Quote:
Originally Posted by build_tall_chicago
I swear I saw some movement today at the casino site. Paired with the news that Bally's made the $4M payment to the city, is there confirmation on the work starting again for this?
|
It never really stopped. It was never gonna stop completely. Bally's still needs to get the building exterior sealed up before winter, or they can't even open the — areas on time. The threat was to the non-— parts of the complex, including the hotel tower and the dining/entertainment.
At the City Council hearing last week, they revealed that even in the scaled-back plan, they're still planning to finish out several floors of the hotel tower and much of the dining/entertainment. Presumably the upper floors of the hotel tower, the big concert venue etc would be left as a shell for future buildout.
I think this is a mistake. A casino that doesn't have other stuff around it, where you need to drive in and drive out to use it, is basically just Horseshoe Hammond Casino with more traffic congestion. And it will attract the same kind of customers.