Quote:
Originally Posted by Ch.G, Ch.G
I think the new LAPD building fits this description and it's a knockout. The design in question just suffers from poor details and material choices. To me, it looks like it was produced by some new IKEA architectural subsidiary with all the pros and cons you might expect from the brand.
|
I agree, the problem is not using precast. It's that they are trying to use precast to get a streamlined contemporary look, which is what I am assuming given the style of the rendering. They used a value engineered precast system that is clunky and solves structural problems by adding muscle and not finesse. It is cheaper to design, but wastes useable space, material, and muddles your design. learning to design with smarts and not brawn, like Aqua, bulky columns, but a crisp corner where column meets floorplate.
I just can't wait to make argue these points to stubborn engineers and developers, until they understand that it might be saving money in engineering, but wasting so much in various areas as a result.
Value engineering has become a joke because so many ignore the value part. There is a value in a clear design, and it's marketing, if you want to cut corners make a pomo neo cabrini high-rise and go home to your mcMansion in Barrington.
To clarify I am not insulting you Ch.G I am just a rambling fool trying to clarify my earlier remarks. Because I do not have the talent of concise coherence.