  #341  
Old Posted Apr 3, 2026, 7:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,970
Caisson drilling rig has now completed installing the pilings around the site and been removed. Shoring is almost done as well. They have started delivering parts of the tower crane to the work site so it will likely be assembled in the coming weeks.
Reply With Quote
     
     
  #342  
Old Posted May 23, 2026, 4:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,970
Still working at the bottom of the pit for this 9s building. Additional segments of a tower crane have been delivered to the site but have not been installed.
Reply With Quote
     
     
  #343  
Old Posted May 28, 2026, 8:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,970
Heavy lift mobile crane has been assembled and they have now setup the tower sections for the tower crane. Tomorrow should see the tower crane boom installed.
Reply With Quote
     
     
  #344  
Old Posted May 29, 2026, 12:01 AM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 37
Any renderings for what this building will look like?
Reply With Quote
     
     
  #345  
Old Posted May 29, 2026, 11:44 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,970
Not that I have seen yet. Just the site plan which shows a T shaped 9s building.

Quote:
Originally Posted by CharlesSaticoy View Post
Any renderings for what this building will look like?
Reply With Quote
     
     
  #346  
Old Posted Jun 19, 2026, 9:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,970
Doing a big concrete pour for the new 9s building. Concrete pump truck and parade of cement trucks on site today. Likely pouring a section for floating raft slab today as they work on the foundation and underground levels. It appears from the depth of the pit they will have a 2 level parking garage under this 9s building.

Last edited by jammer139; Jun 20, 2026 at 1:04 PM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:23 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.