HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #20021  
Old Posted Sep 23, 2026, 6:45 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,747
Downtown Update - Silo Park F&B building gets design review approval from Salt Lake City

Jacob Scholl Reporting For BuildingSaltLake.com - Full Article @ https://buildingsaltlake.com/silo-park-f...-salt-lake-city/?ct=t(RSS_EMAIL_CAMPAIGN)



Two restaurants could soon be built southwest of Pioneer Park following an approval Wednesday evening from the Salt Lake City Planning Commission, as Blaser Ventures and other developers continue their quick buildout of the development north of the Granary District.

Commissioners approved a design review for the Silo Park east retail building, a two-story building that is slated to add two new restaurants to Silo Park — The Rustic and Bowl & Barrel. The building will be located on the northeast corner of the development, near the intersection of 500 South and 400 West.

The food and beverage building sought a handful of exceptions from its MU-11 zoning, including, among other requests, alterations to ground floor glass requirements and a request to shift the building entrances away from roadways and toward the area’s midblock walkways. The latter was requested to enhance the walkability of the building and the overall Silo Park project, as the entrance is now allowed to be located away from the car-heavy arterial streets.




“Overall, the requested relief supports the design intent of the MU-11 zone by directing pedestrian activity toward safer internal public spaces, maintaining compatibility with surrounding buildings, and preserving the integrated character of the Silo Park master development,” a project narrative for the Silo Park East Retail proposal says.

The design review was approved by the planning commission without debate, as the commission placed the vote on its consent agenda. With its approval, the new F&B building will be able to move closer toward construction in the near future.

The Rustic will feature restaurant space, but also a live music venue. Bowl & Barrel will consist of a bowling alley with a full-service restaurant. Both restaurants have locations largely in Texas, and both brands are owned by the same parent company, FreeRange Concepts. The two restaurants could be open as early as next summer...

...By the time the project is fully built out, Silo Park will total 180 affordable housing units and 560 market rate units. The block will also feature a 175-room hotel and around 75,000 square feet of commercial space, which would include the two restaurants...

...Just beyond Silo Park, other restaurants are filling out the Granary District. Culinary Dropout recently opened in the Pickle Building to the south, and Uchi, a sushi restaurant, is slated to open nearby in 2027...

...The restaurants are part of Blaser Venture’s continued efforts to overhaul and shape the Granary District. Several buildings along 800 South and 500 West have already been razed as part of a greater effort to redevelop the area, as plans also include preserving the iconic Kilby Court music venue. Beyond Kilby and the nearby Granary Live, The Rustic would be the latest venue for live music to be added in the Granary District...



Silo Park Development. F&B Building upper left corner

https://buildingsaltlake.com/wp-content/uploads/2024/11/Silos-overhead-sexy.png


A rendering of the northeast corner (street facing) of the Silo Park East Retail building. Image via Nelsen Partners Architects and Planners

https://buildingsaltlake.com/silo-park-f...-salt-lake-city/?ct=t(RSS_EMAIL_CAMPAIGN)

.
Reply With Quote
     
     
  #20022  
Old Posted Sep 23, 2026, 6:49 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,747
Downtown Updates - The Granary Lofts Project - Granary District - Under Construction


Jacob Scholl Reporting For BuildingSaltLake.com - Full Article @ https://buildingsaltlake.com/loft-style-...ranary-district/?ct=t(RSS_EMAIL_CAMPAIGN)


The Granary continues to attract attention from national developers, as Seattle’s Lake Union Partners will be expanding to the west of its Evo Granary Campus at 700 South and 400 West.

A residential building at 450 W 700 S that will front the new 1000-stall parking garage was announced on the company’s Instagram account last week, adding to Lake Union Partner’s growing inventory of Salt Lake City developments...

...The project, known as the Granary Lofts and located at 450 W. 700 South, would contain 53 housing units. Though all would be one-bedrooms, the units are a mix of flats, lofts and townhouses, according to a project description
submitted to Salt Lake City by the developers, Lake Union Partners... The parcel, like much of the Granary District, is zoned as MU-11 as part of the city’s recent mixed-use zoning overhaul. The plans call for a five-story building,
with three stories being made up of lofts with mezzanine sleeping areas, according to the project description. The building would also have a spa and fitness center as well as a rooftop deck for residents.


