Quote:
Originally Posted by travis bickle
Give me the hole in the ground any day. We'll be stuck with that for maybe five years.
|
Five years travis?
Think longer
For those forumers stating a preference for a hole in the ground (hoping that a skyscaper
might be built in a few years), instead of a quality high density project, I have to ask; is the goal to create a vibrant city, with lively streets, dining, entertainment and more downtown housing, or is it about having a tall building??
As far as prefering a hole in the ground, I would remind those of you hoping for that senario to be careful what you wish for, because you may just have that hole for much longer than you bargained for.
Here's a couple of reminders for you..
Lot A (20 years of talking, two RFPs and now 621 is finally u/c)
500 Capitol Mall (The old Wells Fargo sat empty for 15 years)
800 block of J street (Thank CIM for changing that)
The waterfront (still waiting)
Arco Park (Big unfinished hole)
and plenty of other examples
If CIM and Cal Pers determine that a project can't pencil out, I will guarantee you that that the lot will remain unbuilt for at least 15 years and then when a proposal finally does come forward you will see a 25 to 30 story office building proposed that shuts down at 5:00 p.m.
Instead of hoping for a hole in the ground, you should be hoping that the best creative minds at CIM and Cal Pers can figure out a way to finish what remains undone at 301 CM..