Quote:
Originally Posted by Jacques
I was also told today that the seismic upgrade are a different part of the Gastown development and as for the rumour of the edifice having a additional floor added, I was told it was scrapped unless someone can be verify this info
NOTE: I was chatting with the owner of the Save on meat and he told me that there is a HUGE tower soon to be sprucing up at Carrall and Hasting can anyone check this information and if its a go any plans in the works to show?
thanks
cheer
|
The extra floor was part of an old DP, but the idea was scrapped as the government wants to have as much natural light on Gastown Square as possible, and wants to keep the 2/3 storey limit to prevent shadowing. Look how busy Chill Winston's is on a sunny day...
The building at Carrall and Hastings is an old rumour that has been mentioned on here a few times. I'd love to see it happen. Keep the heart of Gastown lowrise (including the square), but increase height elsewhere would be ok with me.
I notice the DP sign on Carrall at the building currently occupied by Boneta has been taken down (it is still up on Cordova). Is this because development work is about to commence or that the development permit has been scrapped?