HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Closed Thread

 
Thread Tools Display Modes
     
     
  #2081  
Old Posted Jul 13, 2007, 12:04 PM
headcase's Avatar
headcase headcase is offline
Registered User
 
Join Date: Dec 2005
Location: East Village, Chicago
Posts: 455
Quote:
Originally Posted by Chi_Coruscant View Post
Is it possible this so-called 94 story high rise a project of Adrian Smith? I recalled vaguely that he is doing the supertall concept during the radio interview.
Don't think so... I believe that is the development slated for just north of RiverCity.

SSDD
__________________
He was constantly reminded of how startlingly different a place the world was when viewed from a point only three feet to the left.
     
     
  #2082  
Old Posted Jul 13, 2007, 4:35 PM
Sir Isaac Newton Sir Isaac Newton is offline
Registered User
 
Join Date: Aug 2006
Posts: 315
Quote:
Originally Posted by ardecila View Post
How could such a building have escaped us? If it's that close to construction, that means it's already cleared City Council, and we'd have heard about it in some form or another.
I'm guessing that it will take almost 2 more years for 353 North Clark to be completed....so if there is truth to this 94-story building, construction on it wouldn't be THAT close away.
     
     
  #2083  
Old Posted Jul 13, 2007, 4:47 PM
Pandemonious's Avatar
Pandemonious Pandemonious is offline
Chaos Machine
 
Join Date: Nov 2002
Location: Chicago
Posts: 1,290
^Wrong. We are talking about foundations here.. which 353 N Clark's will be completed within weeks, not years. That equipment will then supposedly go to another site right then. You can't make money on equipment that sits and does nothing.

As for the 94 story building.. no idea. It isn't the location of the other unknown towers I know about.
__________________
My Diagram: http://skyscraperpage.com/diagrams/?m2346
     
     
  #2084  
Old Posted Jul 13, 2007, 4:48 PM
BorisMolotov's Avatar
BorisMolotov BorisMolotov is offline
Registered User
 
Join Date: Nov 2006
Location: Madison, WI
Posts: 548
But CASE is just doing the foundation, and if theres only 2 caissons left at 353 N Clark, they just have to pour the mat and then they're done. So if they're immediately moving to this 94-story one, its not that far away.
     
     
  #2085  
Old Posted Jul 13, 2007, 4:48 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,941
Quote:
Originally Posted by Sir Isaac Newton View Post
I'm guessing that it will take almost 2 more years for 353 North Clark to be completed....so if there is truth to this 94-story building, construction on it wouldn't be THAT close away.
I think people are confusing the spire w this rumor. I have had 4 caisson workers at 353 tell me they are headed to the spire next ( bigger diameter caissons than at 353 ).

The caisson crew is planning on being out of 353 next Wed. They don't hang around until the project is done ;-)
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
     
     
  #2086  
Old Posted Jul 13, 2007, 5:22 PM
SamInTheLoop SamInTheLoop is offline
you know where I'll be
 
Join Date: Sep 2006
Posts: 5,575
River North Center Residential Tower

Quote:
Originally Posted by Pandemonious View Post
^Wrong. We are talking about foundations here.. which 353 N Clark's will be completed within weeks, not years. That equipment will then supposedly go to another site right then. You can't make money on equipment that sits and does nothing.

As for the 94 story building.. no idea. It isn't the location of the other unknown towers I know about.

This all seems very suspect to me - at least as far as the location of this supposed supertall. Across Kinzie would be the already-approved final piece of River North Center (roughly 500'). I'm very skeptical that the city would be in favor of granting such a massive increase in FAR for that parcel (the entire PD or portion thereof) - I'm not even sure I think that's such a great location for a supertall (there are many better ones out there - some already proposed, some yet to be). I've been arguing for some time that it would make sense to switch the tower from condo to rental and launch it asap - the market is really there for a new luxury rental tower in this S. River North location - very close to a lot of new Class A office space coming online - in addition a short walk across the River to the Loop, not too mention in the midst of all the restaurants and entertainment in the area...
__________________
It's simple, really - try not to design or build trash.
     
     
  #2087  
Old Posted Jul 13, 2007, 5:27 PM
Dale Dale is offline
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,957
Well, let's hope the 94-story tower in question is not the Spire, if you catch my drift.
     
     
  #2088  
Old Posted Jul 13, 2007, 5:55 PM
SamInTheLoop SamInTheLoop is offline
you know where I'll be
 
Join Date: Sep 2006
Posts: 5,575
^ that would only be the biggest scam of all-time....
__________________
It's simple, really - try not to design or build trash.
     
     
  #2089  
Old Posted Jul 13, 2007, 5:57 PM
Dale Dale is offline
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,957
Quote:
Originally Posted by SamInTheLoop View Post
^ that would only be the biggest scam of all-time....
That's what I'm talking about.
     
     
  #2090  
Old Posted Jul 13, 2007, 6:44 PM
Pandemonious's Avatar
Pandemonious Pandemonious is offline
Chaos Machine
 
Join Date: Nov 2002
Location: Chicago
Posts: 1,290
Is there any current info on proposal for 1130 S Wabash? Didn't see any info on page 1 for it.
__________________
My Diagram: http://skyscraperpage.com/diagrams/?m2346
     
     
  #2091  
Old Posted Jul 13, 2007, 6:51 PM
museumparktom museumparktom is offline
Chicagotom SSC
 
Join Date: Jun 2006
Location: Chicago
Posts: 438
1130 S. Wabash? Isn't that the building that the new 11th Street Deli is in? Cant imagine that there is a plan to take that down.
     
     
  #2092  
Old Posted Jul 13, 2007, 7:22 PM
Pandemonious's Avatar
Pandemonious Pandemonious is offline
Chaos Machine
 
Join Date: Nov 2002
Location: Chicago
Posts: 1,290
^Wouldn't it be the empty lot in the middle of the block west of 1130 S Michigan? There used to be (is?) a sales center there.
__________________
My Diagram: http://skyscraperpage.com/diagrams/?m2346
     
     
  #2093  
Old Posted Jul 13, 2007, 7:25 PM
VivaLFuego's Avatar
VivaLFuego VivaLFuego is offline
Registered User
 
Join Date: Feb 2005
Location: Blue Island
Posts: 6,510
That hotel project (forget the name or exact address, i think it was 20-30 stories) on the west side of Franklin, in a small lot between Madison and Washington, should be bumped to site prep, they're doing soil borings.
     
     
  #2094  
Old Posted Jul 13, 2007, 7:54 PM
Sir Isaac Newton Sir Isaac Newton is offline
Registered User
 
Join Date: Aug 2006
Posts: 315
Quote:
Originally Posted by museumparktom View Post
1130 S. Wabash? Isn't that the building that the new 11th Street Deli is in? Cant imagine that there is a plan to take that down.
I just checke online, and Eleven City Diner is at 1112 S. Wabash. If I were to guess, I would say that 1130 South Wabash is where the sales center for the Columbian is, as well as the surrounding parking spaces in that lot.
     
     
  #2095  
Old Posted Jul 13, 2007, 7:58 PM
Sir Isaac Newton Sir Isaac Newton is offline
Registered User
 
Join Date: Aug 2006
Posts: 315
Quote:
Originally Posted by Pandemonious View Post
^Wrong. We are talking about foundations here.. which 353 N Clark's will be completed within weeks, not years. That equipment will then supposedly go to another site right then. You can't make money on equipment that sits and does nothing.
Sorry - my bad! I'm still relatively new to the world of high-rise construction. It's definitely been interesting learning all different sorts of information pertaining to architecture, construction, engineering, etc. from all of the professionals and students who post on SSP, over this past year since I've joined.
     
     
  #2096  
Old Posted Jul 13, 2007, 7:59 PM
Loopy's Avatar
Loopy Loopy is offline
Registered User
 
Join Date: Nov 2005
Posts: 665
Quote:
Originally Posted by Pandemonious View Post
^Wouldn't it be the empty lot in the middle of the block west of 1130 S Michigan? There used to be (is?) a sales center there.
You mean the empty lot at approximately 1130 Wabash, of course.

Yep, there will definitely be a tower there someday. The property has a nice view corridor to the lake/park between 1130 Michigan and Columbian.

What do you know about this? I have heard that a sort of cylindrical massing model was being studied, but nothing serious.
     
     
  #2097  
Old Posted Jul 13, 2007, 8:27 PM
Pandemonious's Avatar
Pandemonious Pandemonious is offline
Chaos Machine
 
Join Date: Nov 2002
Location: Chicago
Posts: 1,290
I have seen something similar, was just wondering if there was any more information on it?
__________________
My Diagram: http://skyscraperpage.com/diagrams/?m2346
     
     
  #2098  
Old Posted Jul 13, 2007, 8:44 PM
jjk1103 jjk1103 is offline
Registered User
 
Join Date: Mar 2006
Posts: 878
...just a quick post....they are setting up the scaffolding on the front (Randolph) side of BCBS.....it looks like the construction will be visible soon...
     
     
  #2099  
Old Posted Jul 13, 2007, 9:55 PM
Chicago Shawn's Avatar
Chicago Shawn Chicago Shawn is offline
Registered User
 
Join Date: Jan 2003
Location: Chicago
Posts: 2,832
Quote:
Originally Posted by honte View Post
But you are correct, the overall soil condition is the key, as well as the way the architect designs the building to transfer the loads down. In the case of the Jewel, it's a building right next to the Metra trains, which could cause a lot of vibration and the designers might have wanted to minimize this. It's also supporting parking and a green roof, if I recall.
The Jewel store is being built with a platform that will allow for preservation of the right of way for the proposed approach of the high speed rail corridor into the future West Loop Transportation Center. A section of the parking deck, (and perhaps some of the store as well) will be built above the ROW.
     
     
  #2100  
Old Posted Jul 13, 2007, 10:09 PM
honte honte is offline
Registered
 
Join Date: Mar 2006
Location: Chicago - every nook and cranny
Posts: 4,628
Good news, or Bad?

** Deleted for copyright infringement **

- Dylan Leblanc

Last edited by Dylan Leblanc; Jul 27, 2007 at 1:13 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 2:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.