  #3421  
Old Posted Jul 17, 2026, 11:42 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
We're starting to see subway systems like NYC and Toronto flood at times and they seem to recover pretty quickly. I imagine it will be the same here.
Reply With Quote
     
     
  #3422  
Old Posted Jul 17, 2026, 1:03 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,479
They are installing trees at Moodie Station.

Any news on when testing will start?
Reply With Quote
     
     
  #3423  
Old Posted Jul 17, 2026, 1:19 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by VANRIDERFAN View Post
They are installing trees at Moodie Station.

Any news on when testing will start?
There were trains moving around Moodie last fall before the LRV bearing issues came up, not much seems to have happened since then.
Reply With Quote
     
     
  #3424  
Old Posted Jul 18, 2026, 2:13 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,601
Flood damage likely to delay west LRT extension, transit chair says
Canada Day storm damaged tracks and cabling, Glen Gower says

Andrew Foote · CBC News
Posted: Jul 17, 2026 2:42 PM EDT | Last Updated: 7 hours ago




Damage from the July 1 floods will likely further delay the opening of the city's western light rail extension, according to the chair of Ottawa's transit committee.

Ottawa was hit by severe thunderstorms on Canada Day that dropped nearly 167 millimetres of rain over about five hours on areas west of downtown.

The construction project to extend the O-Train to Moodie Drive and Algonquin College is among the damaged infrastructure, with its tracks running through some of the hardest-hit areas.

Tracks and cabling have been damaged, transit committee chair and Stittsville Coun. Glen Gower said Friday, adding that how long that might delay the west extension's opening won't be known for months.

"We were looking at a late 2027 launch," he told CBC Radio's Ottawa Morning. "I think it's fairly certain we're going to see that delayed by a few more months but we don't know exactly what the damage was yet."

Ottawa's Transit Services general manager Rick Leary on Wednesday said contractors are still investigating the storm damage to the extension and what it will take to repair it.

"This is going to take some time to complete, as all affected aspects of the west extension construction project must be carefully inspected," he said.

Five stations along the future Line 3 to Moodie station are impacted, he said: Sherbourne, New Orchard, Queensview, Pinecrest and Moodie itself, plus the the Kichi Zībī Mīkan tunnel near Westboro Beach.

Preliminary information from the Moodie station area is that floodwaters had a significant impact, Leary said.

Video shared with CBC News from the afternoon of July 1 shows several centimetres of water flowing over train tracks in the Moodie station area.

The city presentation also showed an unspecified section of track under several centimetres of standing water.

https://www.cbc.ca/news/canada/ottawa/ottawa-oc-transpo-west-extension-lrt-flood-9.7274267
Reply With Quote
     
     
  #3425  
Old Posted Jul 18, 2026, 5:51 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 28,939
They got the excuse they needed. I hope they use the time well.
Reply With Quote
     
     
  #3426  
Old Posted Jul 19, 2026, 1:07 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is online now
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,667
Quote:
Originally Posted by J.OT13 View Post
We're starting to see subway systems like NYC and Toronto flood at times and they seem to recover pretty quickly. I imagine it will be the same here.
You're a funny guy.

https://www.youtube.com/watch?v=Pfcy15ZUE2c
__________________
I don't understand how communism works.
Reply With Quote
     
     
  #3427  
Old Posted Jul 19, 2026, 4:38 AM
golfguy9 golfguy9 is offline
Registered User
 
Join Date: Sep 2025
Posts: 69
Quote:
Originally Posted by Truenorth00 View Post
They got the excuse they needed. I hope they use the time well.
Yup. That article quoted late 2027 as the opening date before this storm. What a joke - walk by any section or station and you would probably predict it could open in a few months if they actually put their foot to the floor and cared. But no, I have to stare at 95% complete Dominion station on my walk to Westboro Beach every night.
Reply With Quote
     
     
  #3428  
Old Posted Jul 19, 2026, 2:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
With the train and staffing shortage, OC probably won't have the necessary resources to launch Stage 2 West for at least two years anyway.
Reply With Quote
     
     
  #3429  
Old Posted Jul 21, 2026, 4:07 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
Lincoln Fields pedestrian bridge closure

On Monday, July 20, 2026, the pedestrian bridge at Lincoln Fields Station between platforms 1A / 1B and 2A will be permanently closed.

