What’s with the recent construction along I5 near Moda Center? They’ve cleared all vegetation along the highway slopes, and there are construction detours in the area. Almost feels like pre-work for rose quarter freeway construction. But then that isn’t funded, correct?

Best I can find is this:

https://www.oregon.gov/odot/Regions/Documents/WeeklyConstructionUpdate-Jan10-17.pdf

Have they allowed progress to start on early work while waiting on funding for the entire package?
Reply With Quote
     
     
  #562  
Old Posted Jan 15, 2026, 8:50 PM
truebaru truebaru is offline
Registered User
 
Join Date: May 2022
Posts: 27
Quote:
Originally Posted by PhillyPDX View Post
What’s with the recent construction along I5 near Moda Center? They’ve cleared all vegetation along the highway slopes, and there are construction detours in the area. Almost feels like pre-work for rose quarter freeway construction. But then that isn’t funded, correct?

Best I can find is this:

https://www.oregon.gov/odot/Regions/Documents/WeeklyConstructionUpdate-Jan10-17.pdf

Have they allowed progress to start on early work while waiting on funding for the entire package?
They decided to move forward as scheduled even though funding isn't clear:

https://www.opb.org/article/2025/12/11/r...egon-transportation-commission-portland/

I believe this is mostly to prevent burning bridges with Albina Vision Trust, which I think is a good thing.

Another addition is that this was chosen over an alternative that would have prioritized putting the funding towards widening over the highway caps. Another reason I think this is a good thing (relative to alternatives given funding challenges).
Reply With Quote
     
     
  #563  
Old Posted Jan 15, 2026, 11:02 PM
PhillyPDX PhillyPDX is offline
Registered User
 
Join Date: Aug 2022
Posts: 814
Quote:
Originally Posted by truebaru View Post
They decided to move forward as scheduled even though funding isn't clear:

https://www.opb.org/article/2025/12/11/r...egon-transportation-commission-portland/

I believe this is mostly to prevent burning bridges with Albina Vision Trust, which I think is a good thing.

Another addition is that this was chosen over an alternative that would have prioritized putting the funding towards widening over the highway caps. Another reason I think this is a good thing (relative to alternatives given funding challenges).
Oh interesting. Wasn’t tracking any of it was moving forward. The public mindset from the PPS - Tubman middle school perspective of the project is it’s dead in the water.
Reply With Quote
     
     
  #564  
Old Posted Aug 4, 2026, 9:30 PM
truebaru truebaru is offline
Registered User
 
Join Date: May 2022
Posts: 27
Rose quarter cost jumps to $3.6 billion

Oregonian Article

Previous cost estimates were $2 billion. Officials are saying the more funding is limited and the more the project is split into pieces, the more it will cost.

I like this project so I'm sad about this.
Reply With Quote
     
     
  #565  
Old Posted Aug 19, 2026, 12:23 AM
maccoinnich maccoinnich is offline
Moderator
 
Join Date: Jan 2009
Location: Portland
Posts: 8,100
Quote:
Interstate Bridge Replacement Project issues $3.9B RFQ



The multi-billion-dollar Interstate Bridge Replacement issued a request for qualifications for an early phase of the project.

The RFQ, part of the Interstate Bridge Replacement Program, is seeking design-build proposals for a new multi-modal bridge over the Columbia River between Multnomah County and Clark County. The RFQ lists the estimated the value of the work as between $3.3 billion and $3.9 billion.

RFQ documents show the selected party through a progressive design-build contract will handle the design, permitting and construction for "two new multimodal fixed span bridges and approaches for northbound and southbound travelers across the Columbia River."

The project scope also includes a shared-use path and a separate light rail-compatible deck along with the demolition of the existing bridge.
...continues at the Portland Business Journal.
__________________
"Maybe to an architect, they might look suspicious, but to me, they just look like rocks"

https://bsky.app/profile/maccoinnich.bsky.social
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.