City plants 200 trees along the path which runs south of these Medallion buildings. Progress on finishing the paving stone walkway has been very slow with most of the edge stone angle cuts still to be installed. They paved the bike path section over a month ago which runs all the way to Wellington St.
Work is still happening on the heritage building renovations but progress there is also very slow. The new widows are not installed yet and are still covered by plywood.
https://www.ctvnews.ca/london/article/200-trees-planted-in-london-to-mark-citys-bicentennial/