105, boulevard des Allumettières | 10f | Proposed

Proposal to demolish the Maison funéraire Serge Legault on Allumettières and the entire block between Dollard-des-Ormeaux and Laval. Two new 10 floor residential buildings with 121 units and 70 parking spaces would be built on the site. Same architectural firm (Lapalme Rheault) as Le Vibe at Maisonneuve and Élizabeth-Bruyère. I assume same developer as well (Groupe Sheiner), but I could be wrong on that one.

The City recommends the demolition of the current buildings. The zoning allows for 8 floors while the CDP calls for 10 floors.

The local Councillor Cédric Tessier approves of the project.

I'm disappointed with the height. I feel that the intersection of two major boulevards is the right place for height.


https://twitter.com/LeDroitca/status/1360877715029594115







More on LeDroit: Un gros changement de décor à venir dans le centre-ville de Gatineau

https://www.ledroit.com/actualites/gatin...atineau-e138494bfde0f1f6d2ef141d668825cc
Reply With Quote
     
     
  #2  
Old Posted Feb 15, 2021, 1:59 PM
FutureWickedCity's Avatar
FutureWickedCity FutureWickedCity is offline
 
Join Date: Mar 2016
Posts: 339
This height/massing is in line with the other recent developments in the Maisonneueve area. If they continue developing projects with this massing it could make for quite an attractive overall aesthetic for the area.
Reply With Quote
     
     
  #3  
Old Posted Feb 15, 2021, 2:11 PM
Acajack's Avatar
Acajack Acajack is offline
 
Join Date: Aug 2006
Posts: 72,949
I kinda liked the look of that funeral home. There weren't many buildings like it in Gatineau (Hull).
Reply With Quote
     
     
  #4  
Old Posted Feb 15, 2021, 3:37 PM
Norman Bates Norman Bates is offline
 
Join Date: Feb 2009
Posts: 1,027
Quote:
Originally Posted by Acajack View Post
I kinda liked the look of that funeral home. There weren't many buildings like it in Gatineau (Hull).
I concur. I feel that it had future heritage potential.
Reply With Quote
     
     
  #5  
Old Posted Feb 27, 2021, 5:37 AM
jt-mtl jt-mtl is offline
 
Join Date: Aug 2011
Posts: 85
Great to see more mid-rise housing developments on Allumetieres and in Hull. This is aligned with the height on other developments on Maisonneuve. Increase the density of Hull, increase the viability of that area.
Reply With Quote
     
     
  #6  
Old Posted Feb 27, 2021, 5:40 AM
jt-mtl jt-mtl is offline
 
Join Date: Aug 2011
Posts: 85
Quote:
Originally Posted by Norman Bates View Post
I concur. I feel that it had future heritage potential.
Please, let's not make every building a heritage building. Having worked and almost owned a piece of a heritage building, it is more of a headache to maintain and be relevant to an area.
Reply With Quote
     
     
  #7  
Old Posted Feb 28, 2021, 1:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by jt-mtl View Post
Please, let's not make every building a heritage building. Having worked and almost owned a piece of a heritage building, it is more of a headache to maintain and be relevant to an area.
I have to agree with you on this one. I can't see the heritage appeal of the funeral home. Looks like a cheap 70s build. No context with the areas history.

Looking at GeoOttawa, it was there in 1965, but not 1928. I have a feeling it was heavily altered at some point.
Reply With Quote
     
     
  #8  
Old Posted Feb 21, 2022, 3:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quite the kerfuffle on this one.

Twelve residents signed to open a registry in the hopes of getting a referendum on the project (similar to what happened with Bloome). Somehow the developer gets its hands on the list, collecting names, addresses and contact info of residents who signed. Developer begins a campaign to contact these people in order to change their minds. Registry opens, garnering 23 signatures. One resident signs an affidavit saying he did not sign the first document to open a registry, saying his son who has the same signature signed it. City throws the entire process in the garbage without advising residents. City puts the project up to a vote at Council.

https://www.ledroit.com/2022/02/01/gatin...uietant-35ee7b51ae435c6b5e8f2fe9a9f6b072

