Now forming the mechanical penthouse and roof top features on the east end of this 8s building. Masonry contractor continues to install faux stone blocks base course around the western end of this building. Exterior steel framing started on the east end and insulation board installs as well as they work to build the exterior shell. Should see the steel framing for the 2s common area glass wall on the SW corner being installed soon.
|