tunnel. (In my opinion, it is shear lunacy to permit the homes to be built before the tunnel is constructed, but they didn’t ask for my views.)
If I might expand on your idea a bit: If the first tunnel is made from the Bronson side, and then the TBM turned at the Laurier pit, the muck from the second bore could just be transferred to hoppers running through the completed first tunnel back to Bayview. There would be no need to truck the muck along the Transitway and dump it at Hurdman.
Too bad we didn’t get our act together much sooner. The muck from the tunnel would have been great fill for the Lebreton Flats. In fact, if the spoil is broken rock, as I suspect it will be, it could still be used to do a lot of building right on the flats and surrounding area. The now closed Snow Dump and it’s adjacent City Yard, the Tom Brown Arena, and the City Center property could be redeveloped into a huge Civic Centre, featuring a 25,000+ seat stadium, a library, a theatre, several ice surfaces, City offices, commercial offices, conference space, concert space, etc., all run as a PPP with the current owners of the City Center. - Development money could come from the sale of the Frank Claire Stadium (since it is being replaced with a new stadium) and development of Landsdowne Park.
Ah, wouldn’t it be nice to have City ‘Planners’ and political leaders who were capable of looking at a bigger picture. Alas! Maybe we need another Greber who was given a couple of years to just develop a grand scheme for the city. I’m not saying that I agree with all of his vision of a ‘Garden City’, but at least there was an over-all plan which could be worked toward in a co-ordinated fashion. It seems as if all current ‘planning’ is done in a piece-meal fashion with no concept that each project is part of a larger system. - But I’m just ranting again.
Any suggestions as to what to do with the muck? I fear that just piling it would create a huge mound. (Maybe a ski hill?) Gatineau is in the middle of a building boom - and is rail accessible via the Prince of Wales Bridge. I wonder if it will be needing crushed rock in a few more years? Or whether the City can make a deal with one of the local aggregate extractors to set up a rock crusher on site to produce gravel? The company could then buy the gravel (revenue stream for the City) at a very good price and reduce the amount it needs to mine from open pits. Or do we need to increase the size of any of the islands in the Ottawa River - a la St. Helen in Montreal? Maybe we are planning to host the 2017 World’s Fair.