Really unfortunate that the east facade of the shorter building was left completely blank.
Reply With Quote
     
     
  #182  
Old Posted Jun 3, 2026, 1:29 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,787
^very drewlowish of them.
Reply With Quote
     
     
  #183  
Old Posted Jun 3, 2026, 1:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
Kind of makes sense because immediately east of the east wall is a natural gas pump and distribution facility with lots of above ground pipes and equipment. Who would want to look out over that? From ground level the fencing hides most of the pipes and equipment.
Reply With Quote
     
     
  #184  
Old Posted Jun 15, 2026, 5:30 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,772
The crane is coming down today on the shorter Yorkville tower.
Reply With Quote
     
     
  #185  
Old Posted Jun 16, 2026, 11:32 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
York wasting no time removing that tower crane. Exterior and interior finishing well underway now will likely see first tenants by end of the summer for this 12s building.
Reply With Quote
     
     
  #186  
Old Posted Jun 16, 2026, 2:59 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,363
Yep, I mentioned a month ago they said September was the plan.
Reply With Quote
     
     
  #187  
Old Posted Jun 19, 2026, 5:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
Concrete finishing crews already working on the exterior paint on the 12s building. Forming has started for 2nd floor slab on the north building and alot of progress forming and pouring the ground floor posts on the south building. Forming has started on the ground floor slab on the south side of south building. The Site 1 project has two towers above a large podium base on the SE corner of Southdale and Bostwick.
Reply With Quote
     
     
  #188  
Old Posted Aug 2, 2026, 9:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
Work continues on exterior concrete finishing and painting of the 12s building. Forming ground floor walls and posts continues on the Site 1 buildings podium base. Still working on the L1 floor slab forming for the underground parking on the SE corner of the pit
Reply With Quote
     
     
  #189  
Old Posted Aug 17, 2026, 4:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
York now has a webpage up for their new 12s apartment building which they are calling Celine.


Renting now for first tenants.


https://liveatceline.ca/


The exterior concrete finishing and painting is moving along quickly. Landscaping prep is also started.
Reply With Quote
     
     
  #190  
Old Posted Aug 23, 2026, 8:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
Have now poured some of the 3rd floor posts on the NE corner of the podium base.
Reply With Quote
     
     
  #191  
Old Posted Sep 19, 2026, 8:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
Forming and pouring of the 3rd floor slab is progressing on the podium base below what will be two towers eventually on site 1. The 12s building exterior concrete finishing and painting is wrapped up. Still working on the interior finishing.
Reply With Quote
     
     
  #192  
Old Posted Oct 2, 2026, 9:40 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,531
Forming of third floor walls and posts continues on the podium base of the two apartment buildings going up at site 1. Forming for the 4th floor slab section has started as well.


Site 1 is now listed at 3025 Bellair Ave


Of note report to committee of adjustment recommended against this due to lack of sewer capacity.
https://london.ca/sites/default/files/2026-02/A-26003%20-%20Planner%27s%20Report%20%28CC%29.pdf


Application Details

Permit / File #
26014791

Property Address
3025 Bellair Ave

Type of Application
Site Plan Applications

Status
Under Review

Application Date
2026-04-28

Date Issued

Occupancy Date
N/A

Date Closed

Description
Site Plan Applications - Site Plan - Administrative - - Amending SPA21-098 to increase Tower 1’s height and increase the total commercial GFA


Of note a minor variance was request to increase the height and increase the sq footage for a grocery store.

Application Details

Permit / File #
26002659

Property Address
3025 Bellair Ave

Type of Application
Minor Variance

Status
Owner to Satisfy Conditions

Application Date
2026-01-20

Date Issued

Occupancy Date
N/A

Date Closed

Description
Minor Variance - Residential - - To permit apartment buildings and an associated Food Store. To permit a Rear Yard Setback of 2.6m to the parking garage stairwell, whereas 20.0m is the minimum required. To permit a Height of 80.0m, whereas 77.0m is the maximum permitted. To permit a Density of 290 units per hectare, whereas 262 units per hectare is the maximum permitted. To permit a Food Store with a Gross Floor Area of 1,500m2, whereas 1,000m2 is the maximum permitted.

Last edited by jammer139; Oct 6, 2026 at 5:40 PM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:59 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.