HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


Reply

 
Thread Tools Display Modes
     
     
  #3281  
Old Posted Aug 7, 2026, 2:01 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Quote:
Originally Posted by MonctonRad View Post


Fen's and Petro-Canada now open. Denny's and Starbuck's following within the next 10-14 days.
My last post on this new service centre.

They have erected a large highway sign on the property in the last couple of days. Aside from installing some car chargers, this project is complete.

I ate at the Denny's the other day. The restaurant is much larger on the inside than it looks on the outside. Food was decent.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3282  
Old Posted Aug 7, 2026, 5:30 PM
habs33's Avatar
habs33 habs33 is offline
Registered User
 
Join Date: Aug 2008
Location: Moncton NB
Posts: 644
I've been to the Starbucks. Nice layout with chairs and couches. the 2 scooter parking spots in front is strange though

Quote:
Originally Posted by MonctonRad View Post
My last post on this new service centre.

They have erected a large highway sign on the property in the last couple of days. Aside from installing some car chargers, this project is complete.

I ate at the Denny's the other day. The restaurant is much larger on the inside than it looks on the outside. Food was decent.
Reply With Quote
     
     
  #3283  
Old Posted Aug 21, 2026, 1:07 PM
monctonwatch monctonwatch is offline
Registered User
 
Join Date: Jul 2017
Posts: 28
not sure if this was discussed before, but am I understanding correctly that they plan to permanently close Mount Pleasant where it meets mountain road?

https://www.moncton.ca/en/media/3522
Reply With Quote
     
     
  #3284  
Old Posted Aug 21, 2026, 1:26 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Quote:
Originally Posted by monctonwatch View Post
not sure if this was discussed before, but am I understanding correctly that they plan to permanently close Mount Pleasant where it meets mountain road?

https://www.moncton.ca/en/media/3522
Not previously discussed, no.

The Mount Pleaasnt/Mountain Road intersection is heavily congested, and, it is virtually impossible to turn left onto Mountain Road from Mount Pleasant at certain times of the day, but, I fail to see how this move is necessary. What does this mean for access to the Mount Pleasant Plaza? There is also a driveway off of Mount Pleasant leading into the Lounsbury Centre. What will this mean for traffic flow through the Lounsbury Centre parking lot? Won't this just lead to more people talking this shortcut to get to Mountain Road?

I find the documentation confusing. I'm not sure exactly what they are up to. Does anyone have any additional information?
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3285  
Old Posted Aug 21, 2026, 2:01 PM
monctonwatch monctonwatch is offline
Registered User
 
Join Date: Jul 2017
Posts: 28
Exactly, I live nearby and watch people cut through the shoppers to use the lights to turn, it's gonna be even more of a nightmare
Reply With Quote
     
     
  #3286  
Old Posted Aug 21, 2026, 4:31 PM
MonctonPerson MonctonPerson is offline
Registered User
 
Join Date: Apr 2021
Posts: 149
The city has approved a slight realigning of Mount Pleasant (not a full closure) as it widens a section of Mountain Road to improve traffic flow to Hildegard Drive.

This was discussed at council Monday here and here.

Last edited by MonctonPerson; Aug 21, 2026 at 4:36 PM. Reason: Add links
Reply With Quote
     
     
  #3287  
Old Posted Aug 21, 2026, 6:12 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Quote:
Originally Posted by MonctonPerson View Post
The city has approved a slight realigning of Mount Pleasant (not a full closure) as it widens a section of Mountain Road to improve traffic flow to Hildegard Drive.

This was discussed at council Monday here and here.
Good to hear, but why was it described as "stop up and closure" in the public notice?
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3288  
Old Posted Aug 26, 2026, 2:36 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Mai Asian Restaurant on Mountain Road has been rebranded to Saichi Asian Restaurant.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3289  
Old Posted Aug 29, 2026, 9:53 PM
drewber drewber is offline
Non-Farmers, Farm Celery
 
Join Date: Jan 2009
Location: Saint Antoine, NB
Posts: 567
Quote:
Originally Posted by MonctonRad View Post
Mai Asian Restaurant on Mountain Road has been rebranded to Saichi Asian Restaurant.
Not just a rebrand but new menu and a lot of exciting plans for the future!
Reply With Quote
     
     
  #3290  
Old Posted Sep 8, 2026, 3:30 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Quote:
Originally Posted by MonctonPerson View Post
The city has approved a slight realigning of Mount Pleasant (not a full closure) as it widens a section of Mountain Road to improve traffic flow to Hildegard Drive.

