HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #61  
Old Posted Jun 10, 2025, 11:41 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,289
If the demolition was approved by council, they should get those buildings down as soon as possible, before anyone changes their mind. Go into city hall Friday at 3 when the junior staff is working, wave around the council order and get that demo permit filed before they know what happened and roll the machines overnight Friday. Talk to that dude in Byron if they need to know how knock something down in darkness lol.
Reply With Quote
     
     
  #62  
Old Posted Jun 28, 2025, 12:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
Looks like the OLT appeal on heritage is wrapping up based on this.


https://www.canlii.org/en/on/onlt/doc/2025/2025canlii60352/2025canlii60352.html
Reply With Quote
     
     
  #63  
Old Posted Oct 12, 2025, 2:48 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
York has got construction fencing up around the 2 one floor houses on the corner. Looks like the utilities have been disconnected so could see them demolished soon.
Reply With Quote
     
     
  #64  
Old Posted Nov 18, 2025, 4:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
Reply With Quote
     
     
  #65  
Old Posted Nov 24, 2025, 8:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
Stripping the bricks off the 2 story and packing them on pallets. The 2 one story houses on Ann are gone. The one story on St George is still there and appears to still have tenants. The old auto repair shop/former brewery is also untouched.

Last edited by jammer139; Nov 25, 2025 at 3:34 AM.
Reply With Quote
     
     
  #66  
Old Posted Dec 17, 2025, 8:40 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
The 2s brick house is now gone as is the 2nd one story house on St George. Still one of the 1s houses left standing. Appears to maybe having a tenant left. They have started removing window frames from the old car repair/brewery buildings. Guessing they will strip it of heritage elements before bringing it down.

Will York get a detailed site plan application approved and building permit in 2026?
Reply With Quote
     
     
  #67  
Old Posted Dec 18, 2025, 11:38 PM
Spoofy Spoofy is offline
Registered User
 
Join Date: May 2016
Posts: 132
Quote:
Originally Posted by jammer139 View Post
The 2s brick house is now gone as is the 2nd one story house on St George. Still one of the 1s houses left standing. Appears to maybe having a tenant left. They have started removing window frames from the old car repair/brewery buildings. Guessing they will strip it of heritage elements before bringing it down.

Will York get a detailed site plan application approved and building permit in 2026?
Looks like we've got a site plan application filed, this one seems to be moving along quite quickly.

Reply With Quote
     
     
  #68  
Old Posted Jan 11, 2026, 2:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
The Ann Street building that was in process of being demolished and already opened up with most of the windows removed catches fire.

https://www.ctvnews.ca/london/article/overnight-fire-causes-heavy-damage-at-empty-building/

LFP article with more pictures - https://lfpress.com/news/local-news/lond...help-solving-series-of-daytime-break-ins

CBC coverage - https://www.cbc.ca/news/canada/london/2-...ic-kent-brewery-not-suspicious-9.7041564

Last edited by jammer139; Jan 12, 2026 at 12:09 AM.
Reply With Quote
     
     
  #69  
Old Posted Jan 13, 2026, 2:00 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
Building demolished today after fire. The single story house on Ann street is still there thou.

https://lfpress.com/news/local-news/fire-guts-historic-building-tower-plans-unchanged
Reply With Quote
     
     
  #70  
Old Posted Jan 13, 2026, 5:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
The remaining 1s house on Ann street has also been knocked down now. Still have to clear it and dig out the basement foundation.
Reply With Quote
     
     
  #71  
Old Posted Aug 20, 2026, 11:32 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
This is listed as 84 St George St on city permit website. The site has been cleared since last winter. Site plan application process has been going back and forth between York and the City as seen by the timeline below.




Site Plan Applications - Site Plan - Standard - Residential - 24-storey, 221-unit Apartment Building 2nd Submission Requested January 07, 2026 2nd Submission Received April 13, 2026 3rd Submission Requested May 4, 2026 3rd Submission Received July 02, 2026 4th Submission Requested July 17, 2026
Reply With Quote
     
     
  #72  
Old Posted Aug 20, 2026, 3:22 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,758
This is one project in the city that I do not care if it never gets built. I guess that added population is always good, but the design is so ugly that I think it has a negative impact on the skyline.
Reply With Quote
     
     
  #73  
Old Posted Aug 20, 2026, 6:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,291
The original 28s proposal would have been even better.
Reply With Quote
     
     
  #74  
Old Posted Aug 25, 2026, 9:37 PM
Spoofy Spoofy is offline
Registered User
 
Join Date: May 2016
Posts: 132
Quote:
Originally Posted by jammer139 View Post
The original 28s proposal would have been even better.
Looks like York agrees based on their Minor Variance application that they recently submitted for this development.

Reply With Quote
     
     
  #75  
Old Posted Aug 26, 2026, 10:21 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,289
Maybe that's the way to get closer to original heights, is talk them down a bit to get the overall project approved and then see how much of that concession you can get back after the fact by calling it a minor variance.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 1:21 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.