Quote:
Originally Posted by lightrail View Post
I think the rep has been smoking some west coast products. White Rock? That would be insane - nothing like running a rapid transit system through miles and miles of rice paddies - Ladner makes more sense. Extending the Expo line to White Rock makes more sense.
Well, the rep did say such an extension would be decades a way.....and I would imagine that extension would also require a huge upping of the Canada Line capacity - i.e. platform lengths.

While we're at it, extend the Canada Line to the North Shore as well.
     
     
  #3122  
Old Posted Apr 14, 2008, 11:33 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
2012: "It's only a little crowded a peak hours....it's fine, it's fine...."

2016: "It's only a crowded the whole day.....it's fine, it's fine....."

2030: "It's only overflowing into the station entrances....it's fine, it's fine..."
     
     
  #3123  
Old Posted Apr 14, 2008, 11:52 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Omg I forgot, oh well email is good =)

Anyway I was toying around with the presentation boards and figured that it is possible to double platform Richmond Brighouse without major disruptions to the C-Line.



This image shows the second platform, relocation of elevator, and expansion of the bridge between platforms as well as the single guidway. The potential relocation of the elevator in that plan will loose room for the bridge, thus the expansion, and will take up space for the ticket gates. But then agian, there is more than enough space to fit four ticket gates anyways.



This iimage shows the potential development has enough room for another single guideway as well as an addidtional platform [if this diagram is scaled correctly, the width of the original single guideway is 19 pixels]. The future development will be close to the guideway, but not touching it. HSBC is parallel to the extent of the future development. Not sure about RBC, but by that time, the single guidway heading northbound could be very close with the other single guideway.


Canada Line Construction from No.3 & Ackroyd ~ Picture by Me ~ Photo compressed with Facebook ~ 04/13/2008


Canada Line Construction from No.3 & Ackroyd [Notice the ugly — end] ~ Picture by Me ~ Photo compressed with Facebook ~ 04/13/2008

If you notice my images [above], one of them show the ugly — end off to the side. Southbound trains continue all the way to Richmond Brighouse while Northbound trains must change tracks to its dedicated track heading Northbound. This means that there is enough room to put another single guideway without destroying the current single guideway.

Am I making any sense?

Quote:

This work (above) is licensed under a Creative Commons Licence.
     
     
  #3124  
Old Posted Apr 15, 2008, 12:15 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ that would work if the adjacent development doesn't occur, which is 90% not likely....
     
     
  #3125  
Old Posted Apr 15, 2008, 12:22 AM
Canada_Line Canada_Line is offline
Registered User
 
Join Date: Apr 2008
Posts: 13
If they doubled the single guideway and attached it back onto the former single guideway right before the station, then you wouldn't have to make another platform and still have as quick a frequency.
     
     
  #3126  
Old Posted Apr 15, 2008, 12:32 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by deasine View Post
This means that there is enough room to put another single guideway without destroying the current single guideway.

Am I making any sense?
At the junction, I'm not sure if they would be able to cantilever out that far from the existing structural box of the single guideway to widen it. I would expect that they would have to replace the guideway. The station configuration looks feasible though with an inside platform.
     
     
  #3127  
Old Posted Apr 15, 2008, 3:10 AM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
Quote:
Originally Posted by deasine View Post
Omg I forgot, oh well email is good =)

Anyway I was toying around with the presentation boards and figured that it is possible to double platform Richmond Brighouse without major disruptions to the C-Line.



This image shows the second platform, relocation of elevator, and expansion of the bridge between platforms as well as the single guidway. The potential relocation of the elevator in that plan will loose room for the bridge, thus the expansion, and will take up space for the ticket gates. But then agian, there is more than enough space to fit four ticket gates anyways.



This iimage shows the potential development has enough room for another single guideway as well as an addidtional platform [if this diagram is scaled correctly, the width of the original single guideway is 19 pixels]. The future development will be close to the guideway, but not touching it. HSBC is parallel to the extent of the future development. Not sure about RBC, but by that time, the single guidway heading northbound could be very close with the other single guideway.


Canada Line Construction from No.3 & Ackroyd ~ Picture by Me ~ Photo compressed with Facebook ~ 04/13/2008


Canada Line Construction from No.3 & Ackroyd [Notice the ugly — end] ~ Picture by Me ~ Photo compressed with Facebook ~ 04/13/2008

If you notice my images [above], one of them show the ugly — end off to the side. Southbound trains continue all the way to Richmond Brighouse while Northbound trains must change tracks to its dedicated track heading Northbound. This means that there is enough room to put another single guideway without destroying the current single guideway.

Am I making any sense?

I have to say that's impossible, because the HSBC Building will be blocking the addition of a 2nd guideway, unless you tear that building down just for the purpose of this, which is probably unlikely.
     
     
  #3128  
Old Posted Apr 15, 2008, 3:19 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,129
who says they need double track for that small section?

they could have one and deal with it and than have two afterwards

it might cause some timing issues but its doable
     
     
  #3129  
Old Posted Apr 15, 2008, 5:13 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
^I have thought of that, but then the problem is that you might have to change the guideway alltogether, which disrupts service.

Mr. X: Haha that will be Richmond's job to make sure they limit the amount of room the development can build on. They need lots of site setbacks!!!!
     
     
  #3130  
Old Posted Apr 17, 2008, 1:59 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
I have another exciting update on the Canada Line construction, a milestone [well not really].

Lansdowne Station



Canada Line Construction of Lansdowne Station from Lansdowne & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Aberdeen Station ~ Northbound Station Frame Complete


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Aberdeen Station from Cambie & No. 3 ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008

YVR


Canada Line Construction ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of YVR - Airpot from Parking Lot ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008\


Canada Line Construction of YVR - Airpot from Parking Lot ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of YVR - Airpot from Parking Lot ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of YVR - Airpot from Parking Lot ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of YVR - Airpot from Parking Lot ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction from 98 B-Line Bus ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


The following shots are taken at an awkward angle from the bus, sorry [some had to be digitally zoomed]


Canada Line Construction of Templeton Station from the 98 B-Line Bus ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Templeton Station from the 98 B-Line Bus ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Templeton Station from the 98 B-Line Bus ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Templeton Station from the 98 B-Line Bus ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008


Canada Line Construction of Templeton Station from the 98 B-Line Bus ~ Picture by Me ~ Photo compressed with Facebook ~ 04/16/2008

Quote:

This work (above) is licensed under a Creative Commons Licence.

Last edited by deasine; Apr 17, 2008 at 3:05 AM.
     
     
  #3131  
Old Posted Apr 17, 2008, 2:09 AM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
Quote:
Originally Posted by deasine View Post
I have another exciting update on the Canada Line construction, a milestone [well not really]. Uploading images...
Ooh, ooh! Is it open yet

Below budget, and ahead of schedule! Will be the story no matter when, though...
     
     
  #3132  
Old Posted Apr 17, 2008, 2:21 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by The_Henry_Man View Post
I have to say that's impossible, because the HSBC Building will be blocking the addition of a 2nd guideway, unless you tear that building down just for the purpose of this, which is probably unlikely.
Just noticed from that the Richmond presentation board completely covered the HSBC building. =(

Well haha i can't see any other way [destroying HSBC building], other than replacing the guideway...
     
     
  #3133  
Old Posted Apr 17, 2008, 2:22 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
it's alright i guess....i thought Aberdeen's roof would be more than that though. It's a far cry from the M-Line stations. But i guess simplicity works too.

     
     
  #3134  
Old Posted Apr 17, 2008, 2:23 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by mr.x2 View Post
it's alright i guess....i thought Aberdeen's roof would be more than that though. It's a far cry from the M-Line stations. But i guess simplicity works too.
well part of the station [or the guideway] will be covered by Aberdeen Centre right?
     
     
  #3135  
Old Posted Apr 17, 2008, 2:33 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by deasine View Post
well part of the station [or the guideway] will be covered by Aberdeen Centre right?
Nope, at least according to the most recent plans.


     
     
  #3136  
Old Posted Apr 17, 2008, 2:56 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
oh well... let's all look at the overhang instead of the station =)
     
     
  #3137  
Old Posted Apr 17, 2008, 3:05 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Delete
     
     
  #3138  
Old Posted Apr 17, 2008, 7:12 AM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,487
Quote:
Originally Posted by mr.x2 View Post
it's alright i guess....i thought Aberdeen's roof would be more than that though. It's a far cry from the M-Line stations. But i guess simplicity works too.

At least it should age well.
     
     
  #3139  
Old Posted Apr 17, 2008, 8:33 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,395
thanks for the pics
     
     
  #3140  
Old Posted Apr 17, 2008, 1:44 PM
dreambrother808 dreambrother808 is offline
Registered User
 
Join Date: Jan 2008
Location: Vancouver
Posts: 4,429
i think aberdeen's roof looks great, quite beautiful
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:15 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.