  #321  
Old Posted Sep 20, 2025, 6:58 PM
CharlesSaticoy CharlesSaticoy is offline
Registered User
 
Join Date: May 2022
Posts: 37
Are there excess spots in this lot for current building?
Reply With Quote
     
     
  #322  
Old Posted Sep 20, 2025, 7:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
I suspect the addition of 3 lower levels still doesn't get them to a 1 to 1 ratio of parking spaces to units in the 25s tower. Considering some tenants may not own a vehicle that will probably work out. Also they likely need to have visitor parking spaces which will probably be on the surface. I wonder if they will wire up the 3 levels of underground parking for EV charging and at what ratio. Not sure if the Ontario building code has been updated yet to require EV charging in new build buildings and what ratio to units would be required? The current vacancy rate in this building is huge and they need to address the parking ASAP.
Reply With Quote
     
     
  #323  
Old Posted Sep 25, 2025, 11:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Have now got forming for the stairwell roof up. Forming for the parking ramp entrance cross beam has also started. They are backfilling the east side L1 walls to bring it up to grade with the remaining surface parking lot. The tower crane will likely be removed soon.

Last edited by jammer139; Sep 26, 2025 at 6:14 PM.
Reply With Quote
     
     
  #324  
Old Posted Sep 29, 2025, 7:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Wasting no time with the removal of the tower crane today.
Reply With Quote
     
     
  #325  
Old Posted Oct 12, 2025, 4:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Have started parking cars on the ground level of the garage. Have removed the old pavement on the east side and prepping to repave it.
Reply With Quote
     
     
  #326  
Old Posted Oct 20, 2025, 9:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
They have now poured the concrete curbing for the east side surface parking lot. Should see grading and pavement very soon. I'd be surprised to see a tower built on the east side any time soon. Maybe in the 2030's.
Reply With Quote
     
     
  #327  
Old Posted Oct 31, 2025, 6:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
They have now installed the parking garage doors and have the concrete bases for the light poles poured. Should see the lights installed soon and the pavement on the east side surface lot.
Reply With Quote
     
     
  #328  
Old Posted Nov 28, 2025, 4:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Paving contractor installing asphalt on top of the new parking garage today. Still alot of cars parked on the dirt base of the east side of the lot. Imagine they want to get the pavement on top of the parking garage so the cars can move over and the east side can be paved ASAP.
Reply With Quote
     
     
  #329  
Old Posted Dec 5, 2025, 7:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Pavement now completed including the east side surface lot. I'd be very surprised to see any proposal on the east side surface lot for many years. Now that they have parking it will also be interesting to see vacancy rate on the 25s tower moving ahead.
Reply With Quote
     
     
  #330  
Old Posted May 11, 2026, 7:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Ayerswood Developments has updated the website for this building called Clarence Square. Offering underground and surface parking spaces plus gym room and choice of 1,2 and 3 bedroom units.


https://www.195dundas.com/
Reply With Quote
     
     
  #331  
Old Posted Jun 17, 2026, 4:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Final black paint touch ups on the wrought iron fencing around the refreshed surface parking lot. New landscaping installed and paint on the entrance to the new 3 level parking garage.


It's unlikely we will see another tower be built on the east side of the parking area for many many years to come.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:39 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.