HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Jul 9, 2026, 7:41 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,282
Roofs are installed on both townhouse units. Windows and Doors are installed. The west side block is already getting the exterior siding installed.
Reply With Quote
     
     
  #22  
Old Posted Aug 2, 2026, 8:01 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,282
Exterior siding and brick work completed on the west side block of townhouses. The east block appears to be done with exterior brick installation and nearly done with siding as well.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 5:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.