Don't get me wrong, I'm opposed to a process that requires so few signatures and voters to kill a project, but the fact of the matter is, this process does exist. If one signature is deemed not admissible, the residents should be advised and given a few days to complete the process once more. On the other hand, seems lazy to only gather the minimum number of signatures. And how did the developer get their hands on that list? Did they bribe the one guy to say he was not the one who signed?
Reply With Quote
     
     
  #9  
Old Posted May 6, 2022, 12:04 PM
rocketphish's Avatar
rocketphish rocketphish is online now
 
Join Date: Feb 2009
Posts: 14,714
Possible revirement de situation dans le dossier de l’incident réglementaire au centre-ville de Gatineau

Mathieu Bélanger, Le Droit
4 mai 2022 17h53 | Mis à jour à 23h03


L’incident réglementaire qui a fait déraper un processus d’opposition citoyenne visant un projet de construction sur les terrains de l’ancienne maison funéraire Serge Legault, dans le centre-ville de Gatineau, dont Le Droit révélait l’existence en février dernier, pourrait connaître un important revirement de situation jeudi après-midi.

Les élus ont été convoqués de manière extraordinaire pour un conseil municipal spécial, à 13h45, au cours duquel ils seront appelés à voter sur un «acquiescement à la demande dans le pourvoir en contrôle judiciaire» déposé en Cour supérieure par l’Association des résidents de l’Île-de-Hull (ARIH). Ces derniers exigeaient de la Ville qu’elle revienne sur sa décision et qu’elle tienne, comme prévu, un référendum permettant aux citoyens de s’opposer au changement de zonage demandé par le Groupe Sheiner.

Les avocats de l’ARIH allégeaient que la procédure suivie par le service du greffe dans ce dossier était «illégale, déraisonnable» et qu’elle comportait des «manquements important à l’équité procédurale.»

Les implications juridiques et administratives de la décision que doit maintenant prendre le conseil municipal sont suffisamment importantes pour que la Ville organise un breffage technique à l’intention des médias avant le vote. Dans les jours précédant la publication du dossier dans Le Droit, le service du greffe, le service juridique et le service des communications de la Ville de Gatineau avaient tous refusé catégoriquement les demandes d’entrevue à ce sujet.

En réaction à l’article, «Un incident réglementaire inquiétant» publié le 2 février dernier, la mairesse de Gatineau, France Bélisle, et le président du comité consultatif d’urbanisme (CCU), Mario Aubé, avaient assuré, sur la foi d’avis légaux, que la façon de procéder de la Ville était sans faute et que le service du greffe avait fait preuve d’impartialité. «Je leur lève mon chapeau», avait alors affirmé M. Aubé en mêlée de presse.

La mairesse s’était pour sa part dite «tout à fait rassurée» par les explications des fonctionnaires. Selon elle, la gestion de ce dossier était juridiquement sans tache. «Je comprends que l’issue déplaise aux citoyens et [au conseiller Steve] Moran, je peux comprendre cette déception, par contre, la procédure a été suivie, avait insisté la mairesse. Nous avons des avis légaux qui nous mènent là où on est aujourd’hui. Les citoyens ont des recours vers lesquels ils peuvent se tourner. Pour moi, l’important c’est qu’à l’interne, la Ville a des professionnels qui ont fait leur job.»

L’incident réglementaire tout à fait inusité à l’origine du pourvoi en contrôle judiciaire remonte à l’automne 2021. Il a soulevé de nombreuses inquiétudes concernant l’intégrité du processus en place à la Ville de Gatineau pour permettre à la population de s’opposer à des projets de construction.

Alors que les nouveaux élus commençaient à peine à se familiariser avec leur rôle et les rouages de l’appareil municipal, la Ville de Gatineau a subitement mis fin à une démarche référendaire entamée par des résidents souhaitant bloquer un changement de zonage sur le boulevard des Allumettières. Les citoyens, qui avaient pourtant été suffisamment nombreux à signer un registre pour obtenir la tenue d’un référendum, n’ont jamais été avisés par la Ville du revirement de situation.

