Old Posted Sep 12, 2007, 6:40 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Lots of new pics by Tafryn dated Sept 11, 2007 at his blog:

http://canadalinephotos.blogspot.com/

Samples:

Yaletown Station including the TBM (note the columns on the platform):







Vancouver City Centre Station:



Near Templeton Station:



Templeton Station located at formworks:



Near Sea Island Centre Station:



Sea Island Centre Station:






Last edited by officedweller; Sep 12, 2007 at 11:45 AM.
     
     
  #1862  
Old Posted Sep 12, 2007, 7:09 AM
bils's Avatar
bils bils is offline
Registered User
 
Join Date: Mar 2006
Posts: 563
dp

fack why is SSP so slow.... everyone's double posting
     
     
  #1863  
Old Posted Sep 12, 2007, 7:10 AM
bils's Avatar
bils bils is offline
Registered User
 
Join Date: Mar 2006
Posts: 563
Quote:
Originally Posted by officedweller View Post
Lots of new pics by Tafryn dated Sept 11,

Vancouver City Centre Station:


damn if those pedestrians only knew what is (or should i say *isn't*) underneath them......
     
     
  #1864  
Old Posted Sep 12, 2007, 7:45 AM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,487
^ LOL I freaked out my buddy one time while walking over that walkway. I knew he was scared of heights so I explained to him mid span that we were not on solid ground but were on an overhang bolted over that huge pit. He was completely oblivious to it all before I told him.
     
     
  #1865  
Old Posted Sep 13, 2007, 12:10 AM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,731
Tunnel Boring Machine in Yaletown Station


Photo by Vancouverite (SSC) / SFUVancouver (SSP)


Photo by Vancouverite (SSC) / SFUVancouver (SSP)

I took these while on a walk this afternoon. I am thrilled I was able to catch a glimpse of it before it continues on to the Vancouver City Centre station.

Last edited by SFUVancouver; Sep 13, 2007 at 12:22 AM.
     
     
  #1866  
Old Posted Sep 19, 2007, 2:03 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Pics of the Yaletown Station and the Sept 8th TBM breakthrough (second bore) at Yaletown Station from the Canada Line website:



















     
     
  #1867  
Old Posted Sep 19, 2007, 2:57 AM
squeezied's Avatar
squeezied squeezied is offline
Registered User
 
Join Date: Jul 2006
Location: Vancouver, BC
Posts: 1,625
nice!
     
     
  #1868  
Old Posted Sep 19, 2007, 5:04 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,132
the hole looks kinda small untill you see a bunch of people posing in front of it
     
     
  #1869  
Old Posted Sep 19, 2007, 9:45 AM
excel excel is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 3,484
Great pictures. THanks.
     
     
  #1870  
Old Posted Sep 19, 2007, 9:28 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,132
Quote:
Originally Posted by vanman View Post
^ LOL I freaked out my buddy one time while walking over that walkway. I knew he was scared of heights so I explained to him mid span that we were not on solid ground but were on an overhang bolted over that huge pit. He was completely oblivious to it all before I told him.
oh yah i hate that too

i am amazed no one has fallen in or done something considering all the drunken idiots that go to granville street
     
     
  #1871  
Old Posted Sep 22, 2007, 2:02 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
More pics by Tafryn:

YVR Station, near Templeton Station and Waterfront Station

http://canadalinephotos.blogspot.com/

     
     
  #1872  
Old Posted Sep 24, 2007, 7:57 AM
raggedy13's Avatar
raggedy13 raggedy13 is offline
Dérive-r
 
Join Date: Mar 2006
Location: Vancouver, BC
Posts: 4,450
Pic of Waterfront Station construction I took on Saturday...



Sorry, that's all I got.
     
     
  #1873  
Old Posted Sep 24, 2007, 8:26 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,430
the boring machine has finally begun to exit the yaletown station box.
     
     
  #1874  
Old Posted Sep 24, 2007, 11:03 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
^those large blocks of concrete looks like lego =D
     
     
  #1875  
Old Posted Sep 25, 2007, 10:24 AM
excel excel is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 3,484
Wow the YVR station is really comin along. It will be a great addition for first impressions when passengers exit the terminal. Especially with the link building right behind it.
     