Called Granary Lofts, renderings of the structure show a contemporary design generous with glass and balconies and clad in brick. Images courtesy Public47Architects



Images courtesy Public47Architects

...“The building will be composed primarily of loft-style apartment units that feature double-height living rooms with ample glazing and an industrial scale,” the project description says. “Walk-up townhouse units and a double-height
residential lobby will occupy the street frontage at the ground floor.”

Though the building is referred to as a five-story structure, the three upper floors will be double-height and include mezzanines. In other words, the building will look like an eight-story building, which is more in line
with the MU-11 zoning guidelines. The building would also be more similar in height to other nearby buildings, like the Journeyman Apartments...




Project Details

One-bedroom open flats: 4
One-bedroom: 3
One-bedroom lofts: 42
One-bedroom townhomes: 4
Total: 53


The building would include 26 structured parking stalls. The remaining would be within what is officially known as the Big 🞵🞵🞵 Garage, a massive, 1,000-stall parking structure built as part of the Industry SLC development...
Edit: This garage sits behind the Lofts Project and toward the center of the block. The garage will be convenient but hidden by surrounding developments.




September 2026






Photos By Kier Construction @ https://www.kier.org/our-work/multi-unit/ground-up/granary-lofts/



.
Reply With Quote
     
     
  #20023  
Old Posted Sep 23, 2026, 6:53 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,747
Downtown Update - Gables Library Square - Under Construction








May 2026






September 2026










Photos By Kier Construction @ https://www.kier.org/our-work/multi-unit/ground-up/gables-library-square/

.

Last edited by delts145; Sep 23, 2026 at 7:09 PM.
Reply With Quote
     
     
  #20024  
Old Posted Sep 23, 2026, 6:58 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,747
Downtown Update, Silo Park Building 3 - Now Under Construction


https://www.kier.org/our-work/multi-unit/ground-up/silos-building-3-2/



September, 2026











.
Reply With Quote
     
     
  #20025  
Old Posted Sep 26, 2026, 12:00 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,747
Downtown Update, Silo Park Building 2 - Now Under Construction





January 2026

The Silos Building 2 is a single use project consisting of 5 levels of Type IIIA construction over 3 levels of Type IA construction with a total unit count of 275 units.
This project features over 198,947 SF of residential, 1,161 SF of retail, 11,846 SF of Amenities and 150,195 SF of above grade parking.





















September 2026















.
Reply With Quote
     
     
  #20026  
Old Posted Sep 26, 2026, 12:06 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 20,747
Downtown Northwest - The Citizens West Project - Phases I, II & III, and Current Update On Phase IV - Hardware/Guadalupe District

The Citizen West Complex was designed by Architecture Belgique and developed by The Giv Group (led by Chris Parker).



Pictured, Citizen West Phase I, was completed first of the four projects within the complex.

(Citizens West I), which was the first phase of a multi-part mixed-use housing complex located at 300 North in Salt Lake City, Utah. Citizens West I was designed as an inclusive, mixed-affordability multifamily residential building. Its physical and structural makeup includes

- 80 residential units: It serves as a home to 80 diverse households.

- Flexible layouts: Efficient apartment floor plans equipped with modern amenities like full kitchens, stainless steel appliances, and in-unit washers and dryers.

- Eco-friendly transit amenities: An electric car-sharing program for residents and proximity to a regional transit hub.

- Integrated community spaces: Built alongside spaces designed to host local non-profits, performing arts assets, and retail (such as the community radio station KRCL). The primary purpose of Citizens West I was to establish a baseline of inclusive, transit-oriented, and mixed-income housing on the eastern edge of the Fairpark neighborhood (near Capitol Hill and Marmalade). By providing flexible layouts that span various income levels and family backgrounds, it was built to anchor a resilient, diverse community. It set the stage for subsequent phases—such as Citizens West II, III & IV—which expands on this purpose by dedicating heavily multi-tiered affordable housing directly to vulnerable populations, including refugee, homeless, and physically disabled households.





