Jackson Hole is building a new Tram:
Quote:
2 x 100 passenger cabins
650 capacity per hour
Completion by December 2008
Total Cost Expected to be $25,000,000 (not including the docking stations)
Top elevation: (3185 m)
Base elevation: (1924 m)
Rise: (1262m)
time: 7.5 minutes
distance: (3,840m)

|
SFU on the other hand:
Vertical Rise: (~300m)
Distance: (~2750m)
time: ~5minutes?
You'd have a tram every 5 or 10 minutes, at peak vs. non-peak times. You could build it right from production way station and according to google earth, could probably make a straight line without infringing on many air rights of private land in the area. The view would be Awesome up the side of the mountain and it could serve as a tourist attraction as well!
The station is on top of the [7]
Anyone find an image of SFU from Production Way?