More construction photos, 4/22/08.
Four Seasons Residence:
My guess is that over the next several weeks they will dig out around the concrete to finish the basement and first floor:
Legacy and Milago:
Altavida.
I have to say, it will look strange having those two buildings so close to each other. Really need the W to balance things out. Come on W!
Adding the stone cladding to the lower portion:
21Rio.
Wow, there's a lot of construction going on in West Campus area. A lot of it's not apparent because it's mostly 3-4 stories. This is the first time I've been through that area in a while, it's crazy how much stuff is going on.