     
  #1876  
Old Posted Sep 25, 2007, 6:44 PM
bils's Avatar
bils bils is offline
Registered User
 
Join Date: Mar 2006
Posts: 563
does anyone know how arriving passengers will be linked to the canada line station? reason why i ask is cuz arriving passengers pick up their luggage one floor below.
     
     
  #1877  
Old Posted Sep 25, 2007, 8:05 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
There will be circulation routes to get up to the station - from the international terminal, if you exited, you'd use the same elevators / stairs as you do now (or did) for the parkade. You could also go up a floor within the terminal building.
From the domestic terminal, you'd probably go up a level in the Link Building and along the walkway from the west to the platform.
Easy connections to make.
     
     
  #1878  
Old Posted Sep 25, 2007, 8:07 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805




TOPIC IS NOW CLOSED.....PLEASE SEE NEW TOPIC.
     
     
  #1879  
Old Posted Sep 25, 2007, 8:14 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Canada Line Discussion | Completed [In Service]

Skyscraperpage Archives - previous Canada Line topic: http://forum.skyscraperpage.com/showthread.php?t=112753&page=76





Here you will find the most indepth information resource of the construction of a rapid transit rail line at Skyscraperpage.







INTRODUCTION

The Canada Line, formerly known as the Richmond-Airport-Vancouver Rapid Transit Rail Line ("RAV Line"), is a new 19-km automated rapid transit line of the Greater Vancouver Transportation Authority (TransLink) currently under construction. The line is being built and will be operated by a private sector engineering firm, SNC-Lavalin (InTransitBC), for 35 years.

The line will be the third for Vancouver, Canada and will be added to the existing rapid transit system but will not use linear induction motor technology, rather standard third rail technology. Despite the fact the line will use different technology, it is unclear whether or not it will be branded "SkyTrain" as the other two existing lines.

The Canada Line will connect downtown Vancouver to the Vancouver International Airport and Richmond City Centre in time for the 2010 Winter Olympics. The line is expected to carry 100,000 passengers per day at launch on November 29, 2009 and 142,000 passengers by 2021.

CONSTRUCTION BEGAN IN SEPTEMBER 2005 AND WILL BE COMPLETED ON NOVEMBER 29, 2009.






ROUTE

The Vancouver section of the line will run underground from Waterfront Station, with a cut-and-cover tunnel under Granville Street between Hastings and Dunsmuir and a bored tunnel under Granville and Davie Street and False Creek to the 2nd Avenue station on Cambie Street, where it will run as a cut-and-cover tunnel as far as 64th Avenue with the two directions either side-by-side or stacked on separate decks.

From there, the line will be elevated, crossing the North Arm of the Fraser River via a new cable-stayed bridge. At the proposed Bridgeport Station, the line would split, with the main line heading south on an elevated track along Number 3 Road to Richmond City Centre. A branch line will cross the Middle Arm of the Fraser River, connecting Bridgeport Station to stations on Sea Island and terminating at Vancouver International Airport. Portions of the airport branch will be at-grade in order to accommodate a future elevated taxiway for aircraft over the line. In addition, 400 metres of the final segments of the Richmond and Airport branches are single-tracked instead of double tracked to cut project costs and to appease Richmond City Council, which considered the overhead line an eyesore and had been fighting for an at-grade line.

- Elevated: ~7 kms
- At-grade: ~1.7 kms
- Bored tunnel: ~ 2.5 kms
- Cut & cover tunel: ~8 kms
TOTAL: 19 kms

Travel times southbound from downtown Vancouver will be 25 minutes to Richmond Centre and 26 minutes to the airport terminus. Northbound, trains will leave Richmond City Centre and YVR every six minutes heading to Vancouver. The departures will be coordinated to allow for a train every three minutes on the main line in Vancouver.

