Quote:
Originally Posted by The ATX
Is this schedule still holding?
|
I don't know the concrete answer to this, but I'd be very surprised if they couldn't stick with this schedule.
The progress on this has been significantly slower than the Waterline and Paseo, and it seems like they've been sitting at "95-98% complete" for several months now. I have to imagine that this was an intentional business move, since opening up any time before then would mean incoming residents of their shiny new building are surrounded on all sides by active construction at the Waterline, Paseo, and the MACC (not to mention Waller creek, the convention center, and I-35...).
I think the timeline for a lot of Rainey street projects pretty much boils down to "3-4 months from now, ideally by the end of the year."