Old Posted Mar 21, 2007, 11:57 PM
brian_b brian_b is offline
Registered User
 
Join Date: Oct 2005
Location: Chicago
Posts: 1,572
Quote:
Originally Posted by otis1 View Post
Retention work, as shown in the photos, has begun. The general contractor intends to have this entire site excavated in 5 weeks. This is an ambitious proposition to say the least. These guys are going to work 7 days a week until its done (thank god i dont work for them).
Tentatively, the south tower crane will be erected first. The plan is to use a triple 9 (a MASSIVE crawler crane) on a barge for assembly. This seems like an insane thing to do, but i guess its been done before. The river will likely be closed during dangerous picks.
It should be fun to watch... from a safe distance
Will you (or someone else) have info on when the best days to watch will be? I think I have a nice vantage point too, if I knew ahead of time I may be able to take good photos.
     
     
  #622  
Old Posted Mar 22, 2007, 2:26 AM
marcus's Avatar
marcus marcus is offline
marcus
 
Join Date: Aug 2006
Location: Maryland
Posts: 798
I love this render! not sure if it's here, but i got it from SSC from retrograde:
     
     
  #623  
Old Posted Mar 22, 2007, 5:20 AM
simcityaustin simcityaustin is offline
BANNED
 
Join Date: Mar 2007
Location: Usa
Posts: 407
I just think this is a great location for this building. It's going to blend in nicely, yet be very noticeable, and the tenants are going to have nice views because of the low/mid rises around it. Plus it's just a classy building.
     
     
  #624  
Old Posted Mar 22, 2007, 6:24 AM
kalmia's Avatar
kalmia kalmia is offline
Registered User
 
Join Date: Jul 2006
Location: Hammond, Indiana
Posts: 496
Quote:
Originally Posted by Chitown View Post
Oh, sweet. So, theoretically, this should move fairly fast, right?
yes, theoretically

but I don't know how they are doing things. It would be best to fabricate as much offsite where it can be done fast in a spread out area and with (I'm assuming) cheaper labor and less of it.

Would they be able to bring in barges with large sections on the river? I don't think they would tie up river traffic too much.
     
     
  #625  
Old Posted Mar 22, 2007, 8:19 PM
marcus's Avatar
marcus marcus is offline
marcus
 
Join Date: Aug 2006
Location: Maryland
Posts: 798
Quote:
Originally Posted by marcus View Post
I love this render! not sure if it's here, but i got it from SSC from retrograde:
just making sure people see this
     
     
  #626  
Old Posted Mar 31, 2007, 12:19 AM
BorisMolotov's Avatar
BorisMolotov BorisMolotov is offline
Registered User
 
Join Date: Nov 2006
Location: Madison, WI
Posts: 548
The core is one level above the street now!
     
     
  #627  
Old Posted Mar 31, 2007, 5:09 AM
Chitown Chitown is offline
Registered User
 
Join Date: Nov 2006
Posts: 584
Quote:
Originally Posted by BorisMolotov View Post
The core is one level above the street now!
Awesome. I love this project.
     
     
  #628  
Old Posted Apr 4, 2007, 11:23 PM
otis1 otis1 is offline
Registered User
 
Join Date: Jan 2007
Location: Chicago
Posts: 27
Some new info,

The general contractor has realized the 5 week excavation plan is not going to happen. The new completion target is around mid may.

Work on a LaSalle street lane closure has begun. The steel will be hoisted from there.

We have to slow down a bit on the core as it is becoming increasingly difficult to get material up there without a tower crane. We need to finish some interior slabs before we can assemble the hanging stairway to access the core as well. Its becoming a bit like chutes and ladders.

I will keep everyone posted about the dates of the barge/tower crane erection schedule. Its too early now to say when. It would probably be unwise to take a chicago river architectural tour during that phase of construction.

If thats not crazy enough for you, you might ask: How are they going to get that crane that is closest to the river out of there, since it will be blocked in by a 30' deep hole?

Well, its going south. They plan to DRIVE it OFF the river wall and ONTO a specially rigged tall barge. The barge will be not only moored off to the riverwall but will require a tugboat positioned to the south of it, ramming the barge into the seawall at full throttle while the crane operator makes the transition. There will be heavy coast guard presence and a team of divers standing by. The crane operator is required to wear a life vest (This is not something he is looking forward to, he has expressed concerns that a life vest is rather futile when you are in the belly of a 100 ton machine)

These are the kinds of things that can happen when you let an ex-army-paratrooper run a construction project.
     
     
  #629  
Old Posted Apr 4, 2007, 11:33 PM
SamInTheLoop SamInTheLoop is offline
you know where I'll be
 
Join Date: Sep 2006
Posts: 5,575
^ Dude - your updates are the best ever.....I love the dramatic description of this project's logistics......keep the posts coming!
__________________
It's simple, really - try not to design or build trash.
     