- Richmond frequency: ~6 minutes
- Airport frequency: ~6 minutes
- Combined Vancouver frequency: ~3 minutes

Bridges
- North Arm Fraser River Bridge
- Middle Arm Fraser River Bridge

The Canada Line tunnel boring machine, "Sweet Leilani"






FREQUENCY


INTIAL SERVICE PLAN in 2009/2010
7-day frequency (32 vehicles/16 trains required)

Early Morning
- Waterfront to Bridgeport: 6 minutes
- Bridgeport to YVR: 12 minutes
- Bridgeport to Richmond Centre: 12 minutes

Morning Peak Period
- Waterfront to Bridgeport: 3 mins 45 secs
- Bridgeport to YVR: 7 mins 30 secs
- Bridgeport to Richmond Centre: 7 mins 30 secs

Mid-Day
- Waterfront to Bridgeport: 3 mins 45 secs
- Bridgeport to YVR: 7 mins 30 secs
- Bridgeport to Richmond Centre: 7 mins 30 secs

Afternoon Peak Period
- Waterfront to Bridgeport: 3 mins 45 secs
- Bridgeport to YVR: 7 mins 30 secs
- Bridgeport to Richmond Centre: 7 mins 30 secs

Evening
- Waterfront to Bridgeport: 6 minutes
- Bridgeport to YVR: 12 minutes
- Bridgeport to Richmond Centre: 12 minutes

Late Night
- Waterfront to Bridgeport: 10 minutes
- Bridgeport to YVR: 20 minutes
- Bridgeport to Richmond Centre: 20 minutes

SERVICE PLAN (will kick in when line gets busier)
7-day frequency (36 vehicles/18 trains required)

Early Morning
- Waterfront to Bridgeport: 6 minutes
- Bridgeport to YVR: 12 minutes
- Bridgeport to Richmond Centre: 12 minutes

Morning Peak Period
- Waterfront to Bridgeport: 3 minutes 10 secs
- Bridgeport to YVR: 6 minutes 20 secs
- Bridgeport to Richmond Centre: 6 minutes 20 secs

Mid-Day
- Waterfront to Bridgeport: 3 minutes 10 secs
- Bridgeport to YVR: 6 minutes 20 secs
- Bridgeport to Richmond Centre: 6 minutes 20 secs

Afternoon Peak Period
- Waterfront to Bridgeport: 3 minutes 10 secs
- Bridgeport to YVR: 6 minutes 20 secs
- Bridgeport to Richmond Centre: 6 minutes 20 secs

Late Night
- Waterfront to Bridgeport: 10 minutes
- Bridgeport to YVR: 20 minutes
- Bridgeport to Richmond Centre: 20 minutes





STATIONS

Stations are proposed to be built in two stages: 16 stations will be built for the line's projected opening prior to the 2010 Winter Olympics, with up to three additional stations being added after the line opens. Stations platforms will range from 40 and 50 metres in length. Stations that are 40 metres are expandable to 50 metres. The proposed stations are listed below.

Vancouver
- Waterfront (connection to Expo and Millennium Lines, West Coast Express and SeaBus) - 50 metres
- Vancouver City Centre (Granville Street at Robson Street) - 50 metres
- Yaletown-Roundhouse (Davie Street near Mainland Street) - 40 metres
- Olympic Village (Vancouver 2010 Olympic Village, SouthEast False Creek, Granville Island) - 40 metres
- Broadway-City Hall (Cambie Street at West Broadway) - 50 metres
- King Edward (Cambie Street at King Edward Avenue) - 40 metres
- Oakridge-41st Avenue (Cambie Street at West 41st Avenue, next to Oakridge Centre) - 50 metres
- Langara-49th Avenue (Cambie Street at West 49th Avenue) - 40 metres
- Marine Drive (Cambie Street at Southwest Marine Drive) - 40 metres

Richmond
- Bridgeport (north of Bridgeport Road in Richmond; major transit exchange for suburban buses; new 1,000 car park and ride; link to Airport branch) - 40 metres
- Aberdeen (No. 3 Road at Cambie Road) - 40 metres
- Lansdowne (No. 3 Road at Lansdowne Road; 2-3 blocks away from the Richmond Olympic Oval speed skating venue) - 40 metres
- Richmond-Brighouse (No. 3 Road at Cook Road, adjacent to the Richmond Centre shopping mall) - 50 metres

Vancouver International Airport
- Templeton (to be located north of Grant McConachie Way, near Templeton Street) - 40 metres
- Sea Island Centre (to be located on Grant McConachie Way, near the Air Canada service centre) - 40 metres
- YVR-Airport Terminal (adjacent to the main terminal of Vancouver International Airport) - 50 metres