C’est un véritable coup de théâtre survenu le 21 octobre qui a complètement fait déraper le processus amorcé par les citoyens. Manuel Botelho, un résident de la rue Laval, dont la signature apparaît dans le document demandant l’ouverture d’un registre référendaire a avisé le promoteur du projet qu’il n’était pas celui qui avait signé le document. Le promoteur a ensuite immédiatement entrepris les procédures pour faire signer un affidavit à M. Botelho. Un représentant du service du greffe s’était même rendu à la résidence de ce dernier pour obtenir le document officiel. Sur la foi de cet affidavit, le service du greffe a mis fin au processus référendaire, le jugeant vicié. Des citoyens ont tenté d’amener une preuve différente, mais la Ville a refusé d’en tenir compte.
Réactions

Claude Royer, représentant de l’ARIH dans ce dossier, a appris, par les médias, mercredi après-midi, la tenue du conseil municipal spécial de mercredi. Il a préféré ne pas commenter le dossier avant de connaître la position du conseil municipal. Le responsable de l’acquisition et du développement pour le Groupe Sheiner, Pierre Côté, a aussi laissé entendre qu’il n’était pas au fait de ce développement dans le dossier. Il a, lui aussi, refusé de commenter la situation pour l’instant.

https://www.ledroit.com/2022/05/04/possi...atineau-42d48eadd0300497e7bb149649a28fc2
Reply With Quote
     
     
  #10  
Old Posted May 7, 2022, 11:22 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
That stupid referendum rule strikes again, but in a different way this time.

How is this area only zoned for 8 floors? Allumettières and Maisonneuve should be lined with towers, stepping down towards Quartier du Musée and Vieux Hull and back up towards Place du Portage, Terraces and Laurier (excluding the two heritage districts).
Reply With Quote
     
     
  #11  
Old Posted Sep 18, 2026, 1:46 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
105, boulevard des Allumettières | 10f | Proposed

City of Gatineau PDF: https://www.gatineau.ca/upload/avis...levard_des_allumettières_et_135__rue_kent.pdf

Description: Bâtiment multifamilial de dix étages abritant, comportant 119 logements. Des discussions sont en cours entre la personne requérante et les instancesgouvernementales afin d’obtenir l’admissibilité du projet à un programme de financement visant la création de logements abordables.

Location: https://www.google.com/maps/place/150+Bd..._ep=EgoyMDI2MDkxNS4wIKXMDSoASAFQAw%3D%3D



Site Plan:



Renderings:

Reply With Quote
     
     
  #12  
Old Posted Sep 18, 2026, 2:10 PM
FutureWickedCity's Avatar
FutureWickedCity FutureWickedCity is offline
 
Join Date: Mar 2016
Posts: 339
I know i'll be mocked for this, but I wouldn't want to live on the site of a former funeral parlour. Luckily, there are lots of folks with no such reservations.
Reply With Quote
     
     
  #13  
Old Posted Sep 18, 2026, 2:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
More info on the original demo request and proposal from 2020: https://www.gatineau.ca/upload/avis_publ...05__boulevard_des_allumetti%C3%A8res.pdf

At the time, it was the funeral home block and the block east.
Reply With Quote
     
     
  #14  
Old Posted Sep 18, 2026, 5:45 PM
harls's Avatar
harls harls is online now
 
Join Date: Jan 2002
Posts: 21,458
Quote:
Originally Posted by FutureWickedCity View Post
I know i'll be mocked for this, but I wouldn't want to live on the site of a former funeral parlour. Luckily, there are lots of folks with no such reservations.
Ha, I said the same thing on SRC. There will certainly be a group of people that will refuse to live on a site that housed dead people.

Hudson Park had a funeral home too - Aug 31, 2006.

Kind of a shame it's gone..

Reply With Quote
     
     
  #15  
Old Posted Sep 18, 2026, 5:54 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by harls View Post
Ha, I said the same thing on SRC. There will certainly be a group of people that will refuse to live on a site that housed dead people.

Hudson Park had a funeral home too - Aug 31, 2006 :

I imagine most people who move into that future building won't even know it was the site of a funeral home. For those who do, could be a pro, could be a con.

Re: Hudson Park, wow, that's a tragedy! What a beautiful building. Quite unique for Centretown.

