Quote:
Originally Posted by harryc
On Randolph midway between Wells and LaSalle - on the N side.
Is this site prep ?
|
I doubt it. Last I heard, this was going to become a small parking lot. Whoever is going to operate the lot does not want their customers to park underneath such an disfigured wall.
The man on the scaffold, I'm sure, is a mason who is preparing the wall for refinishing, removing the extra bits of old brick, steel, plaster/lath, and drywall. After that, there will either be 1) sandblasting then repointing or 2) repointing then painting. I'm guessing it will be the latter, since paint is cheaper than sandblasting, and also since it looks like the mason has already started the repointing (he's holding a giant caulk gun full of mortar).
I doubt that this is site prep for a new project, because if it was, the property owner wouldn't spend nearly so much money refinishing the brick wall. Compare it to the similar exposed brick walls at theWit and 155 North Wacker, where the construction teams are basically ignoring them, since they will be covered up by the new building.