Have started forming for the 7th floor slab on the east end.
Reply With Quote
     
     
  #62  
Old Posted Jul 13, 2026, 4:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,211
Some of the 7th floor walls and posts are now poured.
Reply With Quote
     
     
  #63  
Old Posted Jul 23, 2026, 12:50 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,211
Forming for the 8th floor slab is moving along on the east side. The 2s common area fronting Richmond St now has steel installed.
Reply With Quote
     
     
  #64  
Old Posted Jul 30, 2026, 7:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,211
Looks like they have started pouring the 8th floor concrete slab on the east end. Should see 8th floor wall and post forming starting next week.
Reply With Quote
     
     
  #65  
Old Posted Aug 9, 2026, 5:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,211
Forming and pouring of the 8th floor and walls and posts progressing now on the east side. Masonry contractor has started installing the faux stone starter course on the west end of this 8s building.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:26 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.