Have started installing the 2nd floor precast concrete walls and posts.
Reply With Quote
     
     
  #62  
Old Posted Mar 3, 2026, 7:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Have started installing the 3rd floor precast concrete floor slabs.
Reply With Quote
     
     
  #63  
Old Posted Mar 27, 2026, 3:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Working now on the 3rd floor precast wall and post installations which when complete will wrap up the podium base of this building.
Reply With Quote
     
     
  #64  
Old Posted Apr 30, 2026, 11:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Tricar has put up a webpage for this building which they are calling The Mayfair Wortley Village. The webpage has an updated render.

https://www.tricar.com/locations/the-mayfair/

Appear to now be installing the 4th floor precast concrete floor slabs to finish the podium base.

Last edited by jammer139; May 2, 2026 at 12:53 PM.
Reply With Quote
     
     
  #65  
Old Posted May 1, 2026, 5:36 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,170
Maybe in the minority but I like the newest design, certainly a huge improvement from the initial concepts and what they have on the website now looks good.
Reply With Quote
     
     
  #66  
Old Posted May 2, 2026, 12:45 AM
Spoofy Spoofy is offline
Registered User
 
Join Date: May 2016
Posts: 125
Quote:
Originally Posted by MrSlippery519 View Post
Maybe in the minority but I like the newest design, certainly a huge improvement from the initial concepts and what they have on the website now looks good.
I think it's tasteful and nice as well, and that it will fit the neighbourhood appropriately. I personally think the Tricar has some of the nicest looking buildings around the City, not sure if that is a hot take or not!
Reply With Quote
     
     
  #67  
Old Posted May 13, 2026, 7:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
They have now completed the installs of the 4th floor precast concrete slabs including the roof of the 3s podium facing Talbot St. Should pickup the pace now that they are working on the 4th floor walls of the tower itself which has a smaller foot print.
Reply With Quote
     
     
  #68  
Old Posted May 30, 2026, 12:26 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Have started installing the 5th floor precast floor slabs.
Reply With Quote
     
     
  #69  
Old Posted Jun 5, 2026, 4:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
The 5th floor precast floor slabs are now installed and have started installing some of the 5th floor wall precast concrete wall panels.
Reply With Quote
     
     
  #70  
Old Posted Jun 13, 2026, 11:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Nearly done installing the 5th floor precast walls and posts and have already started installing some of the 6th floor precast floor slabs on the east end.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 7:01 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.