Quote:
Originally Posted by someone123
It's weird to have so many decades of planning, almost start work 5 years ago, and still not be sure about basic aspects of the project. I wonder if part of the problem is that the city works on the project directly, and Calgary's former mayor is now the opposition leader provincially. Maybe it would be good to take steps to try to de-politicize the system and create some sort of arm's length transit authority, even though it's basically for one municipality.
I don't know about the cost breakdown or how reasonable it is but the $6B or so price tag with cost-sharing in place doesn't seem like a deal breaker given the scale of Calgary (apparently $130B+ GDP) and the run-up in inflation that we have had. Post-covid inflation has contributed to a political environment where sticker shock can be used as an excuse to selectively kill just about any project.
I also think the public and media often don't think correctly about infrastructure costs that should be amortized over decades. A transit tunnel may be used for 50-100+ years, so large dollar figures may make perfect sense. Culturally, we seem to have lost some long-term perspective or vision or a sense of leaving something better for future generations.
|
It's sad how the project got derailed. There were some screwups with the city, and of course with the province as well publicized. Perhaps the biggest wrench in the mix was the tunnel cost, and in a way could be considered the main factor for the delay and political bickering.
Well into the project it was discovered the tunnel would be triple the initial estimate. Calgary has some unique geographical constraints that make tunneling very expensive (why this wasn't discovered earlier IDK), and from there it unraveled. Combined with a big bump in construction costs in general and the budget was long blown.
Even as the Green line is well into construction, the downtown portion is still being debated.
I agree with you 100% though, just spend the money and get it done. If it ends up being elevated I'm okay with that also. I just want the decision done with and things moving on.