HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #361  
Old Posted Mar 28, 2008, 11:24 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,692
Davis commissioners back light rail - It's considered preferred alternative for transport

http://www.deseretnews.com/article/1,5143,695265439,00.html

The locally preferred alternative, whose report can be found at www.udot.utah.gov/southdavistransit, includes light rail — possibly in the form of a streetcar — to run from the Intermodal Hub, located at 200 South and 600 West in Salt Lake City, north on 400 West, continuing north on Beck Street and U.S. Highway 89 to 2600 South in Woods Cross.

From there, the rail would extend along 200 West to 400 North, where it would head east to Main Street in Centerville and run to somewhere near Parrish Lane.


.
Reply With Quote
     
     
  #362  
Old Posted Mar 28, 2008, 11:52 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,692
Bus rapid transit now being projected for 5600 West

The Salt Lake Tribune
Article Last Updated: 03/28/2008 01:31:36 AM MDT


Bus rapid transit on 5600 West now is part of the Wasatch Front Regional Council's transportation plan.
On Thursday, the council approved adding mass transit along 5600 West from Salt Lake City International Airport on the north to 11800 South on the south.
The first phase of the project would be to develop dedicated bus lanes from 2700 South to 6200 South by 2015.
In the next 10 years, those lanes would be extended to 11800 South through South Jordan's Daybreak community. On the northern end, the lanes would go up to Interstate 80 and then swing east to the airport.
Between 2026 and 2030, the bus-rapid-transit corridor would be replaced by a rail system.
The project now shifts to the Utah Transit Authority, which must conduct studies to determine where any street widening would need to occur and other issues facing a transit system on 5600 West.
- María Villaseñor
Reply With Quote
     
     
  #363  
Old Posted Mar 30, 2008, 7:34 PM
ski_steve ski_steve is offline
Registered User
 
Join Date: Oct 2007
Location: Chicago
Posts: 467
West Jordan eager for TRAX

By Amy Choate-Nielsen
Deseret Morning News

WEST JORDAN — Watching the neighbors move in across the street from City Hall has never been as exciting to West Jordan's city officials as it is right now....

http://deseretnews.com/dn/view/0,5143,695265884,00.html

Reply With Quote
     
     
  #364  
Old Posted Mar 30, 2008, 9:06 PM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
Quote:
Originally Posted by stevena07 View Post
West Jordan eager for TRAX

By Amy Choate-Nielsen
Deseret Morning News

WEST JORDAN — Watching the neighbors move in across the street from City Hall has never been as exciting to West Jordan's city officials as it is right now....

http://deseretnews.com/dn/view/0,5143,695265884,00.html

With the price of gas continuing to climb there will be Huge interest in this area around the Mid-Jordan trax line. Mixed use TOD is how cities and surrounding suburbs are going to develop in the next 10-20 years.
Reply With Quote
     
     
  #365  
Old Posted Mar 31, 2008, 3:06 PM
RC14's Avatar
RC14 RC14 is offline
Registered User
 
Join Date: May 2007
Location: Salt Lake City, Utah
Posts: 1,146
I predict the West Jordan line will nearly double TRAX ridership.

Also dose anyone know when the 3500s. BRT line opens up, and will it have it's own lane or will it travel in mixed traffic at that point?
Reply With Quote
     
     
  #366  
Old Posted Mar 31, 2008, 4:41 PM
Makid Makid is offline
Registered User
 
Join Date: Jun 2006
Posts: 2,107
Last I read was that BRT phase one opens this winter. It will be shared lane with traffic. Phase 2 will start in January and it will be a dedicated lane.
Reply With Quote
     
     
  #367  
Old Posted Mar 31, 2008, 4:53 PM
urbanboy urbanboy is offline
BANNED
 
Join Date: Feb 2007
Location: Downtown Salt Lake City
Posts: 2,120
Last I read is that it will have a dedicated lane, and will open this Summer.
Reply With Quote
     
     
  #368  
Old Posted Mar 31, 2008, 5:31 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,692
Dedicated lanes, with the bus driver also having the ability to control the stop lights totally kicks booty!! It works fantastic in L.A. Will this BRT give their drivers that ability?
Reply With Quote
     
     
  #369  
Old Posted Mar 31, 2008, 6:01 PM
urbanboy urbanboy is offline
BANNED
 
Join Date: Feb 2007
Location: Downtown Salt Lake City
Posts: 2,120

Yes, I remember hearing that as well.
Reply With Quote
     
     
  #370  
Old Posted Apr 2, 2008, 2:05 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,692
Wait for FrontRunner nearly at an end

http://davisclipper.com/default.asp?sour...=&pform=&sc=1005&hn=clippertoday&he=.com


FRONTRUNNER trains should be rolling through Davis by April 26.

.
Reply With Quote
     
     
  #371  
Old Posted Apr 2, 2008, 4:43 PM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
My wife and I are planning on riding the frontrunner once it opens at the end of this month. I might do a video on it. LOL
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #372  
Old Posted Apr 2, 2008, 10:26 PM
i-215's Avatar
i-215 i-215 is offline
Exit 298
 
Join Date: Sep 2003
Location: Inland Empire (CA)
Posts: 3,492
Quote:
Originally Posted by urbanboy View Post
Last I read is that it will have a dedicated lane, and will open this Summer.
Again, I ask the question: WHERE? There's no room for a dedicated lane - unless they delete one lane in each direction, in which case I (and half of West Valley) will go postal.

__________________
I've stopped caring. Good luck, America
Reply With Quote
     
     
  #373  
Old Posted Apr 3, 2008, 2:41 PM
DENrising's Avatar
DENrising DENrising is offline
New Coloradan
 
Join Date: Mar 2008
Location: Denver
Posts: 167
Quote:
Originally Posted by delts145 View Post
Wait for FrontRunner nearly at an end

http://davisclipper.com/default.asp?sour...=&pform=&sc=1005&hn=clippertoday&he=.com


FRONTRUNNER trains should be rolling through Davis by April 26.

.
Preliminary schedule for the Frontrunner.

http://cid-ad7dfd305c57d287.skydrive.live.com/self.aspx/Public/Frontrunnerschedule.pdf
Reply With Quote
     
     
  #374  
Old Posted Apr 3, 2008, 3:30 PM
ski_steve ski_steve is offline
Registered User
 
Join Date: Oct 2007
Location: Chicago
Posts: 467
Becker makes big push to speed up streetcar project

By Brandon Loomis
The Salt Lake Tribune

The groundwork for returning passenger rail to Sugar House is getting under way this spring.

http://www.sltrib.com/ci_8792467?source=rss


Im so excited! yay
Reply With Quote
     
     
  #375  
Old Posted Apr 3, 2008, 3:47 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,692
^^^
Excellent news Steve, This is one of my favortite probablities! I get so excited about the possibility of soon being able to take a streetcar into Sugarhouse. Yaaaaay!
Reply With Quote
     
     
  #376  
Old Posted Apr 3, 2008, 3:50 PM
StevenF's Avatar
StevenF StevenF is offline
The Drifter
 
Join Date: Oct 2006
Location: Omaha, NE
Posts: 1,172
Says 2300 riders but with new development at Market Station and at Sugar House by the time this trolley is finished it could me more like 3000+. At the same time we all know how they predicted ridership on Trax and we now know those predictions where way short.

Mayor Becker seems to be doing some really good things for SLC now that he is in office and I like the projects that he has been pushing. Unlike a mayor to the south that is only looking at developments and not worrying about how people will get to those developments. Mayor Becker seems to know to put in the transit, than the developments and people will come.
Reply With Quote
     
     
  #377  
Old Posted Apr 3, 2008, 3:54 PM
Makid Makid is offline
Registered User
 
Join Date: Jun 2006
Posts: 2,107
^^^I do agree with this.

I love the amount of transit that has been voted on, worked on and will be coming in the next few years.

It will be great to see what the system looks like when the current lines are up and running and what new projects are being built/wanted by the public.
Reply With Quote
     
     
  #378  
Old Posted Apr 3, 2008, 5:08 PM
DENrising's Avatar
DENrising DENrising is offline
New Coloradan
 
Join Date: Mar 2008
Location: Denver
Posts: 167
Quote:
Originally Posted by StevenF View Post
Says 2300 riders but with new development at Market Station and at Sugar House by the time this trolley is finished it could me more like 3000+. At the same time we all know how they predicted ridership on Trax and we now know those predictions where way short.

Mayor Becker seems to be doing some really good things for SLC now that he is in office and I like the projects that he has been pushing. Unlike a mayor to the south that is only looking at developments and not worrying about how people will get to those developments. Mayor Becker seems to know to put in the transit, than the developments and people will come.
Becker is a Planning Instructor at the U, he knows that TOD will attract new developments, in terms of Residential, Retail, etc., that hopefully will lead to 'walkability' and get people out of their polluting cars. I support the S H Trolley, just wish it didn't have to go down the old abandoned rail ROW, I don't think it's going to be a trip to brag about the scenery, much like the Sandy Line from 13th South to Murray, yucko.
Reply With Quote
     
     
  #379  
Old Posted Apr 6, 2008, 3:06 PM
jedikermit's Avatar
jedikermit jedikermit is offline
Registered User
 
Join Date: Aug 2006
Location: Salt Lake City, UT
Posts: 2,259
As excited as I am for Front Runner, TRAX to West Jordan, and the Sugarhouse Trolley...

Anyone know what the status of the Airport TRAX line is? I haven't heard anything about that in some time. You would think that would take priority over some of these other transit dreams...
__________________
Loving Salt Lake City. Despite everything, and because of everything.
Reply With Quote
     
     
  #380  
Old Posted Apr 6, 2008, 4:00 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,692
As far as I know Jedi the airport TRAX timeline hasn't deviated any. This Sugarhouse line is simply something that is now being pushed as a project for which the Mayor wants to establish definative funding and construction goals. It isn't going to take any kind of priority over those lines already scheduled.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 2:08 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.