Quote:
|
1. Why are none of the options showing some future LRT link with the PoW bridge? It would simplify thing so much if Gatineau residents could transfer from the Rapidbus line to the LRT going to Ottawa and it might just use the same track going into the tunnel.
|
I don't think Ottawans should have to pay for laying track across the POW bridge, nor the rail cars to provide service to Quebec residents. As it was correctly pointed out tonight that there is a need and it would be nice to get STO buses off of Ottawa streets, but I doubt that this will happen unless Gatineau wants to pay their share for rail connectivity and this may need some federal intervention and financial support.
I was surprised by the number of people commenting that the network was not extensive enough within the Greenbelt providing better access to the hospitals and other employment areas.
Most in our group supported #4 but one suggested that we didn't need a tunnel at all and we could get away with a transit loop between downtown Hull and Ottawa with rapid transit ending at both sides of the loop on either side of downtown.
The consultant in our group also admitted that when considering the extra transfer, the net time saving by switching to rail with a tunnel will be 2 to 3 minutes, not the 15 minutes (round trip considered) that Larry O'Brien has been quoted in the media. Are there other ways to speed up service?
Quote:
|
It's frustrating to see some people going to these things to complain about their bus route. Or saying how construction is going to be such a disruption.
|
This is legitimate concern that needs to be carefully considered when planning for implementation. We just have to make sure that this does not become a deal breaker.
I also spoke with Diane Holmes and when I commented on the upcoming mine field of setting priorities, she agreed with me. Her main concern has been the lack of consistent federal or provincial transit funding. I agreed with her on that.
Alex Cullen still seems to be prioritizing Transitway improvements before the shovel goes in the ground for the tunnel which has to be a bit of a concern if funding is limited.