Looks like we got our wish: NO ABOVE GROUND PARKING
http://www.portlandonline.com/bds/index.cfm?a=165355&c=42264
Proposal:
The applicant seeks design advice on a potential development of a 21-story, 255’-tall mixed-use building. The first floor would include a retail space at the corner of West Burnside and SW 13th Avenue, lobbies for the condominiums and hotel facing SW 13th Avenue, a storage/loading room and an “auto lobby” entry area for underground mechanical parking. The 65 underground parking spaces, for use by the residents, would be accessed from SW 13th Avenue. Floors 2-7 would be hotel use [39 suites] and floors 8-21 [58 units] would be residential use. Proposed FAR is approximately 21:1. A 12:1 FAR is achieved through the base FAR allowed, which is 9:1, plus a 3:1 bonus that can be achievable through a variety of bonus options. The remainder, a 9:1 FAR, may be transferred from abutting designated historic landmarks.
A portion of floors 2-5 [hotel use], approximately 500-520 SF at each level, is proposed to cantilever above the West Burnside sidewalk near the corner of 13th and Burnside. If such a request were possible, additional review by PDOT and the Design Commission would be necessary.
Two on-site loading spaces are required for the proposed building size. The applicant requests an Adjustment for no on-site loading and instead proposes an off-site loading stall in the SW 13th Avenue right-of-way.