HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Jan 30, 2008, 11:19 PM
Canadian Mind's Avatar
Canadian Mind Canadian Mind is offline
Registered User
 
Join Date: Aug 2006
Posts: 3,907
So it is true that it isn't used as much elsewhere?
__________________
"you're eating chicken periods" - Vid
"I love eggs, especially the ones with runny yolks" - Me
"EWWWWWWWWWWWWWWWWWWWWWW, you're disgusting!" - Vid
     
     
  #22  
Old Posted Jan 30, 2008, 11:20 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,695
Regarding our prodigious use of concrete, it works.

Pre-stressed concrete is almost an entirely different material than the conventional poured-in-place variety. Wikipedia article.

We also don't have to deal with very much freeze-thaw in BC that can weaken concrete over time. Also, it is cheaper. More bridges for the same amount of money.

It isn't just us either. Pre-stressed concrete box girder bridges are being built all over the world.

Lastly, pre-stressed concrete bridges, especially cable-stayed bridges, are way lighter than their steel equivalents. The reduced pier footprint and foundation requirements translate into shorter construction schedules and I also would imagine it would broaden the number of viable crossing points up for consideration.

Engineers, am I on the right track?
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #23  
Old Posted Feb 3, 2008, 9:50 PM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
Some more from Flickr:

Looking Northward to Pitt Meadows/Maple Ridge:



Looking southward toward Surrey/Langley:

     
     
  #24  
Old Posted Feb 3, 2008, 10:48 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
wow the aerial shot looks beautiful
     
     
  #25  
Old Posted Feb 3, 2008, 10:59 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
is that a cranberry farm beside the bridge?

looks beautiful anyhow.
     
     
  #26  
Old Posted Feb 4, 2008, 5:40 AM
excel excel is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 3,484
This is a sweet project.
     
     
  #27  
Old Posted Feb 4, 2008, 8:21 AM
worldwide's Avatar
worldwide worldwide is offline
Registered User
 
Join Date: Oct 2007
Location: Vancouver - Ktown
Posts: 704
one lower mainland roads project i truly believe we need.
__________________
Hieroglyphics yeah, to the kick and the snare like that, there, yeah, we keep it raw rare
     
     
  #28  
Old Posted Feb 4, 2008, 6:47 PM
vanlaw vanlaw is offline
Registered User
 
Join Date: Oct 2007
Posts: 667
Quote:
Originally Posted by mr.x2 View Post
is that a cranberry farm beside the bridge?

looks beautiful anyhow.
No, it's a sewage treatment facility.

Up until about 9 years ago, the big lime plant directly to the east of the bridge was a big vacant piece of land that was termed "the lime pit" - used to party there a lot, lots of 4x4ing etc. Was actually a great place - unless the wind was blowing wrong way.
     
     
  #29  
Old Posted Feb 28, 2008, 10:28 PM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
A couple more...




     
     
  #30  
Old Posted Apr 6, 2008, 7:07 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
The bridge will be free of toll for the first month so that Translink can test out the tolling systems.



Video Link




Golden Ears bridge: on budget, on time
Updated: Sat Apr. 05 2008 19:04:02

ctvbc.ca

Construction of the $800-million Golden Ears Bridge, which will span one kilometre and connect Langley and Pitt Meadows, reached the halfway point this week.

Translink Chair Dale Parker announced Saturday the project is on schedule and on budget, which means by the summer of 2009 there will be six lanes of cars and trucks, two lanes of bicycles and two lanes of pedestrians moving across the Fraser River.

It's a massive project that will also include 14 kilometres of new roadway, much of it elevated to cross highways and rail lines and improve transportation in the surrounding communities. Another 11.5 kilometres of local road reconstruction will be done.

The province says this is the first major improvement to Metro Vancouver's transportation system in 20 years - and more megaprojects are in the works, as the province forecasts that 1 million more people will move into the region in the next 25 years.

B.C. Transportation Minister Kevin Falcon turned out for Saturday's media preview of the site.

"I'm here as a tourist to take a look and to see how this project will complement the provincial vision," Falcon said.

Some highlights of the Golden Ears project:

- There will be 16 bridges, ramps and viaducts including the main river bridge.
- A total of 4,656 metres of structures will be built once the bridge is complete.
- The bridge is expected to spur the eventual growth of 700 new businesses in Maple Ridge, Pitt Meadows, Surrey and Langley.
- The Golden Ears project is an adaptation of the Alex Fraser cable-stayed bridge, which sits further west on the Fraser River and connects Richmond and New Westminster with the municipality of Delta.

The Golden Ears megaproject, when completed, will knock at least 30 minutes off the time it currently takes to get from Langley to Pitt Meadows.

To recover costs, a toll of approximately $3 will be charged to drivers.
     
     
  #31  
Old Posted Apr 6, 2008, 8:30 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Go Falcon Go!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #32  
Old Posted Apr 6, 2008, 8:32 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by hollywoodnorth View Post
Go Falcon Go!
Too much credit....
     
     
  #33  
Old Posted Apr 6, 2008, 12:07 PM
clooless clooless is offline
Registered Luser
 
Join Date: Nov 2006
Location: Calgary, Alberta
Posts: 424
What confuses me is that after poring over the maps the only "direct connection" between the TCH and the bridge that I can see is via 200th/201st Street, or via the 176th Street exit to the new mainline route. There are no ramps either westbound or eastbound that directly connect the TCH to the mainline route to the bridge.
     
     
  #34  
Old Posted Apr 6, 2008, 4:54 PM
agrant's Avatar
agrant agrant is offline
Cheers!
 
Join Date: Sep 2006
Location: Vancouver, BC
Posts: 1,869
Not quite sure what you mean with your last sentence. Isn't the 200th street overpass the main connection between the bridge and TCH? There are westbound and eastbound ramps there. You probably mean something else, but I can't figure it out.
     
     
  #35  
Old Posted Apr 6, 2008, 6:04 PM
natelox's Avatar
natelox natelox is offline
Registered User
 
Join Date: Aug 2005
Location: Toronto
Posts: 343
Quote:
Originally Posted by SFUVancouver View Post
Regarding our prodigious use of concrete, it works.

Pre-stressed concrete is almost an entirely different material than the conventional poured-in-place variety. Wikipedia article.

We also don't have to deal with very much freeze-thaw in BC that can weaken concrete over time. Also, it is cheaper. More bridges for the same amount of money.

It isn't just us either. Pre-stressed concrete box girder bridges are being built all over the world.

Lastly, pre-stressed concrete bridges, especially cable-stayed bridges, are way lighter than their steel equivalents. The reduced pier footprint and foundation requirements translate into shorter construction schedules and I also would imagine it would broaden the number of viable crossing points up for consideration.?
Not all of this is true. Firstly, I would not say that pre-stressed concrete is an entirely different material. It is some-what different in its construction and because of that, its has the ability to span greater distances, but it is still subject to all the usual advantages (fire-resistant, durable) and disadvantages (heavy, porous) that any other form of concrete is subject to.

Secondly, while I cannot say in confidence that Vancouver is highly susceptible to freeze-thaw conditions, I can say that the theory behind it makes sense that Vancouver would in fact, be susceptible to it. Freeze-thaw description. Vancouver has very wet winters, and whenever the temperature drops below freezing we have the potential for freeze-thaw problems. Now, Vancouver doesn't drop below freezing that often, but the potential definitely exists and should be considered in design.

Pre-stressed concrete is not lighter than steel. I cannot speak to the design requirement for a bridge, but if we look at a normal building with a live load requirement of 40lbs/sqft, concrete weighs 75lbs/sqft. The amount of extra concrete and rebar you need to support the weight of the concrete itself makes it inefficient. The ratio of dead load to live load is 1.875. If you look at wood, or steel, it can be as low as 0.25 (For every one pound of steel or wood, it can support four pounds of load) Steel is much faster to build too.

So why do we use concrete? I think it is because it is a local product. Steel is not manufactured anywhere near BC. We can get concrete from Granville Island (or Richmond, in the case of the Golden Ears Bridge). The pieces are floated down the Fraser River on a barge which allows huge sections to be moved easily without much energy or disruption to local roads. We have the infrastructure, the knowledge, the trades and the material. It is representative of the regional vernacular. If you want steel just for the sake of wanting steel, well you may be looking at it from the wrong perspective.
     
     
  #36  
Old Posted Apr 6, 2008, 6:11 PM
clooless clooless is offline
Registered Luser
 
Join Date: Nov 2006
Location: Calgary, Alberta
Posts: 424
Quote:
Originally Posted by agrant View Post
Not quite sure what you mean with your last sentence. Isn't the 200th street overpass the main connection between the bridge and TCH? There are westbound and eastbound ramps there. You probably mean something else, but I can't figure it out.
Yes, that's what I mean. I don't understand why all the bridge traffic from the TCH will transit via 200th Street when the mainline highway (the road from 176th Street direct to the bridge) being built for the new bridge passes directly under the TCH, yet no ramps will connect the mainline route to the TCH. That is going to throw an enormous amount of traffic onto 200th/201st Street.
     
     
  #37  
Old Posted Apr 6, 2008, 6:39 PM
bugsy bugsy is offline
BANNED
 
Join Date: Jan 2006
Posts: 319
So typical in Metro Vancouver -- they spend money to build a bridge that will end up clogging streets. Why do they not directly connect Hwy 1 to the bridge without any lights -- don't they want to move traffic? Its pretty stupid if they aren't doing that. Stuipid but typical. Just like the overpass on Russ Baker Way in Richmond -- they came up with this whole system of overpasses basically to make traffic worse and unconnected. No forsight. Weird.
     
     
  #38  
Old Posted Apr 6, 2008, 6:57 PM
agrant's Avatar
agrant agrant is offline
Cheers!
 
Join Date: Sep 2006
Location: Vancouver, BC
Posts: 1,869
Quote:
Originally Posted by clooless View Post
Yes, that's what I mean. I don't understand why all the bridge traffic from the TCH will transit via 200th Street when the mainline highway (the road from 176th Street direct to the bridge) being built for the new bridge passes directly under the TCH, yet no ramps will connect the mainline route to the TCH. That is going to throw an enormous amount of traffic onto 200th/201st Street.
Wouldn't you only need one option to get to the bridge from the highway? It's the most direct route from the highway, and remember that 200th street will be 6 lanes - same as the bridge.
     
     
  #39  
Old Posted Apr 6, 2008, 8:02 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,073
they have been making big changes in langley in prep for the bridge 200th and that other road have really changed -i don't know the cross street but if yopu are familiar with langley its the one with wendys and mcdonalds etc on it goes out to ft langley... east/west road...

I don't think it will be that bad - i think they planned it as a local route to connect surrey/langley and maple ridge only
__________________
belowitall
     
     
  #40  
Old Posted Apr 6, 2008, 8:10 PM
clooless clooless is offline
Registered Luser
 
Join Date: Nov 2006
Location: Calgary, Alberta
Posts: 424
Quote:
Originally Posted by agrant View Post
Wouldn't you only need one option to get to the bridge from the highway? It's the most direct route from the highway, and remember that 200th street will be 6 lanes - same as the bridge.
Yes, but they're simply pushing bridge traffic from the TCH onto an arterial road while building a new highway just to the west that will not connect to the TCH. I don't get it.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.