Quote:
Originally Posted by LikeHamilton
If you read VIA Rails own study of service to Hamilton, the location at Liuna was at the bottom of their list and undesirable. At the top of there list was the GO Centre if the tunnel and the connection to the main line at Ottawa Street (Gage line) was addressed.
I believe the feds should invest in making the TH & B tunnel wider and taller, correct problems with the Gage line and connect the Gage line to the CN main line so the trains can go east and west from the Gage line.
|
The city, the province and the feds really have to talk to each other on these things. Even without VIA, the Gage line will have to be fixed. Why? Because in all likelihood,
an LRT line will be crossing it! A grade separation will probably be required with whichever street carries the line, Main or King. I cant think of any locations in Toronto where a streetcar crosses a rail line at grade. Separating both Main and King would be better, but I wouldn't count on it.
Property will have to be acquired on Main and/or King adjacent to the rail line for reconstruction. If the railway were smart, they would use this opportunity to acquire the necessary land for a proper connection to the CN mainline. If they were even smarter, they would convince the government to do it for them. Once that is in place, there's a an even stronger argument for upgrading the Hunter Street tunnel.
So indirectly, LRT might lead to a VIA station in the core.