Project update (Aug 2026)
The City of Ottawa has received a Site Plan Control revision application to permit the construction of a temporary parking lot on the Phase 2 lands of the Schlegel development where the future “Town Square link” and retirement home will be constructed.
Proposal Details
The subject site is home to The Ottawa Hospital Riverside Campus and the future Schlegel Seniors Village Development. The Schlegel Seniors Village Development was approved on August 4, 2023 (file number D07-12-21-0170). The proposal includes a Long-Term Care Home in Phase 1, and a 15-storey retirement home (270 beds) and Town Square link in Phase 2. Phase 1 is currently under construction. Additionally, two parking lots, approved in July 2025 (file number D07-12-25-0006) are under construction onsite to serve the Ottawa Hospital.
This Site Plan revision application has been submitted to accommodate the construction of a temporary parking lot to the north of The Ottawa Hospital’s Riverside Campus and medical building, south of Smyth Road, west of the VIA Rail Line, and east of the Bus Rapid Transit corridor. The parking lot will include 90 spaces and will be generally located in the footprint of the future Retirement Home and Town Square link.
The Ottawa Hospital has identified the need for additional parking to serve their current needs. The temporary parking lot will help address these needs in the interim and will be removed when construction of the Phase 2 retirement home and town square link commences.
Development application:
https://devapps.ottawa.ca/en/applications/D07-12-26-0074/details
Siteplan: