Quote:
Originally Posted by San Marino Guy
Can somebody tell me what building this is listed under construction on the diagrams? South Village - Lofts @ 9th & Flower. I don't think it's 717 Ninth or Concerto because there listed under their own descriptions on the diagram. I'm really confused. 
|
I think I see what you are asking. You're looking at a diagram here on SSP with the building name: South Village - Lofts @ 9th & Flower located:
http://skyscraperpage.com/diagrams/?b21139
This diagram is of 717 Ninth, which is listed on the first page of this thread as 717 Flower (colemonkee- I remember somthing about the name going back and forth(?), but Meruelo's website has 717 9th) . The diagram was created before the updated rendering was released. I also see now we have the official height, which is missing on the diagram.
While looking at this diagram, I noticed LA is missing a few diagrams of buildings that are currently under construction.
Missing (buildings over 15 floors):
The Century
Concerto Tower 1
Concerto Tower 2 (proposed)
Evo
The Carlyle
Solair Wilshire
NoHo Tower
Also, The Emhurst and Wilshire Center are listed as "under construction" in the LA Metro thread. I haven't seen any movement from site prep, so they may have stalled.
If anyone has time to tackle any of these diagrams it would be much appreciated. Patrick has been "the man" lately pumping out most of the LA diagrams. Thanks Patrick!
And the proposed "The Grand" doesn't have a diagram. That should be a fun one to diagram.