I've posted about some of these points before, but I will post them again if it's helpful. I appreciate the issues with data centres, but someone needs to explain things sensibly, not dramatically, as you'll see elsewhere.
They've chosen Lorneville for several reasons. From my understanding, it is for the availability of power, gas, water, network infrastructure, and workforce.
- The location is very close to existing power infrastructure coming up from Colson Cove and Lepreau, and the cost to connect will be minimal.
- There is a natural gas line close by that they can connect to in order to power their natural gas power plant.
- There is a municipal water supply available close by with sufficient capacity, reasonable cost, and a supplier with experience working with large industrial customers.
- There is serious network infrastructure nearby, originally put in place by NBTel, that they can utilize to send data/information south or west.
- While Saint John isn't a huge city, it has a strong industrial base and a technology workforce, which should be able to build and sustain the facility.
Is it possible to build this data centre elsewhere in NB or the Maritimes? Sure, but if it were easier or cheaper, they would have chosen those locations. They aren't choosing Saint John out of the goodness of their heart (or spite, depending on which way you see it); it's because it makes the most sense financially and can be done in a short time frame.
As for benefits for the city, it's not going to be a huge employer, although they claim 200 jobs and a much larger number during construction. There'll be some downstream jobs elsewhere to supply their power and other infrastructure, etc.
The benefit that is often ignored is taxes. Assuming the city or the province don't pull any Irving-style BS tax breaks, this could generate about $6-7M annually for the city, which is serious money. That's double the pulp mill and more than the refinery.
If you said to folks in the city, we'll cut your property taxes by 5% if we can build this, I think many could be persuaded. Saint John still has the highest property taxes in the province and a long way to go to meet Fredericton/Moncton. However, from my perspective, I'd prefer they use the cash to boost services. A few million dollars could go a long way for the city's parks, roads, or snow clearing. You could fix up every park in the city to a great standard in a few years.
Quote:
Originally Posted by Titan2030**
I wonder if they have considered other areas of NB for this data center project ? Maybe with the New Power plant going into Tantramar and a New unused 200 acre industrial park located near by in a white color area such as this, that could be something else to get the green folks stirred up. The general area is home to over 200,000 people being nearby to Moncton and central to the maritime region.
|
The trouble with putting this close to Tantramar is that the new gas plant there is designed to be a peaker plant, not continuous generation. It picks up during cold snaps or during outages/downtime elsewhere in the province. There is already poor generation in that region of the province, and putting more strain there would be unwise, especially with the rising population of the Moncton metro area. The only way you could make it work is by running the plant far more than planned, and then it's not really a peaker plant, is it?
There is access to gas, and a workforce nearby in Moncton; I am less sure about water supply in that region or network infrastructure. I'd have to do some research.
Quote:
Originally Posted by EnvisionSaintJohn
Allowing “backup” natural gas generators to run on a near permanent basis just seems like a bad precedent to set with this expansion and first major development for the industrial park. The whole industrial park may end up being 10,000+ acres one day, which is plenty of room for major wind, solar, and battery storage projects throughout the park and adjacent areas.
|
As the previous user said, these aren't backup generators. They've included these in the design because there isn't enough slack on the electrical grid to meet all their power needs from it, so they are splitting it 50/50 between self-generation and grid power. Does this mean it will cause a bunch of CO2 generation? Absolutely! Is it worth it? That's up for debate. Without more nuclear baseload or huge battery systems that are not yet proven at scale, we can't rely on wind or solar for projects like this, so there isn't another option except not to build them at all. Or more likely, build them in a jurisdiction that will happily take their investment and tax dollars.