RUMOR: Fifield sold lot to an Australian company - 60 story to rise there?
I heard a juicy rumor that Fifield sold the lot at 375-399 Fremont to an Australian developer who plans on putting a 60-story tower there! Can anyone confirm?
I heard a juicy rumor that Fifield sold the lot at 375-399 Fremont to an Australian developer who plans on putting a 60-story tower there! Can anyone confirm?
I've heard nothing of this myself, but what a Christmas present that would be. Was the name of the developer by chance included in that rumor?
__________________
Reject the lesser evil and fight for the greater good like our lives depend on it, because they do!
-- Dr. Jill Stein, 2016 Green Party Presidential Candidate
I've heard nothing of this myself, but what a Christmas present that would be. Was the name of the developer by chance included in that rumor?
I seriously doubt a 60 story tower would go there. The city spent almost 15 years approving the Rincon Hill Plan, I dont see them modifying it anytime soon. Especially when they scaled all the buildings so that their would be a "peak" at One Rincon Hill.
Meanwhile, they haven't started on the Apostleship of the Seas building yet. They are still clearing out all the rubble from the other two. In fact, today more help is onsite:
__________________
My other car is a Dakota Creek Advanced Multihull Design.
I seriously doubt a 60 story tower would go there. The city spent almost 15 years approving the Rincon Hill Plan, I dont see them modifying it anytime soon. Especially when they scaled all the buildings so that their would be a "peak" at One Rincon Hill.
You are probably right but there'd still be a peak at ORH which is at the top of the hill--quite a bit higher so it would "peak" if the buildings were the same height (OH NO--I broached the subject of the ORH height again--just shoot me!).
Yes, with the ground elevation differences between this and the ORH site, a "60 story" building might just be able to squeeze in under the "peak."
Wouldn't they have to go through another arduous, time consuming approval process, community debate and environmental impact report to make this happen? This would add at least 2-3 years onto the completion timeline. What about the holding cost of keeping it a vacant plot of land for that long? Then again, given the terrible housing market, now may be the optimal time to go through the motions and defer building.
^^^ That one is hanging on for dear life, heh. I cant really tell, but at least it looks like they've gotten rid of most of the debris from the neighboring sites. Good update.
__________________
Reject the lesser evil and fight for the greater good like our lives depend on it, because they do!
-- Dr. Jill Stein, 2016 Green Party Presidential Candidate
^^^^^^^^^From my apartment, I have a good vantage point in what is going on (unfortunately, I don't have the pics).
Anyway, they are progressing slowly, as they are de-constructing the metal piece-by-piece. They have removed the metal from the top floor and should complete the cement removal shortly (which will make the demolishing more visible). If they continue at this pace (or slower, with our upcoming rainstorms), it will likely take several weeks to completely demolish.
I like that view of the bridge as well. I was just thinking on Monday how strange it is that I've never stopped to take that shot and now you've saved me the trouble. Thanks!
__________________
My other car is a Dakota Creek Advanced Multihull Design.
Hey Dave, with the weather improving tomorrow, I think I'll bring my camera to work. Are you going to be out shooting? I was thinking of heading over to Trinity. We could divide and conquer, or perhaps I'll run into you somewhere.
__________________
My other car is a Dakota Creek Advanced Multihull Design.