Hey Tim! Hope you're doing well. The people mover is separate from the existing system. An extension would have created a security nightmare, because the existing one is inside security, on the airside, while the new one will be on the outside of security, or the landside. The sections of track are already being put into place, and the supports/pillars line the route all the way from the existing Ground Transportation area over past the GICC to the Consolidated People Mover site. I may drive down that way today and get a couple of shots of the progress. Go to
www.atlanta-airport.com, click Airport Information, then Airport Construction, then CONRAC. That is the acronym for Consolidated Rental Car. There is a map that shows the stops, of which there are three. Looks like there will only be a couple of minute intervals between trains, so short waits for passengers. There used to be a very cool video that showed a computer generated depiction of the entire process, from arriving at the Ground Transportation Center, boarding the APM, taking it across I-85 to the facility site, walking into the center, on to the counters and rental cars, then the reverse. However, I can't find it now. Looks like they took it off the site. Oh, and it is an above-ground system, unlike the current one, so it'll look really cool traveling back and forth above the lanes of traffic on the interior Main Terminal roads and traversing I-85.
I believe the CONRAC will have 9,000 spaces, and I have read previously that ATL is the 3rd largest rental car market in the country. So much for everyone believing ATL exists largely for connecting passengers. This project will allow the Airport to reclaim prime on-site land to use for additional public parking, and parking revenue is somewhere in the neighborhood of $90M annually at the present. It's big-money!
ATLonthebrain