HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West


Reply

 
Thread Tools Display Modes
     
     
  #921  
Old Posted Sep 19, 2007, 1:31 AM
San Frangelino's Avatar
San Frangelino San Frangelino is offline
 
Join Date: Apr 2005
Posts: 656
If anyone is curious to see whats going up at Turk and Gough.

From:http://www.cahill-sf.com/experience/deta...using+%26+Assisted+Living&project_no=730

Reply With Quote
     
     
  #922  
Old Posted Sep 19, 2007, 3:26 AM
BTinSF BTinSF is offline
 
Join Date: Jun 2006
Posts: 24,071
^^^When the wraps come off, I'm going to see more of it than I want to--it'll block a sliver of my view (but not enough to lose much sleep over).

That's my condo in the rendering on the next block (beyond the yellowish building just over the girl's head).
Reply With Quote
     
     
  #923  
Old Posted Sep 22, 2007, 4:03 AM
BTinSF BTinSF is offline
 
Join Date: Jun 2006
Posts: 24,071
350 Bush/500 Pine to start construction in spring

Quote:
Lincoln set to build after record buy
Shorenstein partnership sells downtown parcels for $60M
San Francisco Business Times - September 21, 2007
by J.K. Dineen
Story Images

Paying a record price for land in downtown San Francisco, Lincoln Property Co. has acquired office building sites at 350 Bush St. and 500 Pine St. for more than $60 million and plans to start driving piles as soon as next spring on a speculative basis.

The seller was a partnership of Shorenstein Properties, the Swig Co., and Weiler & Arnow Management Co. The three family-owned real estate corporations had assembled the sites over the course of four decades and received approvals for the projects six years ago.

The price, more than $150 per buildable square foot, reflects both the difficulty of entitling office projects in downtown and the fact that the parcels are the only two office building sites remaining in the north financial district.

Lincoln Property Executive Vice President John Herr said his company would start construction "as soon as possible" on the two buildings, a 19-story, 350,000-square-foot tower at 350 Bush St. and a five-story, 50,000-square-foot structure at 500 Pine St. The two buildings would cost about $250 million to develop, based on current construction costs.

"We believe the San Francisco office market is and will remain one of the strongest office markets in the country," said Herr. "It has proven itself with the level of investment sales over the last 18 to 24 months. The opportunity to build institutional quality, class-A office buildings in a premier location amidst strong demand and limited competition we found to be very compelling."

Lincoln, which owns 601 California St. and Waterfront Plaza, has hired Bill Cumberlich of the CAC Group to lease the new buildings. Lincoln's financial partner on the deal is ASB Capital, a union pension fund adviser based in Bethesda, Md.

The decision to sell was motivated by the fact that the three family-owned companies are each busy on other projects and were not in a position to "co-develop," particularly on speculative basis, according to Shorenstein Executive Vice President Tom Hart and Swig CEO Jeanne Myerson.

Hart said that the unloading of 350 Bush St. should not be seen as a signal that Shorenstein is not committed to San Francisco. Shorenstein and SKS Development are building a 450,000-square-foot biotech campus for FibroGen in San Francisco's Mission Bay, and the firm is negotiating with the Port of San Francisco to build a recreation complex with office space and a ferry terminal at Piers 27-31. Shorenstein started out as a San Francisco developer and has evolved into a national real estate fund sponsor.

"Everyone's first reaction is Shorenstein is pulling out of the city," said Hart. "This was an old, longtime partnership of more than 40 years, and each of us has migrated to other platforms and business plans. It was better to sell than co-develop something."

The Swig and Shorenstein companies still jointly own the Russ Building at 235 Montgomery St., which Shorenstein is moving to from 555 California St.

Myerson said it was hard to part with the sites, which took more than three years to take through an excruciating, complex approval process. But it was important to find a developer willing to break ground without a tenant in hand.

"Lincoln is going to do a very good job, and we are thrilled they are going to move ahead on a spec basis, which is what you need to do with a property like that," she said.