Riders can still access all bus platforms from ground-level walkways and crossings.

Updated signage will be installed throughout the station. There will be no changes to:
  • Bus stop locations
  • Bus stop assignments
  • Bus routes in or around the station
  • Station entrances or exits



https://ottawa.skyrisecities.com/forum/threads/o-train-east-west-line-1-line-3.37778/page-9
Reply With Quote
     
     
  #3430  
Old Posted Aug 5, 2026, 2:10 AM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 313
Today, LRV1117 made the first trip from Kichi Zibi, all the way to Algonquin Station. This marks a major milestone and achievement on the West extension. This LRV will next begin testing all systems and components on the alignment. Congratulations to all the teams involved today.

https://www.railfans.ca/news/first-train...station-on-the-o-train-western-extension

__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #3431  
Old Posted Aug 5, 2026, 4:00 PM
golfguy9 golfguy9 is offline
Registered User
 
Join Date: Sep 2025
Posts: 69
I can't believe they have now ran trains under their own power on the full length and we're still 18 months away from opening the system.

I've worked on some large construction projects in my career (nothing as big this), but it's insane to see the mismanagement on this one.
Reply With Quote
     
     
  #3432  
Old Posted Aug 5, 2026, 7:21 PM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 298
"I think it's fairly certain we're going to see that delayed by a few more months but we don't know exactly what the damage was yet."


From the above article.

So we should extrapolate that, in the future if we have such a storm again, the LRT will be shut down West of Bayshore for "a few months"?
Reply With Quote
     
     
  #3433  
Old Posted Aug 6, 2026, 1:21 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,621
Quote:
Originally Posted by sseguin View Post
Today, LRV1117 made the first trip from Kichi Zibi, all the way to Algonquin Station. This marks a major milestone and achievement on the West extension. This LRV will next begin testing all systems and components on the alignment. Congratulations to all the teams involved today.

https://www.railfans.ca/news/first-train...station-on-the-o-train-western-extension

Super frustrated with the delays in this project but any progress is exciting! Love to see the trains zipping in and out of all of those tunnels and stations. Won't be long now...
Reply With Quote
     
     
  #3434  
Old Posted Aug 6, 2026, 2:51 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 313
FIRST TRAIN to Algonquin Station! O-Train Stage 2 West Makes History

A historic milestone for Ottawa’s O-Train!

On August 4, 2026, LRV 1117 became the first train to travel from Kichi Zibi to Algonquin Station, making the historic first journey along the O-Train Stage 2 West Extension.

The train travelled west beyond Tunney’s Pasture for the first time, continuing all the way to the future Algonquin Station. This marks a major milestone in the construction, testing and commissioning of the Stage 2 West extension.

The train will now begin more extensive testing and assist with the verification of systems and components throughout the new alignment as work continues toward opening the extension to passengers.

Congratulations to all of the teams who helped make this historic first journey possible!

📍 O-Train Stage 2 West Extension
🚆 Train: LRV 1117
📅 Date: August 4, 2026
📍 Route: Kichi Zibi → Algonquin Station

Video Link
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #3435  
Old Posted Aug 6, 2026, 3:38 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,621
Amazingly detailed content, thank you for all of your work on this!

I hope with all of the lessons learned on Line 1 that major dramas will be less likely with the east and west extensions....
Reply With Quote
     
     
  #3436  
Old Posted Aug 6, 2026, 5:23 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,055
I've heard worse ideas. Just please let me take the subway to Westboro Beach in 2027!
OC Transpo considering partial opening of O-Train west extension due to flooding damage on Canada Day
Ted Raymond and Leah Larocque
Updated: August 05, 2026 at 5:28PM EDT
Published: August 05, 2026 at 4:52PM EDT

The major flooding on Canada Day that hammered Ottawa’s west end could mean only part of the western extension of the O-Train would open at first, a transit executive says.

The storm on July 1 brought more than 100 millimetres of rain to the city, with some areas in the west end reportedly receiving 150 mm or more. The storm caused significant flooding at several O-Train stations under construction in the west end between New Orchard Station and Moodie Station.

Speaking to CTV News Ottawa’s Leah Larocque on Wednesday, director of rail construction Richard Holder said OC Transpo and the constructor, KEV, continue to assess the damage caused by the storm and are considering options for the line, which is currently slated to open sometime in 2027.

