kayosthery, do you know who's going to finish and pave Wells? It needs basic pavement, sewers, curbs, and sidewalks.... Is that Centrum's responsibility, or the city's?
EDIT: never mind. CDOT is doing the work, their website has details. I was worried that Wells would be built without sidewalks like some suburban access drive, but it will be built to full city standards for a 2-lane street, with sidewalks, lampposts, and everything. The pavement even widens at Taylor to allow for left turns onto the planned bridge. Work is planned to be done by winter.
2ND EDIT: CDOT, being generous, provided technical drawings on their website of the Wells Street Project. They show that the concrete for sidewalks won't actually be poured, but crushed limestone will be laid on the sides and compacted to allow for sidewalks to be built in the future. Maybe they don't want to actually pour sidewalks until construction on Roosevelt Collection is finished, to avoid damage to the concrete and to give some storage room for the contractors?
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Last edited by ardecila; May 12, 2008 at 8:51 PM.
|