HellerManus designed both buildings. The Bush Street design incorporates the historic terra cotta façade, pediment and columns of the Mining Exchange building on the site and includes outdoor balconies and a 120-car garage. The 500 Pine St. project includes a rooftop garden connected to St. Mary's Park. Under the city approvals, the two buildings must be developed simultaneously as the developers agreed to expand the green space at 500 Pine St. as mitigation for shadows 350 Bush St. will cast on St. Mary's Park.

Herr said the design would not change.

"Our intention is to build the building that was approved by the Planning Commission with no material modifications," said Herr. "We think it's a high-quality design and will be well-received in the marketplace when completed."

There is one speculative highrise under construction downtown, Tishman Speyer's 555 Mission St., scheduled for completion in late 2008. Along with Beacon Capital Partners' 535 Mission St., approved last month, 350 Bush is the lone office highrise likely to be delivered in 2009. Other major proposed office projects -- 181 Fremont St., 350 Mission St., 222 Second St., 50 First St. -- are unlikely to be completed before 2010 or 2011.

While the California Street canyon still represents the spine of San Francisco's business community, the south financial district has been gaining ground in recent years. The two most well-regarded office towers constructed in the past decade -- 560 Mission St. and 101 Second St. -- are both along South of Market's dynamic and rapidly developing Mission Street, as is Millennium Partners new condo tower and Daniel Libeskind's Jewish Contemporary Museum, with its blue metal cube popping out of an old brick power station.

The new Transbay Terminal and Tower, which could add as much as 1.5 million square feet of office space by 2012, will further solidify Mission Street as the center of the city's economic engine.

But HellerManus Principal Jeffrey Heller said the traditional northern financial district still has an allure. The Bush Street building will be next to Belden Place's outside dining and offer views of nearby Union Square and Nob Hill.

"I think 350 Bush really completes that area around the BofA and that hopefully it'll be a gemstone," said Heller.

[email protected] / (415) 288-4971
Source: http://www.bizjournals.com/sanfrancisco/stories/2007/09/24/story1.html?t=printable
Reply With Quote
     
     
  #924  
Old Posted Sep 22, 2007, 8:29 PM
SFView SFView is offline
 
Join Date: Jun 2006
Posts: 1,099
(edit)

Last edited by SFView; Sep 22, 2007 at 8:58 PM. Reason: possible error
Reply With Quote
     
     
  #925  
Old Posted Sep 24, 2007, 9:45 PM
San Frangelino's Avatar
San Frangelino San Frangelino is offline
 
Join Date: Apr 2005
Posts: 656
10th and Mission Affordable housing
From:http://www.cahill-sf.com/experience/deta...egment=Affordable+Housing&project_no=758


Quote:
OVERVIEW
This project involves the construction of 136 apartments for lower income families in a 12-story post tensioned concrete frame building with precast concrete and glass exterior skin.

Ground floor space along Mission and 10th Streets is planned for retail use and a youth recreation/activity center. Secure open space, a multi-purpose room, property management offices, and parking are also planned.
Reply With Quote
     
     
  #926  
Old Posted Sep 24, 2007, 11:33 PM
BTinSF BTinSF is offline
 
Join Date: Jun 2006
Posts: 24,071
^^^Cool. To reiterate, here's some pictures of that project I took about a month ago:







Reply With Quote
     
     
  #927  
Old Posted Sep 27, 2007, 5:43 PM
dimondpark's Avatar
dimondpark dimondpark is offline
 
Join Date: Apr 2003
Posts: 8,183
Oakland

23-story office tower planned for City Center
Site is one block from high-rise Shorenstein finished in 2002
By Kelly Rayburn, STAFF WRITER
Article Last Updated: 09/26/2007 07:25:22 AM PDT

OAKLAND — Oakland City Center is moving up.
Developers' plans to build a 23-story, 500,000-square-foot office tower will be given to city staff today, as Shorenstein Properties, working with MetLife Real Estate Investments, hopes to capitalize on what it sees as another ripe development opportunity downtown.

The tower is planned for an undeveloped patch of land bounded by 11th, 12th and Jefferson streets and Martin Luther King Jr. Way.

Shorenstein, which owns City Center, has had plans for the site for years.

Executives with both companies joined Mayor Ron Dellums in saying plans to build the office tower reflected a healthy economy in the city for such projects.