FWIW, Hudson Park is one of the nicest residential addresses, but I'm still very sad about what was lost. If the blocky 12 storey proposal had been built, I'd be livid.
Reply With Quote
     
     
  #16  
Old Posted Sep 18, 2026, 6:03 PM
harls's Avatar
harls harls is online now
 
Join Date: Jan 2002
Posts: 21,458
Une autre - même date

Reply With Quote
     
     
  #17  
Old Posted Sep 18, 2026, 11:27 PM
AuxTown's Avatar
AuxTown AuxTown is offline
 
Join Date: Apr 2006
Posts: 4,654
I love the "Ottawa Historical Photo Minute", par Harls
Reply With Quote
     
     
  #18  
Old Posted Oct 14, 2026, 7:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Hull dit adieu à un pan de son histoire funéraire
Par Mathieu Bélanger, Le Droit
3 octobre 2026 à 20h25


Des gens y ont pleuré le décès de leurs proches pendant un siècle. Aujourd’hui, ce lieu profondément enraciné dans la vie des Hullois est sur le point d’être rayé du paysage.

La démolition de l’ancien Salon funéraire Serge Legault abandonné depuis 10 ans à l’angle du boulevard des Allumettières et de la rue Laval a été autorisée, cette semaine, par la Ville de Gatineau. Un immeuble de 10 étages comprenant une centaine de logements viendra le remplacer. Il doit être en chantier dans les prochains mois.





L’endroit n’a rien d’extravagant ni même une quelconque valeur patrimoniale ou architecturale susceptible de militer en faveur de sa préservation. Il n’en demeure pas moins chargé d’une histoire qui mérite d’être racontée une dernière fois avant l’arrivée du pic des démolisseurs.

Le Droit a été en mesure de la retracer en détail grâce à la précieuse collaboration de l’historienne-conseil Michelle Guitard et des historiens et auteurs Raymond et Jean-Guy Ouimet.

L’immeuble peint en blanc qui occupe toute la tête d’îlot entre les rues Kent et Laval, en bordure du boulevard des Allumettières, a été modifié à de nombreuses reprises au fil des décennies. Serge Legault y a eu son salon funéraire de 1975 à 2017, mais les liens entre la mort et cette série de bâtiments un peu quelconques remontaient cependant déjà à quelques générations quand l’entrepreneur de pompes funèbres en a fait l’acquisition.

L’endroit est intimement associé à l’industrie funéraire depuis plus de 100 ans, mais aussi à un très singulier criminel de Hull dont le nom a même résonné jusqu’à la Chambre de communes [à lire dimanche].

Les années Émond

Les bâtiments les plus anciens du site datent de 1911 et 1913. Dès le début des années 1920, ils sont occupés par Moïse Émond. Ce dernier n’en deviendra cependant propriétaire qu’en 1935. C’est lui qui sera le premier à tisser la longue relation intime, parfois douloureuse, entre ce lieu et la population de l’île de Hull. Il en fera l’un des berceaux de l’industrie funéraire moderne en Outaouais.


À droite, le Salon funéraire Émond au début des années 1970. Le boulevard Saint-Laurent qui deviendra plus tard le boulevard des Allumettières n'avait pas encore été élargi. (BANQ)

Les premières funérailles célébrées au salon dirigé par Moïse Émond auraient été celles d’un certain Lionel Lalonde, qui s’était noyé au quai de Hull.

Moïse Émond a quitté Gracefield pour s’installer à Hull en 1912. Il a d’abord travaillé à la construction du couvent des Servantes de Jésus-Marie, sur la rue Laurier. Il était électricien et menuisier. Pour arrondir les fins de mois, il s’est mis à fabriquer des cercueils.

Le sens des affaires ne lui était pas étranger. Il avait trouvé le moyen d’écouler ses cercueils chez un marchand situé en face de l’imposante église Notre-Dame-de-Grâce [aujourd’hui l’hôtel Four Points].

De fil en aiguille, Moïse Émond est devenu embaumeur. Au recensement de 1921, il est inscrit comme entrepreneur de pompes funèbres. Il a transféré la propriété de son salon funéraire en bordure du boulevard Saint-Laurent [des Allumettières] à deux de ses fils, Roméo et Lionel en 1956. Un vestibule a été ajouté autour de 1965, ce qui a permis de relier les deux immeubles déjà présents sur le site.

Empire funèbre

L’un de ces fils est Lionel Émond. Une fois son apprentissage du métier complété dans les installations familiales du boulevard Saint-Laurent, Lionel Émond se lance à son tour en affaires. Il finira par se hisser à la tête d’un petit empire funèbre local avant de poursuivre une carrière en politique. Le boulevard Lionel-Émond, à Hull, honore sa mémoire.

Lionel Émond n’a que 18 ans, en 1925, lorsqu’il fonde la Maison funéraire Émond. Marchant dans les traces de son père, il ouvre son premier salon funéraire sur le boulevard Saint-Joseph. Dans ses mémoires écrites en 1976, il explique que c’est grâce à sa femme Marie-Rose, qui a accepté de vendre sa police d’assurance, qu’il a pu acheter son premier corbillard en 1935, un Packard 12 cylindres. Ce véhicule de prestige, summum du luxe funéraire à l’époque, a grandement contribué à la notoriété de la maison.

Comme son père, Lionel Émond ne manque pas de sens des affaires. Il raconte fièrement dans ses écrits qu’il n’hésitait pas à prêter sa propre Cadillac noire aux prêtres qui rendaient visite aux malades souhaitant recevoir l’extrême-onction avant de mourir. Certains pourraient croire qu’il s’agissait d’une façon comme une autre de se donner un avantage concurrentiel dans le marché.

Lionel Émond a longtemps été très respecté dans l’industrie funéraire. Il a eu des succursales à Hull, Aylmer, Gatineau, Wakefield et Kazabazua, ce qui en faisait à l’époque le plus important entrepreneur de pompes funèbres de l’ouest du Québec. Il a aussi formé d’autres directeurs de funérailles qui ont fait fortune dans le domaine, comme Lorne Kelly, le fondateur de la Maison funéraire Kelly.

Lionel Émond a été échevin à la Ville de Hull de 1945 à 1959, avant d’être défait à la mairie en 1959, 1961 et 1964. Il a tenté sa chance aux élections provinciales de 1960 avec l’Union nationale, mais il a été défait par le libéral Oswald Parent, qui règnera sur la circonscription pendant 20 ans.

Les années Legault

En 1975, le vieux salon fondé par Moïse Émond, 50 ans plus tôt, passe aux mains de Serge Legault, un jeune directeur de funérailles dont l’ambition et le talent ne font pas de doute. Ce dernier a gagné ses galons au sein d’une autre entreprise funéraire de renom à Hull, la Maison funéraire Gauthier.

«L’embaumement, pour moi, est une vocation, racontait-il au chroniqueur du Droit, Denis Gratton, en 2017. Les familles te confient leurs défunts dans le but de les revoir comme ils étaient avant la maladie. J’avais donc une mission chaque fois que quelqu’un décédait. Je travaillais à partir d’une photo. Et quand j’avais terminé mon travail, la personne était comme sur la photo. J’étais Monsieur Miracle pour beaucoup de familles.»

Le Salon funéraire Serge Legault a été en affaire jusqu’en 2017. Il s’agira de la toute dernière entreprise familiale indépendante de services funéraires de la région. À la mort de ce dernier, en 2019, les hommages des Hullois inondent le site de la Coopérative funéraire de l’Outaouais. Son humanisme, sa grande générosité, son professionnalisme, son élégance et ses grandes qualités de thanatologue sont soulignés à grands traits.

L’ensemble funéraire a été revendu au Groupe Scheiner en 2019. La firme s’est associée au promoteur immobilier Oktodev. Le directeur général de l’entreprise, Dominic Chaîné, précise qu’il souhaite maintenant y réaliser la construction d’un immeuble de 10 étages comprenant 119 logements. Sa construction pourrait débuter avant le début de l’été 2027. «On prévoit un projet 100 % abordable, dit-il. On travaille présentement en ce sens avec la Société d’habitation du Québec (SHQ) et Maison Canada.»

https://www.ledroit.com/actualites/actua...re-funeraire-K733X2W6BRF3RIUCT2QZ6BDSSA/
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Gatineau
Forum Jump



Forum Jump


All times are GMT. The time now is 1:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.