Phase II & III


The Citizens West Complex follow-up in Salt Lake City was built directly upon the success of Phase I, leading straight into Phase II & III and even a subsequent Phase IV. Developed by the Giv Group in the Guadalupe/Fairpark neighborhood, the initial phase was widely praised for its pioneering, eco-friendly, and mixed-income housing model. It provided 80 efficient, zero-emission residential units designed to reduce municipal infrastructure stress. The developer leveraged the momentum from Phase I to build subsequent. Phase I served as a successful blueprint for transit-oriented, sustainable affordable housing. Phase II & III (Opened late 2025): Fast-tracked as an extension to scale up the community's impact. These phases specifically focused on adding deeply affordable, larger family-sized units (3 and 4 bedrooms) alongside shared collective amenities like sports courts, clubhouses, and community garden boxes.



Quote:
Originally Posted by Blah_Amazing View Post
https://citizenportal.slcgov.com/Citizen...10&agencyCode=SLCREF&IsToShowInspection=

Address: 509 W 300 N

Architect: Architecture Belgique Inc.

Basics:1 building. 7 floors. 80 residential units, 100% affordable from 25% Area Median Income (AMI) to 50% AMI. 2,651 sq ft ground-floor commercial/retail space.

Project Description (from Developer): Citizens West phases 2 & 3, which is comprised of a single building, are located in the center of what is rapidly becoming an upscale luxury housing destination for many of the city’s residents. However, this project provides high quality, family housing and neighborhood-activating ground-floor retail. These new uses replace a non-conforming warehouse and parking lot, and are crucial to preserving affordability and enhancing vibrancy in west downtown and the surrounding Guadalupe neighborhood.


Citizens West phases 2 & 3 have been awarded low-income housing tax credits. The project will add a total of 80 apartments, 100% of which will be affordable, from 25% Area Median Income (AMI) to 50% AMI through the low-income housing tax credit. The project has also received funding from Utah State and the Salt Lake City RDA. The project will contain nearly half large family sized units, consisting of 10 4-bedroom apartments, 25 3-bedroom apartments, and 45 studio apartments. Ten of these units will be set aside for residents experiencing homelessness, and eight will be set aside to provide housing for refugees. Fifteen apartments will be built as type-A ADA units (more than 15% of the total dwelling units) with all others being built as adaptable units.

The use for the entire property prior to construction is industrial with light manufacturing, storage, and parking. Citizens West phases 2 & 3 will make use of this vital piece of downtown land by optimizing density (133 du/acre), providing outdoor amenity space including two outdoor patios with amenities for families, children, gathering and green space.

The project reduces the amount of parking substantially from what would normally be seen in a project of this size, especially when considering the number of large units. The parking ratio is less than 1 stall per unit.

The project draws from the surrounding traditional and industrial brick and metal structures and uses similar modernized materials, forms, and architectural styles to create a cohesive site. The building is designed to be viewed from 360 degrees and 100% of the street facing façade is clad in durable, high-quality materials. All of the parking structure is wrapped with high quality, durable materials or habitable space with a depth of at least 25 feet on the street facing façade. The building also responds to architectural elements introduced by Citizens West phase one. Each building is designed and built to complement the other buildings on the property and the surrounding neighborhood. Citizens West phases 2 & 3 features the same design team, architect, and engineers to retain continuity in aesthetics, architectural style, building forms, building materials, and building relationship that has been involved in several mixed-use affordable housing projects within a 1/3-mile radius.

The project includes a good-sized retail space that is intended for a food or dining use with space for outdoor seating which would activate the street and bring much-needed eating options to the Guadalupe neighborhood. The project is financed such that this could be low-cost space for a start-up entrepreneur and fostering space for local business.

