HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #81  
Old Posted May 4, 2026, 7:57 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 495
Thanks!
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #82  
Old Posted May 29, 2026, 1:21 AM
MFRH Pics MFRH Pics is offline
Registered User
 
Join Date: Jan 2024
Location: Maple Ridge
Posts: 103
Closer to being finished

I drove the entire length today. Everything is looking almost complete except for that final construction spot at the western end in Whonnock (272nd).
Jersey barriers have been installed. There is still one lane each way and the lane lines have not been painted yet, but it's getting close.

I'm undecided to toss the drone in the air this Sunday or wait till June 7th. I'll see how it looks Saturday and decide then. Can't wait for the puppy to be finished.
Reply With Quote
     
     
  #83  
Old Posted May 30, 2026, 1:15 AM
MFRH Pics MFRH Pics is offline
Registered User
 
Join Date: Jan 2024
Location: Maple Ridge
Posts: 103
4-lanes open

2 lanes each way the full length, except for the section at 272nd. No lines painted yet.
Reply With Quote
     
     
  #84  
Old Posted May 30, 2026, 3:29 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 495
Quote:
Originally Posted by MFRH Pics View Post
2 lanes each way the full length, except for the section at 272nd. No lines painted yet.
Great to hear!
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #85  
Old Posted May 31, 2026, 7:44 PM
MFRH Pics MFRH Pics is offline
Registered User
 
Join Date: Jan 2024
Location: Maple Ridge
Posts: 103
Highway 7 Eastbound & Westbound May 31-2026 - Drone

Reply With Quote
     
     
  #86  
Old Posted Jul 1, 2026, 3:30 PM
MFRH Pics MFRH Pics is offline
Registered User
 
Join Date: Jan 2024
Location: Maple Ridge
Posts: 103
4-lanes open end-to-end

Lougheed is now 4-lanes from Vancouver to Mission.

There's still some Jersey Barriers to be installed and lines to be painted at the western end in Whonnock. If they complete these by Friday or Saturday (Jul 3 or 4), I'll toss the drone in the air this coming Sunday for a final set of videos. If not done then, I'll do it on Jul 12th.
Reply With Quote
     
     
  #87  
Old Posted Jul 1, 2026, 4:06 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,385
Quote:
Originally Posted by MFRH Pics View Post
Lougheed is now 4-lanes from Vancouver to Mission.

There's still some Jersey Barriers to be installed and lines to be painted at the western end in Whonnock. If they complete these by Friday or Saturday (Jul 3 or 4), I'll toss the drone in the air this coming Sunday for a final set of videos. If not done then, I'll do it on Jul 12th.
Thanks for all the work on this thread and on the highway one thread!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #88  
Old Posted Jul 1, 2026, 4:51 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,772
Quote:
Originally Posted by MFRH Pics View Post
Lougheed is now 4-lanes from Vancouver to Mission.
At last!

Quote:
Originally Posted by hollywoodnorth View Post
Thanks for all the work on this thread and on the highway one thread!
Seconded!

Quote:
Originally Posted by MFRH Pics View Post
I'll toss the drone in the air this coming Sunday...
Be sure to catch it on the way back down!
Reply With Quote
     
     
  #89  
Old Posted Jul 1, 2026, 5:18 PM
MFRH Pics MFRH Pics is offline
Registered User
 
Join Date: Jan 2024
Location: Maple Ridge
Posts: 103
Be sure to catch it on the way back down![/QUOTE]


LOL. I'll try!
Reply With Quote
     
     
  #90  
Old Posted Jul 1, 2026, 10:37 PM
JYVR JYVR is offline
Registered User
 
Join Date: May 2024
Posts: 5
Quote:
Originally Posted by MFRH Pics View Post
Lougheed is now 4-lanes from Vancouver to Mission.

There's still some Jersey Barriers to be installed and lines to be painted at the western end in Whonnock. If they complete these by Friday or Saturday (Jul 3 or 4), I'll toss the drone in the air this coming Sunday for a final set of videos. If not done then, I'll do it on Jul 12th.
Thanks for making all the progress videos. Having grown up in that area it's great to see the final segment finish.

I'm old enough to remember when they first widened 240th to 266th. Next I recall they built the new bridge over the Stave, eventually closed the original truss bridge, then widened 287-Silverdale with the 4 lanes over Stave River. Later they did Nelson to Oliver, then finally Nelson to Silverdale, and now finally the last segment 287-272.

I think that whole timeline took some 35ish years.
Reply With Quote
     
     
  #91  
Old Posted Jul 5, 2026, 12:32 AM
Dave2 Dave2 is offline
Registered User
 
Join Date: Dec 2007
Posts: 540
Four lanes to Mission? Well, at least we know the “when” now, Phil.

Vancouver Sun, April 21 1962. Not sure where this “2800 foot tunnel” was. That’s 0.85 kilometres.

Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:00 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.