     
  #630  
Old Posted Apr 4, 2007, 11:48 PM
spyguy's Avatar
spyguy spyguy is offline
THAT Guy
 
Join Date: Oct 2005
Posts: 5,946
Quote:
Originally Posted by otis1 View Post
The crane operator is required to wear a life vest
These conditions sound ideal

Good luck to construction crews.
     
     
  #631  
Old Posted Apr 5, 2007, 12:00 AM
VA_Gentleman's Avatar
VA_Gentleman VA_Gentleman is offline
Registered User
 
Join Date: Nov 2006
Location: Northern VA
Posts: 214
Wow, that sounds dangerous. I hope the crane doesn't tip over into one of the buildings lining the river. But I guess it has probably been done before. Good luck.
     
     
  #632  
Old Posted Apr 5, 2007, 12:08 AM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: CHI/MRY
Posts: 4,789
Quote:
Originally Posted by otis1 View Post
Some new info,

The general contractor has realized the 5 week excavation plan is not going to happen. The new completion target is around mid may.

Work on a LaSalle street lane closure has begun. The steel will be hoisted from there.

We have to slow down a bit on the core as it is becoming increasingly difficult to get material up there without a tower crane. We need to finish some interior slabs before we can assemble the hanging stairway to access the core as well. Its becoming a bit like chutes and ladders.

I will keep everyone posted about the dates of the barge/tower crane erection schedule. Its too early now to say when. It would probably be unwise to take a chicago river architectural tour during that phase of construction.

If thats not crazy enough for you, you might ask: How are they going to get that crane that is closest to the river out of there, since it will be blocked in by a 30' deep hole?

Well, its going south. They plan to DRIVE it OFF the river wall and ONTO a specially rigged tall barge. The barge will be not only moored off to the riverwall but will require a tugboat positioned to the south of it, ramming the barge into the seawall at full throttle while the crane operator makes the transition. There will be heavy coast guard presence and a team of divers standing by. The crane operator is required to wear a life vest (This is not something he is looking forward to, he has expressed concerns that a life vest is rather futile when you are in the belly of a 100 ton machine)

These are the kinds of things that can happen when you let an ex-army-paratrooper run a construction project.
Wow. Brilliant sh*t; this stuff is the reason why I became an Architect
Wish I could visit the site some time *hint, hint*
__________________
Don't be shy. Step into the light.
     
     
  #633  
Old Posted Apr 5, 2007, 12:17 AM
bnk bnk is offline
BANNED
 
Join Date: Mar 2006
Location: chicagoland
Posts: 12,071
Quote:
Originally Posted by otis1 View Post

I will keep everyone posted about the dates of the barge/tower crane erection schedule. .
Wow thanks alot otis.

I appreciate every post you contribute.

It is kind of cool to have an insider view of the real construction info.

Looking forward to more.

Thanks again.

bnk

     
     
  #634  
Old Posted Apr 5, 2007, 12:22 AM
honte honte is offline
Registered
 
Join Date: Mar 2006
Location: Chicago - every nook and cranny
Posts: 4,628
Many thanks, Otis1.

Now, what about that hint you dropped in the Aqua thread? Do you mean the 300 N. LaSalle site?
     
     
  #635  
Old Posted Apr 5, 2007, 1:11 AM
aaron38's Avatar
aaron38 aaron38 is offline
312
 
Join Date: Mar 2006
Location: Palatine
Posts: 4,343
Someone needs to tell one of the science channels to get a camera crew down there to document this choreographed chaos.
Be sure to let us know the dates. Driving a crane onto a barge sounds plenty worthy of burning a vacation day and hoping a train.
     
     
  #636  
Old Posted Apr 5, 2007, 1:25 AM
budman budman is offline
Registered User
 
Join Date: Aug 2005
Posts: 487
Absoulutely fascinating. A couple of good friends of mine dock their boats at Marina City...I guess they should be careful during this phase of the construction. Any idea how long it will last?
     
     
  #637  
Old Posted Apr 5, 2007, 2:03 AM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 3,044
Would be great if someone could get that on video.
     
     
  #638  
Old Posted Apr 5, 2007, 2:41 AM
Alliance's Avatar
Alliance Alliance is offline
NEW YORK | CHICAGO
 
Join Date: Sep 2006
Location: NYC
Posts: 3,532
Quote:
Originally Posted by otis1 View Post
These are the kinds of things that can happen when you let an ex-army-paratrooper run a construction project.
Thars just amazingly wild .

GREAT info.
     
     
  #639  
Old Posted Apr 5, 2007, 3:38 AM
Derek Derek is offline
Registered User
 
Join Date: Aug 2006
Location: Portland, OR
Posts: 8,386
this is a very nice looking tower
__________________
Portlandia
     
     
  #640  
Old Posted Apr 6, 2007, 3:32 AM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,629
April 5, 2007











     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 4:18 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.