...
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #3437  
Old Posted Aug 6, 2026, 6:10 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
The first test train on the eastern extension to Trim was on February 26, 2024. That’s 30 months ago and counting. So sometime in 2029 for the western extension to open?
Reply With Quote
     
     
  #3438  
Old Posted Aug 6, 2026, 10:16 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,786
CTV News has just had a news story about the damage caused at Moodie Station by the July 1st storm. It included video clips of the flooding at the station. The story will likely be posted later this evening

Here it is.

Video Link

Last edited by lrt's friend; Aug 7, 2026 at 1:13 AM.
Reply With Quote
     
     
  #3439  
Old Posted Aug 7, 2026, 1:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,869
Quote:
Originally Posted by Kitchissippi View Post
The first test train on the eastern extension to Trim was on February 26, 2024. That’s 30 months ago and counting. So sometime in 2029 for the western extension to open?
Keep in mind that at least 5 months of that was OC Transpo not having enough trains for testing... which could very well plagued Stage 2 West.
Reply With Quote
     
     
  #3440  
Old Posted Aug 7, 2026, 1:44 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,627
The CTV NEWS article by Leah Laroque is interesting for some of the remarks in it:
https://www.ctvnews.ca/ottawa/article/we...bus-service-after-moodie-station-damage/

Quote:
The city has said the extent of the damage is still being assessed, with some evaluations expected to continue into 2027.
From what I am reading in that article, and from other sources, the evaluation of the damage will be reported back to City Council in EARLY 2027. I hope that this is simply confusion between when the damage assessment report is available and when the independent consultant will table a report on the remaining time line for the western extension, including ways to minimize further delays.

Reality check: There were two washed-out sections of the Beachburg Sub, due to the heavy rain on July 1, 2026. Both of them very near the Corkstown Yard Light Maintenance and Storage Facility. By the time I was there two days later, they had been back-filled with ballast, and I believe I heard the train go through the following Wednesday. Granted, this is an old rail line, without fancy signaling or an overhead catenary system – but still. Those tracks were back in action very quickly.

Flooding of the Line 1 and Line 3 rail beds by slow-moving water for a fairly brief period should not be a major issue. If it happens repeatedly, there could be an increased chance of settling of the track bed, but that will, generally, be a slower process and found (and corrected) through routine maintenance. Immersion in slow-moving water should not adversely affect any signal or communication cable, as it should all be suitable for wet locations – again, assuming that they are not submerged for an extended period of time.

Fast-moving water on the tracks is the big problem. As we see at the Corkstown Yard, this is what causes washouts that displace the track ballast. It can also displace signal and communication cables – again, as happened at the Corkstown Yard.

Therefore, the vast majority of the western extension should require very little re-evaluation. The short length of track leading into the Corkstown Yard will need to be carefully assessed. However, it should not take six months to restore that short length of track and signaling.

That said, I could take that long if there is a redesign being done. And I hope that there is. I think that there needs to be much better handling of stormwater flow. The branch of Stillwater Creek that pass through the center of the facility needs to be better managed by allowing a much higher flow under Corkstown Road. That is, the culvert under the 417 should remain the same, but a wider (or second, parallel) culvert be installed under Corkstown Road. Also, the stormwater flowing from the 417 and its on-ramp near Moodie Drive must be channeled under the tracks and Corkstown Road, so that it can join Stillwater Creek in a managed way. I have posted my idea for that before.

Although these simple improvements will handle most stormwater, there will be exceptional storms that overwhelm the system. In order to prevent the kind of damage that occurred on July 1, I would suggest that the sloped track have a concrete base. That base should include a depressed trough along the south side (to act as a ditch to guide most water down the hill and not across the tracks) and a slightly raised duct along the north side for signal/communication cables. This only needs to be installed on the slope – where the water is fast-moving. Stormwater on the adjacent flat sections of the track should not be harmed much if they become temporarily submerged.

It’s funny how hind-sight is 20/20. I advocated for OC Transpo to move some Light Rail Vehicles (LRVs) to the Corkstown Yard so that they could be used for testing the western extension. I reasoned that the Parkway Tunnel would delay LRVs from getting to the newly laid western track. It turns out, that the LRVs at the Corkstown Yard are trapped there, and an LRV was recently brought through the tunnel to do the testing.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.