[Halifax] The Revalie on Coburg (6233/6259/6319 Coburg) | ? M | 11-7-7 FL | U/C

Construction is starting along Coburg Road on three separate buildings. All three are being built by PCL Construction, are owned by Woodbourne, and will contain a total of 322 units of student housing.




HalifaxDevelopments.ca (Photos by David Jackson)

Last edited by Dmajackson; Sep 15, 2026 at 11:39 PM.
Reply With Quote
     
     
  #2  
Old Posted Jul 15, 2026, 10:12 AM
mleblanc mleblanc is offline
Registered User
 
Join Date: Dec 2015
Posts: 572
Reply With Quote
     
     
  #3  
Old Posted Jul 21, 2026, 12:22 AM
worldlyhaligonian worldlyhaligonian is offline
Registered User
 
Join Date: Jun 2006
Posts: 4,048
Like many developments, the materials will dictate the end product.
Reply With Quote
     
     
  #4  
Old Posted Sep 15, 2026, 11:43 PM
Dmajackson's Avatar
Dmajackson Dmajackson is online now
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,966
I've updated the first post with scans of the project information signage.


HalifaxDevelopments.ca (Photo by David Jackson)
Reply With Quote
     
     
  #5  
Old Posted Sep 17, 2026, 11:21 PM
Dmajackson's Avatar
Dmajackson Dmajackson is online now
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,966
6233 Coburg Road CMP

6259 Coburg Road CMP

6319 Coburg Road CMP

I had a read through and the big takeaways are;

- Mass Timber Construction
- No mention of parking being included
- Tower crane at Site B, mobile crane on Lilac Street for Site A.
- 1 basement floor in each building not covering the full lots though
- Walnut Street & Lilac Street will be closed to all traffic
- Scaffolding will be installed over the Coburg sidewalk
- Expected end of encroachment is August 2028.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 1:52 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.