6233 Coburg Road CMP
6259 Coburg Road CMP
6319 Coburg Road CMP
I had a read through and the big takeaways are;
- Mass Timber Construction
- No mention of parking being included
- Tower crane at Site B, mobile crane on Lilac Street for Site A.
- 1 basement floor in each building not covering the full lots though
- Walnut Street & Lilac Street will be closed to all traffic
- Scaffolding will be installed over the Coburg sidewalk
- Expected end of encroachment is August 2028.