Quote:
Originally Posted by tintinium
Hate to say it... but add signal control and dedicated lanes to the B-line, to drop the time to 30 minutes. A HECK of a lot cheaper.
|
Given the anti-skytrain attitude of Port Moody, and the lack of funding for Evergreen, this is actually a viable solution. It fits the footprint of the existing LRT project (minus the blank-price-tag tunnelling), and would probably get you from Point A to B in about the same amount of time. As for capacity, use some of that $900M budget to buy some more buses and run them at 5 minute intervals.
Oh wait a minute... this would require widening some roads to 6 lanes... bring out the anti-black top people.
Aiye. You can never win.
As for the comment about calling Evergreen "Light rapid transit"
This very thing has been annoying me for years.
How is 24 minutes rapid??? How can an at-grade system that interacts with heavy traffic be rapid?? Even with signal control, it won't be able to exceed the ground-level speed limit of 50km/hr.
This is not worth $900M. (and I think ole Falco knows this but simply can't say it).