Big concrete pour today with two concrete pump trucks and parade of cement trucks pouring the SE corner floating raft slab section for this 31s building.
Last edited by jammer139; Jun 27, 2026 at 5:21 PM.
They have dug out a lot of the dirt ramp along the west wall of the pit. The smaller excavator is now at the bottom while the larger one is outside the pit. Steel rebar for some of the L2 walls and posts as started on the east side of the pit on top of the new section of floating raft slab.
Nearly done digging out the dirt access ramp along the west wall of pit. Large excavator has been removed leaving the small one at the bottom. They will use the crane to lift it out when ready. Have poured some concrete to seal the floor already in the NW corner of pit bottom. Will likely remove the small excavator and finish up the SW corner concrete seal soon. Forming for the floating raft slab on the west end of pit to follow. Have already poured some of the L2 posts on the east side of pit and working on more forming of L2 posts and walls.
Forming and steel rebar getting setup for another section of floating raft slab on the west end of the now cleared pit. The small excavator has now been lifted out of the pit. They are also setting another tower crane base on the new section of future floating raft slab so this build will use two tower cranes.