HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


Reply

 
Thread Tools Display Modes
     
     
  #81  
Old Posted Jul 8, 2026, 6:20 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Closeted Normie
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 13,023
I'm glad I'm not the structural engineer.
__________________
Everything new is old again

Sic semper tyrannis
Reply With Quote
     
     
  #82  
Old Posted Jul 8, 2026, 6:53 PM
HappyCapSlapper HappyCapSlapper is offline
Registered User
 
Join Date: Nov 2025
Posts: 34
Quote:
Originally Posted by busy bee View Post
i'm glad i'm not the structural engineer.
r.i.p. GACE
Reply With Quote
     
     
  #83  
Old Posted Jul 8, 2026, 7:13 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Closeted Normie
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 13,023
Definitely bad advertising
__________________
Everything new is old again

Sic semper tyrannis
Reply With Quote
     
     
  #84  
Old Posted Jul 9, 2026, 12:12 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 56,909
https://www.bloomberg.com/news/articles/...floors-after-buckling-in-pfizer-building

Damaged Manhattan Tower Owner to Reconstruct 15 Floors After Evacuation


By Natalie Wong, Nacha Cattan, and Kriston Capps
July 8, 2026


Quote:
The developer behind the Midtown Manhattan tower that was evacuated over structural concerns Tuesday says it has a plan to fix the issue, including reconstructing 15 floors that were added to the original building as part of its conversion into apartments.

The height of the tower’s 21st floor, which is taller than others at 235 East 42nd St., made two columns more susceptible to load, said Nathan Berman, chief executive officer of developer Metro Loft. Those columns weren’t sufficiently reinforced, leading them to bend and causing some of the 15 cantilevered floors above to sag.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #85  
Old Posted Jul 9, 2026, 12:45 AM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Closeted Normie
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 13,023
I think this developer is seriously underestimating how this incident will make toxic the impression the building has on potential future tenants. No way in hell I'd move into that building.
__________________
Everything new is old again

Sic semper tyrannis
Reply With Quote
     
     
  #86  
Old Posted Jul 9, 2026, 3:55 AM
Hudson11's Avatar
Hudson11 Hudson11 is offline
Registered User
 
Join Date: Aug 2011
Posts: 2,172
They could have a modicum of success if they use two different names for each tower. The Pfizer building might not be so popular and that is where the majority of apartments will be, but they did build 11 or more stories on the other property, and that tower, despite the connection, has no apparent trouble.
__________________
click here too see hunser's list of the many supertall skyscrapers of New York City!
Reply With Quote
     
     
  #87  
Old Posted Jul 9, 2026, 1:38 PM
DCReid DCReid is offline
Registered User
 
Join Date: Jun 2012
Posts: 1,525
One Project's Buckling Beams And Sagging Floors Rattle NYC's 19M SF Conversion Pipeli

The buckling of two support columns at the former Pfizer headquarters in Midtown Manhattan on Tuesday morning rattled more than the nation's largest office-to-residential project. It jolted a real estate industry that has been looking to the building as a bellwether for the city’s conversion boom...

Martin added that lenders could be more hesitant to finance these projects and insurance rates could rise following the national news coverage the incident has received...

Martin highlighted that the situation is uncommon — most conversions don’t involve major additions. He also expressed concern that Tuesday's incident may result in unnecessary mandates and additional costs, whether that be by lawmakers, lenders or insurance providers...

https://www.bisnow.com/new-york/news/ada...ffice-to-resi-conversion-reaction-135350
Reply With Quote
     
     
  #88  
Old Posted Jul 9, 2026, 7:47 PM
mrnyc mrnyc is online now
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 15,340
10min of a structural engineer showing you the estimated weight loads -- scary stuff

Video Link
Reply With Quote
     
     
  #89  
Old Posted Jul 10, 2026, 10:27 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 56,909
https://www.dezeen.com/2026/07/10/metroloft-midtown-building-stable-news/

Collapsing building in New York City "now stable" according to developer





Ellen Eberhardt


Quote:
Developer Metro Loft said that "at no time was the building, or any portion of it, at risk of collapse" in a statement following crew evacuations from a large office-to-residential project in Midtown Manhattan earlier this week, when portions of the interior started to crumble.

"We have been working closely with the Department of Buildings to rectify the situation," said Metro Loft. "Our team worked through the night stabilizing the affected columns, and the DOB has confirmed the structure is now stable."

"While we understand this has drawn significant attention, we want to be clear: this involves a small fraction of the building, and we are already in the process of resolving it. Reports of risk of a collapse were and are inaccurate."

As of Friday, New York City's Department of Buildings (DOB) shared an image of the installed shoring supports next to a cracked column.
Quote:
"This is a localized situation affecting less than 30 apartments out of over 1,600. At no time was the building, or any portion of it, at risk of collapse," said Metro Loft. "We are in the process of addressing the issue and will fully rebuild this portion of the building in tandem with ongoing construction."

"We remain on schedule, and this work will not delay delivery of the building as it is such a small portion of the project. We are working around the clock so that operations can resume and life in the area can return to normal."
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 12:10 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.