  #181  
Old Posted Jun 3, 2026, 12:44 AM
Spoofy Spoofy is offline
Registered User
 
Join Date: May 2016
Posts: 131
Really unfortunate that the east facade of the shorter building was left completely blank.
Reply With Quote
     
     
  #182  
Old Posted Jun 3, 2026, 1:29 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,329
^very drewlowish of them.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #183  
Old Posted Jun 3, 2026, 1:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,235
Kind of makes sense because immediately east of the east wall is a natural gas pump and distribution facility with lots of above ground pipes and equipment. Who would want to look out over that? From ground level the fencing hides most of the pipes and equipment.
Reply With Quote
     
     
  #184  
Old Posted Jun 15, 2026, 5:30 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,754
The crane is coming down today on the shorter Yorkville tower.
Reply With Quote
     
     
  #185  
Old Posted Jun 16, 2026, 11:32 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,235
York wasting no time removing that tower crane. Exterior and interior finishing well underway now will likely see first tenants by end of the summer for this 12s building.
Reply With Quote
     
     
  #186  
Old Posted Jun 16, 2026, 2:59 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,275
Yep, I mentioned a month ago they said September was the plan.
Reply With Quote
     
     
  #187  
Old Posted Jun 19, 2026, 5:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,235
Concrete finishing crews already working on the exterior paint on the 12s building. Forming has started for 2nd floor slab on the north building and alot of progress forming and pouring the ground floor posts on the south building. Forming has started on the ground floor slab on the south side of south building. The Site 1 project has two towers above a large podium base on the SE corner of Southdale and Bostwick.
Reply With Quote
     
     
  #188  
Old Posted Aug 2, 2026, 9:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,235
Work continues on exterior concrete finishing and painting of the 12s building. Forming ground floor walls and posts continues on the Site 1 buildings podium base. Still working on the L1 floor slab forming for the underground parking on the SE corner of the pit
Reply With Quote
     
     
  #189  
Old Posted Aug 17, 2026, 4:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,235
York now has a webpage up for their new 12s apartment building which they are calling Celine.


Renting now for first tenants.


https://liveatceline.ca/


The exterior concrete finishing and painting is moving along quickly. Landscaping prep is also started.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 4:18 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.