Future stations post-2010
- 33rd Avenue (Cambie Street at West 33rd Avenue, next to Queen Elizabeth Park in Vancouver)
- 57th Avenue (Cambie Street at West 57th Avenue in Vancouver)
- Capstan Way (No. 3 Road at Capstan Way in Vancouver)
- YVR-3 (Vancouver International Airport future terminal expansion)

Station architects
- Segment One: Downtown (Waterfront, Vancouver City Centre and Yaletown-Roundhouse Stations) – VIA Architecture & PBK;
- Segment Two: North Cambie (Olympic Village and Broadway-City Hall Stations) – Stantec;
- Segment Three: Central Cambie (King Edward, Oakridge-41st Avenue and Langara-49th Avenue Stations) – Hotson Bakker Boniface Haden;
- Segment Four: Fraser River (Marine Drive and Bridgeport Stations) – VIA Architecture & PBK;
- Segment Five: No 3 Road (Aberdeen, Lansdowne and Richmond-Brighouse Stations) – Busby Perkins Will;
- Segment Six: Sea Island (Templeton Station, Sea Island Centre Stations) – Walter Francl;
- Segment Seven: Sea Island/Terminal (YVR-Airport Station) – Kasian Architects.



TECHNOLOGY

The Canada Line will not use the proprietary Bombardier Advanced Rapid Transit linear induction technology, but rather another fully automated transit vehicle using more conventional motors than the linear induction motor used in trains on the Expo and Millennium lines. The Request For Proposals also required that the system have an ultimate capacity of 15,000 pphpd (leaving the choice of technology and platform length to the proponent) and required a maximum travel time between YVR and downtown Vancouver of 24 minutes. The new line will also be automated like the other two existing lines.





COST

CAN$2.05 BILLION
- Government of Canada: $300 million
- Government of British Columbia: $400 million
- Greater Vancouver Transportation Authority (Translink): $400 million
- Vancouver International Airport: $250 million
- InTransitBC (SNC-Lavalin; private sector): $650+ million

Last edited by mr.x; Nov 5, 2007 at 7:09 AM.
     
     
  #1880  
Old Posted Sep 25, 2007, 8:16 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
VEHICLES

The trains (ROTEM EMU) will be designed and built in South Korea by Rotem Company, a division of Hyundai Motor Group.

In total twenty fully-automated articulated trains are on order. Capacity of the new trains is estimated at 334 people, with a top speed of 80 km/h. Married pairs of gangway connected cars will be 41 metres long and 3 metres wide, both longer and wider than the ART fleet used by the current SkyTrain lines, and will have electronic ‘Next Destination’ signs on each train. These trains are currently used by Hong Kong's MTR and KCR.

Each articulated train costs $3 million; $1.5 million for each car; a total of $60-million for 20 trains/40 vehicles.

Technical Summary
- Train Configuration: 2-car trains
- Maximum speed: 80 km/h
- End to End Journey time: 25-26 mins
- Passenger capacity: 400 per train
- Seating configuration: Side-by-side transverse seats, flip-up seats at wheelchair and bicycle positions
- Bicycle accommodation: 2 per train
- Wheelchair accomodation: 4 per train
- Length: 41 metres
- Width: 3 metres
- Height: 3.6 metres
- Weight: 76 tonnes empty

Features
- Air conditioned interior
- Wide aisles between seats for smooth passenger flow
- Walkway between vehicles
- Accessible for wheelchairs, strollers and bicycles
- Passenger silent alarm
- Emergency passenger-operated intercom panels
- Electronic “Next Station” signs in each train
- Electronic “Destination” signs on the outside of each train
- Public Address System announcing next stations
- Modern vandal-resistant finishes
- Silver stainless steel exterior
- Fully automated and driverless operations






Canada Line train incomplete from the factory in South Korea



Update - September 2007

































First four trains loaded on to a ship in South Korea in November '07 - bound for Vancouver in December '07. Images courtesy of Canada Line Project Office.










Last edited by mr.x; Dec 15, 2007 at 12:54 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.