This was discussed at council Monday here and here.
Work on the project has commenced.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3291  
Old Posted Sep 9, 2026, 4:36 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Quote:
Originally Posted by MonctonRad View Post
The Wheaton's store on Mountain Road is planning as expansion:

The current maximal allowable size for a commercial establishment in this location is 1500 m2, hence the need for a variance from Moncton PAC,

The expansion will be to the back of the building.
This expansion is apparently for a permanent Christmas shop. Wheaton's has a substantial seasonal Christmas display every year, but this means replacing a large portion of their furniture displays for several months which must be a pain in the 🞵🞵🞵. The expansion of the store will prevent this disruption in the future.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3292  
Old Posted Sep 10, 2026, 11:54 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
The foundation for the first of the three Riverbank Residences at 123 Salisbury Road has been installed.



Construction is ongoing.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3293  
Old Posted Sep 14, 2026, 1:21 PM
Leroy321 Leroy321 is online now
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 608
There was some heavy machinery being dropped off this morning on the corner of Bulman Dr and Mountain Rd this morning. I recall there being a planned 2x4 floor development there.

Update; they’re now gone.

Last edited by Leroy321; Sep 14, 2026 at 7:56 PM.
Reply With Quote
     
     
  #3294  
Old Posted Sep 18, 2026, 4:45 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Foundation work for the first of the five apartment buildings at the Corey Craig Drive residential development next to Casino NB at Magnetic Hill is now well advanced.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3295  
Old Posted Sep 21, 2026, 4:34 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
CG Group replied to a post on Retail Talk NB with this:

Quote:
The first building is planned to open after the final building on Millennium, between the end of 2027 and the beginning of 2028.
So, now we have a timeline for the Corey Craig development.


Updated drone shot of the development site.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #3296  
Old Posted Sep 21, 2026, 4:57 PM
Leroy321 Leroy321 is online now
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 608
Quote:
Originally Posted by MonctonRad View Post
The foundation for the first of the three Riverbank Residences at 123 Salisbury Road has been installed.



Construction is ongoing.
This project was proposed for 5 buildings did they changed the plans?
Reply With Quote
     
     
  #3297  
Old Posted Sep 21, 2026, 6:44 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Quote:
Originally Posted by Leroy321 View Post
This project was proposed for 5 buildings did they changed the plans?
You're right - I went back to check the site plan.

__________________
Go 'Cats Go
Reply With Quote
     
     
  #3298  
Old Posted Sep 21, 2026, 6:51 PM
Leroy321 Leroy321 is online now
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 608
Delete

Last edited by Leroy321; Sep 21, 2026 at 7:11 PM.
Reply With Quote
     
     
  #3299  
Old Posted Sep 21, 2026, 7:01 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
They are in the process of doubling the westbound off ramp from the TCH to Mountain Road at Magnetic Hill. This will ease the worsening congestion issues at this busy interchange.
__________________
Go 'Cats Go

Last edited by MonctonRad; Sep 22, 2026 at 2:08 AM.
Reply With Quote
     
     
  #3300  
Old Posted Sep 22, 2026, 1:20 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,290
Moncton’s newest public garden space promotes peace
Idea came about after greater Moncton signed on to become an international city of peace in 2020.
Victoria Walton · CBC News · Posted: Sep 21, 2026 7:01 PM ADT | Last Updated: September 21
https://www.cbc.ca/news/canada/new-brunswick/moncton-peace-garden-mapleton-park-9.7352623

Quote:
The garden is within Mapleton Park, just minutes away from many of the city’s stores and restaurants. But for Nameth and co-chair Sherry Trenholm, it’s a world apart.

“I think for many people, it is a nice place to come, to be able to sit and take a moment to have a peaceful environment,” said Trenholm, who also works for the City of Moncton as a director of special projects.
Quote:
At the entrance to the garden sits a large carved sea turtle sculpture, which was commissioned from artist Kerry O’Toole in Carleton County.“

It's facing exactly east for the rising sun in honour of the Indigenous [people] and Turtle Island," Trenholm said. "So we're welcoming everybody into the garden."
Quote:
Among the trees in the garden is a special Vimy Ridge oak, a descendant of an oak tree in France brought back after the First World War.
Quote:
The garden also includes a “peace pole,” which has the words “imagine peace” written on it in seven different languages. Trenholm says she worked with the multicultural organization Moncton Cares to ensure the languages represented people who call Moncton home.



__________________
Go 'Cats Go
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 10:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.