"I think this is a tremendous statement of optimism on behalf of the business community with respect to the future of Oakland," Dellums said.

A more tangible impact — the building's effect on Oakland's skyline — won't go unnoticed, either.

As financial markets swayed, the company originally planned to build office space, before switching its plans to condos and then back to office space when the housing sector tanked.

"It's been in active planning of some sort for probably two-and-a-half, three years," said Shorenstein President Glenn Shannon.

The tower would rank among the city's tallest buildings.

Only six buildings in Oakland are more than 23 stories, according to Emporis, an independent research group that catalogues high-rise construction.

Those buildings are the 28-story Ordway Building on Valdez Street, the 28-story Kaiser Center on Lakeside Drive, the 27-story Lake Merritt Plaza on Harrison Street, the 24-story tower at 1111 Broadway, the 25-story Kaiser Engineering Building on Harrison Street and the

24-story Clorox Building on Broadway.

By comparison, 555 City Center Tower, oneblock east of the proposed building's site and completed by Shorenstein in 2002, is 20 stories.

Ground breaking for the new building is scheduled for April. Construction time is estimated at two years.

Shorenstein executives declined to estimate how much the project will cost, but it will be completed without city subsidies.

There's no word yet on who the tenants will be, though Shannon said preliminary conversations indicate there's high anticipation.

"We feel really good about the level of interest from the tenant community," he said.

555 City Center struggled at first to fill up after its anchor tenant, Ask.com, pulled out.

But Shorenstein executives said the building is now 100 percent leased — and that more than more than half of the companies there came from outside Oakland.

Shorenstein aims to make its newest building not only taller, but also more environmentally friendly.

Executives said the building, designed by architect Ted Korth of the firm Korth Sunseri Hagey, will be constructed to meet the standards of the Leadership in Energy and Environmental Design Green Building Rating System.

There are various levels of LEED certification, and Shorenstein development head Todd Sklar said he did not yet know what level of certification would be sought.

"We don't know yet," he said. "We know that we will be certified. We're going to be pushing it as hard as we can."

LEED certification would make the tower the largest privately owned green office building in downtown Oakland, executives said.


Contact Kelly Rayburn at [email protected] or 510-208-6435.

Here's an image of the site from the article


Here's a rendering from abetteroakland.com
Reply With Quote
     
     
  #928  
Old Posted Sep 27, 2007, 7:07 PM
peanut gallery's Avatar
peanut gallery peanut gallery is offline
 
Join Date: Apr 2007
Posts: 5,234
I'd call that an improvement.
Reply With Quote
     
     
  #929  
Old Posted Sep 27, 2007, 11:47 PM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
 
Join Date: Oct 2006
Posts: 1,689
Quote:
Originally Posted by peanut gallery View Post
I'd call that an improvement.
It could be much better, but I agree, it is better than whats there now.
Reply With Quote
     
     
  #930  
Old Posted Sep 28, 2007, 3:27 AM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
 
Join Date: Oct 2006
Posts: 1,689
There seems to be a new development (at least new to me) near the waterfront:

From Socketsite.com:

Quote:
The SocketSite Scoop On The 8 Washington Street Project

Pacific Waterfront Partners and the California State Teachers’ Retirement System have been working on plans to redevelop the area “bounded by The Embarcadero, Washington and Drumm Streets.”

And as proposed, the 8 Washington Street Project would replace a surface parking lot (which could be a problem considering it's Seawall lot 351) and the current Golden Gateway Tennis and Swim Club with 170 housing units above street level retail and restaurants; public green space; and underground parking (both public and private). And yes, it also provides for a new and improved Tennis & Swim Club as well.
They have some minor renderings available on the main page, it should be the first story coming up.
Reply With Quote
     
     
  #931  
Old Posted Sep 28, 2007, 7:35 AM
BTinSF BTinSF is offline
 
Join Date: Jun 2006
Posts: 24,071
^^^Isn't this where the hotel that Aaron Peskin scotched (didn't want anything over a couple of floors) was to be?
Reply With Quote
     
     
  #932  
Old Posted Sep 28, 2007, 9:31 PM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
 
