Old Posted Apr 29, 2026, 11:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Arthur Voaden HS to close at end of this school year in St Thomas.

https://lfpress.com/news/local-news/arth...t-thomas-to-close-after-nearly-a-century
Reply With Quote
     
     
  #122  
Old Posted May 11, 2026, 4:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
They have picked up the pace on the concrete block walls and structural steel for the new Warbler Woods elementary school.
Reply With Quote
     
     
  #123  
Old Posted May 17, 2026, 4:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
The masonry contractor has started installing the concrete block walls for the new Catholic elementary school off Stackhouse Ave in NE London. A large delivery of structural steel is also now onsite.
Reply With Quote
     
     
  #124  
Old Posted May 24, 2026, 2:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Have made alot of progress installing the exterior brick on the new elementary school in the Jackson neighborhood. The gym is getting a mix of exterior brick and siding.
Reply With Quote
     
     
  #125  
Old Posted May 30, 2026, 12:22 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Final touch-ups on exterior brick and trim on the new Catholic Regina Mundi HS on Wellington Rd S. I would expect they are targeting completion in time for new school year in Sept.
Reply With Quote
     
     
  #126  
Old Posted May 31, 2026, 8:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
They have now installed the 2nd floor precast concrete floor slabs for the new elementary school in Warbler Woods.
Reply With Quote
     
     
  #127  
Old Posted Jun 9, 2026, 6:21 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Alot of the structural steel is now installed for the new elementary school east of Stackhouse in NE London. Making alot of progress installing the concrete block for the gym. Still need to install the 2nd floor roof joist structural steel and the 2nd floor steel sheets for the concrete slab pour.
Reply With Quote
     
     
  #128  
Old Posted Jun 17, 2026, 7:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
The new Lucan elementary school is still getting the 2nd floor concrete block walls built. Opening is targeted at March 2027.


To maintain the current Wilberforce Public School attendance area and due to proposed site for this school, grade reconfiguration in Lucan will be needed as part of this project. Clover Public School will be a Junior Kindergarten to Grade 3 school with a child care centre and Wilberforce Public School will be converted to a Grade 4 to 8 school.
Reply With Quote
     
     
  #129  
Old Posted Jun 28, 2026, 10:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Concrete block wall work continues and more structural steel being installed for the 2nd floor of the new Warbler Woods elementary school.
Reply With Quote
     
     
  #130  
Old Posted Jul 6, 2026, 12:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
They have basically wrapped up the exterior brick on the new elementary school in Jackson subdivision. Have already poured the concrete curbing and walkways for the parking lot and driveway. Grading for the parking lot has started which likely means paving will begin soon.
Reply With Quote
     
     
  #131  
Old Posted Jul 10, 2026, 2:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
LFP article on what happens next to the Arthur Voaden HS building and property.


https://lfpress.com/news/local-news/whats-next-for-st-thomas-century-old-arthur-voaden-school
Reply With Quote
     
     
  #132  
Old Posted Jul 19, 2026, 7:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Still working on the concrete block ground floor wall builds on the SE corner of the Warbler Woods elementary school. Have started installing the roof metal sheeting on the NW wing.
Reply With Quote
     
     
  #133  
Old Posted Jul 21, 2026, 11:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Paving of the parking lot and driveway is nearly complete for the new Jackson area elementary school. Interior lights are being installed for the classrooms which is a good sign interior finishing is progressing.
Reply With Quote
     
     
  #134  
Old Posted Aug 9, 2026, 3:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Masonry contractor has made alot of progress with the installation of the exterior brick on the new elementary school in Belmont. Could be done by next month.
Reply With Quote
     
     
  #135  
Old Posted Aug 14, 2026, 5:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Landscaping work on the new Regina Mundi HS well underway now. Driveway and walkway concrete poured and paving has started.
Reply With Quote
     
     
  #136  
Old Posted Aug 23, 2026, 8:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Exterior brick is around 50% complete on the new catholic elementary school in Kilworth.
Reply With Quote
     
     
  #137  
Old Posted Aug 26, 2026, 11:38 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,296
Landscaping contractor has been making alot of progress installing saplings and plants around the new elementary school in Jackson subdivision in SE London. They have already installed some basketball hoops and soccer goal posts in the playground area. Definitely appear to be planning to open the school this Sept.
Reply With Quote
     
     
  #138  
Old Posted Aug 26, 2026, 9:36 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Quote:
Originally Posted by jammer139 View Post
Landscaping contractor has been making alot of progress installing saplings and plants around the new elementary school in Jackson subdivision in SE London. They have already installed some basketball hoops and soccer goal posts in the playground area. Definitely appear to be planning to open the school this Sept.
I delivered computer equipment there today. Yes they plan to open for the school year. No doubt there will be finishing touches happening but they will get there. I remember when Pomeroy opened several years ago, I was there the week before Labour Day and thought no way were they going to be ready and they did. Same thing with that other school in that neighbourhood that opened last year, I think I even posted here that there was no way (and this was a couple months out I think) and they opened.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 12:49 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.