Have now got forming for the stairwell roof up. Forming for the parking ramp entrance cross beam has also started. They are backfilling the east side L1 walls to bring it up to grade with the remaining surface parking lot. The tower crane will likely be removed soon.
Last edited by jammer139; Sep 26, 2025 at 6:14 PM.
|