Join Date: Oct 2006
Posts: 1,689
Quote:
Originally Posted by BTinSF View Post
^^^Isn't this where the hotel that Aaron Peskin scotched (didn't want anything over a couple of floors) was to be?
Apparently so, plus some other neighborhood activists protecting their own best interests. I believe this article on the Examiner goes back to a couple of months ago when the fight was on:

http://www.examiner.com/a-836140~Garcia__In_deep_at_the_port.html
Reply With Quote
     
     
  #933  
Old Posted Sep 28, 2007, 9:45 PM
peanut gallery's Avatar
peanut gallery peanut gallery is offline
 
Join Date: Apr 2007
Posts: 5,234
Quote:
Originally Posted by Reminiscence View Post
It could be much better, but I agree, it is better than whats there now.
Well said.
Reply With Quote
     
     
  #934  
Old Posted Sep 29, 2007, 2:20 AM
San Frangelino's Avatar
San Frangelino San Frangelino is offline
 
Join Date: Apr 2005
Posts: 656
I got this from http://sf.curbed.com/archives/2007/09/28/curbed_inside_arterra_part_ii.php#more

It looks like there's activity on the site of the Arquitectonica designed, 16 story apartment tower in Mission Bay.

Reply With Quote
     
     
  #935  
Old Posted Sep 29, 2007, 7:39 PM
mthd mthd is offline
 
Join Date: Jan 2007
Posts: 873
Quote:
Originally Posted by BTinSF View Post
^^^Isn't this where the hotel that Aaron Peskin scotched (didn't want anything over a couple of floors) was to be?
the one you're thinking of is probably the one on broadway - but there have been many attempts to develop this parcel.
Reply With Quote
     
     
  #936  
Old Posted Oct 6, 2007, 5:07 AM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
 
Join Date: Oct 2006
Posts: 1,689
I havent updated this in a while. Hopefully on the next one, I can add 45 Lansing, and maybe even One Rincon Hill's North Tower

Reply With Quote
     
     
  #937  
Old Posted Oct 6, 2007, 5:45 AM
peanut gallery's Avatar
peanut gallery peanut gallery is offline
 
Join Date: Apr 2007
Posts: 5,234
Looks good, Reminiscence! Also for next time you can remove the crane from the Intercontinental (it's long gone and the glass is complete where it used to be) and you might consider adding the 11-story City Residences building to Millennium. It will just be a relatively short tower crane for now, but they're getting close to street level.
Reply With Quote
     
     
  #938  
Old Posted Oct 6, 2007, 6:11 AM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
 
Join Date: Oct 2006
Posts: 1,689
Quote:
Originally Posted by peanut gallery View Post
Looks good, Reminiscence! Also for next time you can remove the crane from the Intercontinental (it's long gone and the glass is complete where it used to be) and you might consider adding the 11-story City Residences building to Millennium. It will just be a relatively short tower crane for now, but they're getting close to street level.
Thanks a lot!

I havent heard too much from Intercontinental, so I pretty much just went with what I last knew (which was more than a month ago). When I first created the diagram, I decided to draw only the buildings over 300 feet, so as to not get overwhelmed with amount of smaller construction, although I was meaning to make an exception for Millennium as soon as the construction reached street level.

Hopefully Turnberry and associates reveal a new, more detailed rendering (either to BT or to the general public) of 45 Lansing so I can draw its outline for the next diagram
Reply With Quote
     
     
  #939  
Old Posted Oct 7, 2007, 7:48 AM
Reminiscence's Avatar
Reminiscence Reminiscence is offline
 
Join Date: Oct 2006
Posts: 1,689
How about ...



The Millenium's 11 story ammenities building is behind the tower, its a little hard to see, but its there with it own crane (partially shown)

I couldnt wait until next month to add the other two
Reply With Quote
     
     
  #940  
Old Posted Oct 7, 2007, 8:29 AM
briankendall briankendall is offline
 
Join Date: Jun 2006
Posts: 72
Its good to see 45 Lansing on there. Is it really going through? Also, when I walked by earlier this year it said the tower was 450' with mechanical penthouse.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West
Forum Jump



Forum Jump


All times are GMT. The time now is 11:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.