The existing buildings and original uses on the property are incompatible with the goals of the TSA development guidelines and non-conforming to the zoning ordinance. The project will provide uses that are both conforming to the zone and compatible with the vision for a lively and affordable transit-oriented area. The project is located within 1500 feet (walking path distance) of the Guadalupe North Temple Transit Station. A large, secure bicycle storage room will also provide residents dedicated space for their bikes and help encourage alternative transportation use. Furthermore, at least 3 level 2 EV chargers will be provided in the parking garage.

The newly constructed building will be all-electric and built to Enterprise Green Certificate standards, a sustainability framework that focuses on “green building” techniques. EGC is a third-party certification program that requires Energy Star certification along with additional requirements to create a greener community than that required by Energy Star. It is equivalent or better than many LEED programs. An overarching thesis and goal for the developer is to stop adding more buildings to the valley that continue to grow our air pollution. All refrigerators, washers, and dishwashers are Energy Star certified. All lighting is high-efficiency LED with high lumen-to-watt ratios. All plumbing fixtures are low-flow. All landscaping is low-water use and either native to the area or a non-invasive adaptive species. Irrigation is designed to be low-water and utilizes weather-based controls to avoid watering when unnecessary. A minimum of 50% of all construction waste is either recycled or otherwise diverted from the landfill. Electric vehicle charging is provided in excess of city requirements for this project.



Renderings of Phases II & III Under Construction











Elevations:


Floor plans:


October 7, 2024



Photo By Paniolo Man



February 10, 2025

Aerial View from the back of Phase I already completed on the left and Phase II & III under construction on the right

Citizen West II & III under construction. Photo By Devin Zander for BuildingSaltLake.com @ https://buildingsaltlake.com/latest-roun...its-to-300-north&ct=t(RSS_EMAIL_CAMPAIGN)



November 26, 2025

Front view of the completed exterior of Phase II & III
























Office Suites






Studio







https://www.forrentuniversity.com/ut/salt-lake-city/citizens-west-2-and-3/1rb9h14



Phase IV


Phase IV (Under Construction): Expanded the master plan even further by adding an additional 52 units focused on multi-tiered affordable housing. Phase IV is part of the broader sustainable, carbon-neutral Citizens West cluster of developments by Giv Group designed to provide inclusive, transit-adjacent affordable urban housing with specific set-asides dedicated to family households.


Renderings of Phase IV





To the immediate north or right of Phase II & III in the background is Phase IV apartments under construction. In between Phase II/III & IV, this Phase of construction includes a good-sized retail space that is intended for a food and dining use, with space for outdoor seating, which would activate the street and bring much-needed eating options to the Guadalupe neighborhood. The project is financed such that this could be a low-cost space for a start-up entrepreneur, and fostering space for local business.

Photo By Paniolo Man



April 16, 2026






Photos By Bonneville Builders @ Facebook



Foreground, Phase II/III completed. To the back right Phase IV retail, dining space and residential under construction


Foreground, Phase II/III completed. To the back right Phase IV retail, dining space and residential under construction

Photos By https://www.forrentuniversity.com/ut/salt-lake-city/citizens-west-2-and-3/1rb9h14





September 21, 2026






Photos By Bonneville Builders @ Facebook




Current Status

- Construction momentum is actively moving forward, and the project is currently accepting leasing applications for Phase IV.

- Projected Completion: The new 52-unit building is scheduled to be completed and ready for resident move-ins in November 2026.



.
Reply With Quote
     
     
  #20027  
Old Posted Sep 26, 2026, 5:31 PM
Boz's Avatar
Boz Boz is online now
of SLC
 
Join Date: Aug 2010
Location: Smells like Commie Clown farts in here
Posts: 255
Thanks for the update, Delts.
Reply With Quote
     
     
  #20028  
Old Posted Sep 30, 2026, 12:17 AM
Ironweed Ironweed is offline
Ironweed
 
Join Date: Mar 2014
Location: Utah
Posts: 572
A bunch of infill occurring in the city. There is also a development taking shape at this location:

https://www.google.com/maps/place/269+Br..._ep=EgoyMDI2MDkyNy4xIKXMDSoASAFQAw%3D%3D

Last edited by Ironweed; Sep 30, 2026 at 12:51 AM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 7:12 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.